Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.5 LAdmitted-Finance | ₹40.5 L | L1 | Admitted-Finance |
| 2 | L2₹44.8 LAdmitted-Finance 205 PARSHAV VIHAR PLOT NO 50 IP EXTN PARPARGANJ DELHI 110092 | SHAHDARA | DELHI | 110092 | ₹44.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SANJEEV ENTERPRISES L2 | Continental Engineers and contractors L1 |
|---|---|---|---|---|---|
| 1.00 | M&L for periodic inspection/ Servicing of 2 Ton capacity 02 Nos EOT Crane of any make installed at different building/location in Airforce Station Sarsawa, making the crane in fully serviceable condition complete all as specified & directed as under:-
(A) LONG TRAVERSE MOTION-
(i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level.
(ii) Checking function of all LT Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any.
(iii) Checking of LT Wheels for any abnormal sound and checking mounting and fixing arrangement.
(iv) Checking of grase in geared coupling and tightening of nut and bolts etc.
(v) Checking of LT Motion cut-off at the extreme ends of bay length with L.T limit switches
(vi) Checking drive shaft and coupling including tightening of nut and bolts.
(vii) Checking of terminal connections of all LT motors and tightening properly including replacing burnt / overheated cable ends if any. | 4 | Each Job | 23,500 ₹94,000 | 20,000 ₹80,000 |
| 1.01(B) CROSS TRAVERSE MOTION (i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level. (ii) Checking function of CT Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any. (iii) Checking of CT Wheels for any abnormal sound and checking mounting and fixing arrangement. (iv) Checking of grase in geared coupling and tightening of nut and bolts etc. (v) Checking of CT Motion cut-off at the extreme ends of bay length with C.T limit switches (vi) Checking drive shaft and coupling including tightening of nut and bolts. (vii) Checking of terminal connections of CT motors and tightening properly including replacing burnt overheated cable ends if any. | |||||
| 1.02(C) HOIST MOTION (i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level. (ii) Checking function of all Hoist Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any. (iii) Checking of Equalizing pully / rope drum for any abnormal sound and checking mounting and fixing arrangement. (iv) Checking of grase in geared coupling and tightening of nut and bolts etc. (v) Checking of Hoist Motion cut-off at the extreme ends of up and down with rotary geared limit switches (vi) Checking drive shaft and coupling including tightening of nut and bolts. (vii) Checking of terminal connections of Hoist motors and tightening properly including replacing burnt / overheated cable ends if any. | |||||
| 1.03(D) ELECTRICALS (i) Checking and tightening all electric connection (ii) Checking the contactors/ relays etc for overheating or flashing. (iii) Cleaning off all connection and control cables. (iv) Properly bunching the loose control cable. (v) Checking functioning of cable carriers. | |||||
| 1.04(E) GROUND MOTION CONTROL PANEL (i) Opening the push button control unit, checking all connection, replacing flashed/ over heated connections, general cleaning and checking all the functions, of the LT/CT/ Hoist motion push buttons and lights switch including reassembling the unit complete Notes:- 1. Gear box oil shall be measured and paid separately. 2.Contractor's rep will visit once in 03 months, check and inspect every crane and on occurance of any fault during contract period take servicibility certificate duly signed by the users and MES Rep. 3. The inspection and serviceing work shall be carried out by contractor through any vender having minimum 05 years experiance of similar work in any state/central govt department approved by GE. | |||||
| 2.00 | Supply only Gear box oil EP -230 for EOT crane complete all as specified & directed. Note:- The record for replacement of Oil shall be maintain by Engineer -in- charge duly signed by all concern. | 4 | Litre | 650 ₹2,600 | 500 ₹2,000 |
| 3.00 | Supply only Brake oil for EOT crane complete all as specified & directed. Note :- The record for replacement of oil shall be maintain by Engineer -in- charge duly signed by all concern. | 2 | Litre | 550 ₹1,100 | 600 ₹1,200 |
| 4.00 | M&L in replacement of Flexible Cable of 01sqmm, 14 core for Pendent Push Button Station from Main Panel to Push Button Station on Newly fixed ‘C’-Track system suitable for 02 ton EOT Crane complete all as specified & directed. | 40 | RM | 750 ₹30,000 | 500 ₹20,000 |
| 5.00 | M&L in replacement of Unserviceable L.T and C.T Disc Brake with New disc brake of suitable size complete all as specified & directed.
Make : Megtech/ Cranex/ Pethe | 4 | Each | 9,400 ₹37,600 | 6,500 ₹26,000 |
| 6.00 | M&L in replacement of L.T & C.T box type limit switch with lever complete for 2 TON EOT Crane complete all as specified & directed.
Make : Megtech/ Cranex/ Pethe | 4 | Each | 4,500 ₹18,000 | 5,500 ₹22,000 |
Updated dates
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
3 May 2026, 6:00 pmClosed
CWE (AF) Ambala
CWE (AF) Ambala
CWE/AF AMB/SAR-T61/2025-26 REPAIR MAINT TO EOT CRANE LIFTS FIREFIGHTING AND FIRE ALARM SYSTEM AND OTHER MISC ITEMS AT AF STN SARSAWA UNDER GE AF SARSAWA
2026_MES_759023_1
CWE/AF AMB/SAR-T61/2025-26
Open Tender
Civil Works
270 days
AF Stn Sarsawa
For MES enlisted contractor Class D Category c (iii) and c (vi) and for un-enlisted contractor
refer NIT
9 documents required · 9 mandatory
₹500
Yes
GE (AF) Sarsawa
₹80,000
Yes
20 May 2026
2 Apr 2026
5 May 2026
2 Apr 2026
3 May 2026
20 Apr 2026
2 Apr 2026 - 15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
M&L for periodic inspection/ Servicing of 2 Ton capacity 02 Nos EOT Crane of any make installed at different building/location in Airforce Station Sarsawa, making the crane in fully serviceable condition complete all as specified & directed as under:-
(A) LONG TRAVERSE MOTION-
(i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level.
(ii) Checking function of all LT Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any.
(iii) Checking of LT Wheels for any abnormal sound and checking mounting and fixing arrangement.
(iv) Checking of grase in geared coupling and tightening of nut and bolts etc.
(v) Checking of LT Motion cut-off at the extreme ends of bay length with L.T limit switches
(vi) Checking drive shaft and coupling including tightening of nut and bolts.
(vii) Checking of terminal connections of all LT motors and tightening properly including replacing burnt / overheated cable ends if any. | - | Each Job | - | - | |
(B) CROSS TRAVERSE MOTION
(i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level.
(ii) Checking function of CT Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any.
(iii) Checking of CT Wheels for any abnormal sound and checking mounting and fixing arrangement.
(iv) Checking of grase in geared coupling and tightening of nut and bolts etc.
(v) Checking of CT Motion cut-off at the extreme ends of bay length with C.T limit switches
(vi) Checking drive shaft and coupling including tightening of nut and bolts.
(vii) Checking of terminal connections of CT motors and tightening properly including replacing burnt overheated cable ends if any. | - | - | - | - | |
(C) HOIST MOTION
(i) Checking gear box oil level , checking and rectification of leakage if any and filling with new gear box oil upto required level.
(ii) Checking function of all Hoist Brakes of any capacity and making adjustment for proper working including replacement of worn out parts if any.
(iii) Checking of Equalizing pully / rope drum for any abnormal sound and checking mounting and fixing arrangement.
(iv) Checking of grase in geared coupling and tightening of nut and bolts etc.
(v) Checking of Hoist Motion cut-off at the extreme ends of up and down with rotary geared limit switches
(vi) Checking drive shaft and coupling including tightening of nut and bolts.
(vii) Checking of terminal connections of Hoist motors and tightening properly including replacing burnt / overheated cable ends if any. | - | - | - | - | |
(D) ELECTRICALS
(i) Checking and tightening all electric connection
(ii) Checking the contactors/ relays etc for overheating or flashing.
(iii) Cleaning off all connection and control cables.
(iv) Properly bunching the loose control cable.
(v) Checking functioning of cable carriers. | - | - | - | - | |
(E) GROUND MOTION CONTROL PANEL
(i) Opening the push button control unit, checking all connection, replacing flashed/ over heated connections, general cleaning and checking all the functions, of the LT/CT/ Hoist motion push buttons and lights switch including reassembling the unit complete
Notes:- 1. Gear box oil shall be measured and paid separately.
2.Contractor's rep will visit once in 03 months, check and inspect every crane and on occurance of any fault during contract period take servicibility certificate duly signed by the users and MES Rep.
3. The inspection and serviceing work shall be carried out by contractor through any vender having minimum 05 years experiance of similar work in any state/central govt department approved by GE. | - | - | - | - | |
Supply only Gear box oil EP -230 for EOT crane complete all as specified & directed. Note:- The record for replacement of Oil shall be maintain by Engineer -in- charge duly signed by all concern. | - | Litre | - | - | |
Supply only Brake oil for EOT crane complete all as specified & directed. Note :- The record for replacement of oil shall be maintain by Engineer -in- charge duly signed by all concern. | - | Litre | - | - | |
M&L in replacement of Flexible Cable of 01sqmm, 14 core for Pendent Push Button Station from Main Panel to Push Button Station on Newly fixed ‘C’-Track system suitable for 02 ton EOT Crane complete all as specified & directed. | - | RM | - | - | |
M&L in replacement of Unserviceable L.T and C.T Disc Brake with New disc brake of suitable size complete all as specified & directed.
Make : Megtech/ Cranex/ Pethe | - | Each | - | - | |
M&L in replacement of L.T & C.T box type limit switch with lever complete for 2 TON EOT Crane complete all as specified & directed.
Make : Megtech/ Cranex/ Pethe | - | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_850188.xls
BOQ • 0.59 MB
Tender61T.pdf
Tender Documents • 1.00 MB
Download all tender documents and submit your bid