| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹26.7 L+₹54,200.72 (2.07%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹27.0 L+₹82,275.91 (3.15%)Admitted-Finance PURANA BETWA GHAT DISTRICT HAMIRPUR | HAMIRPUR | UTTAR PRADESH | 210301 | L3 | Admitted-Finance | |
| 4 | L4₹30.1 L+₹4.0 L (15.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹31.7 L+₹5.6 L (21.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹48.5 L
EMD Value
₹4.8 L
Closing Date
24 Jan 2026, 10:00 amClosed
Executive Enginior M.I. jalaun at Orai
Executive Enginior M.I. jalaun at Orai
DIGGING AND RENOVATION SAHAB POND BLOCK JALAUN DISTRICT JALAUN
2026_UPMID_1107270_1
886/MI/N-V.J.S. B.S.R.Y./2025-26
Open Tender
Civil Works
Percentage
45 days
JALAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
Executive Enginior M.I. jalaun at Orai
₹4.8 L
Yes
Executive Enginior M.I. jalaun at Orai
19 Feb 2026
19 Jan 2026
24 Jan 2026
19 Jan 2026
24 Jan 2026
19 Jan 2026
20 Jan 2026
ITEMS
Excavation in Earthwork in Mar, kabar, Ranker and Kankar mixed soil in digging including lead up to 30 M and lift upto 1.5M including dressing making profile and manual compaction but excluding mechanical compation. (U.P.I.D. S.I no. 4.05) = Total Earth work in Excava = 30% earth excavation by any means machine/labour
Earth work excavation by any means Machine/ labour in saturated soil Total Earth work in Excava = 70% (10 lift)
Excavation in Earthwork in Mar, kabar, Ranker and Kankar mixed soil in (Inlet, Outlet, Ramp)
Sand filling for foundation of Inlet, Outlet, Ramp.
C.C.in 1:3:6 Cement, Sand and 20 to 40 mm Stone ballast including the cost of materials labours and etc. required for proper completion of work. (Inlet, Outlet, Ramp)
R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. (Inlet, Outlet, Ramp)
supply and fixing of 1000mm dia NP3 hume pipe with collar (Inlet work)
C.C.in 1:2:4 Cement, Sand and 10 to 20 mm grit including the cost of materials labours and etc.to required for proper completion of work. (Inlet, Outlet, Ramp)
Raised struck pointing in 1:2 Cement sand mortar including the cost of material labour etc.to required for proper completion of work. (Inlet, Outlet, Ramp)
Dry stone boulder filling in D/S bed on Nala after floor. (Inlet, Outlet)
Dewatering during the work by 8 HP Diesel pumping set.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tender_Document.pdf
Tender Documents • 1.26 MB
BOQ_2043584.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .