| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
| 4 | Rejected-Technical PIMPALE TAL SANGAMNER DIST AHILYANAGAR MAHARASHTRA 422605 | SANGAMNER | AHILYANAGAR | MAHARASHTRA | 422605 | Rejected-Technical Reject |
| 5 | Rejected-Technical | Rejected-Technical Reject |
Tender Value
₹48.8 L
EMD Value
₹48,834
Closing Date
30 Jul 2026, 6:00 pmClosed
EE PWND ZP AHILYANAGAR
EE PWND ZP AHILYANAGAR
STBT to MSH 8 to Sakuri to ODR 222 Road Upasani Maharaj to Old Korhale Road Jalgaon Road VR 50 Km 1/500 to 4/00 Sakuri Tal Rahata Dist Ahilyanagar
2026_AHMED_1320758_1
ZP/PWND/3054/19/2025-26
Open Tender
Civil Works
Percentage
180 days
AHILYANAGAR
as per nit
2 documents required · 2 mandatory
₹590
₹48,834
16 Sept 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
30 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils | 955.8 | Cum | 119 | ₹1,13,740.2 |
| 2 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | 579.15 | Cum | - | - |
| 3 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). | 778.8 | Cum | 984.41 | ₹7,66,658.51 |
| 4 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 1,791.24 | Cum | 687.22 | ₹12,30,975.95 |
| 5 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | 778.8 | Cum | 85 | ₹66,198 |
| 6 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 1,791.24 | Cum | 79 | ₹1,41,507.96 |
| 7 | Compacting the sub grade/gravel/over size metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | 3,894 | Sqm | 27 | ₹1,05,138 |
| 8 | Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) | 3,540 | Sqm | 288.05 | ₹10,19,697 |
| 9 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | 3,540 | Sqm | 25.59 | ₹90,588.6 |
| 10 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | 3,540 | Sqm | 244.97 | ₹8,67,193.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_2263049.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .