| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC AOC awarded to L1 bidder i.e. Sri Sunil Mahajan |
| 2 | L2₹1.3 Cr+₹13.8 L (11.4%)Rejected-AOC 218 2ND FLOOR U S COMPLEX 120 MATHURA ROAD NEW DELHI 110076 | SOUTH | DELHI | 110076 | ₹1.3 Cr+₹13.8 L (11.4%) | L2 | Rejected-AOC AOC awarded to L1 bidder i.e. Sri Sunil Mahajan |
| 3 | Rejected-Technical | - | - | Rejected-Technical Submission of incomplete tender document |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-Already L1 bidder in Sector-5 Civil |
| 5 | Not Admitted-Finance H NO 41 SENAPATI PATH GNB ROAD P O SILPUKHURI P S CHANDMARI GUWAHATI 781003 | KAMRUP METRO | ASSAM | 781003 | - | - | Not Admitted-Finance Others-Already L1 bidder in Sector-2 Civil |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
4 Apr 2024, 2:00 pmClosed
HOS Maintenance
IPM Section, IIT Guwahati
Annual Maintenance Contract Services for plumbing and other building services at SECTOR- 3 of the campus
2024_IITG_800765_1
IITG/IPM/NIT/R/2023-24/78/C/3
Open Tender
Civil Works
Works
365 days
IIT Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.2 L
Yes
IPM Section, IIT Guwahati
26 Sept 2024
14 Mar 2024
5 Apr 2024
14 Mar 2024
4 Apr 2024
14 Mar 2024
27 Mar 2024
Amount
PART-A: Maintenance work
A)Attending complaints round the clock relating to water supply & distribution system & sanitary system of all water supply & sanitary installations, fittings and acessories of the building covered under the scope of work . The following works are included in this item :- (i) Rectifying the defects ii) Repairing, replacement of all fittings etc. iii) cleaning of concealed pipe lines 15 mm to 40 mm dia by using Air Compressor iv) sealing of leakage in undergrond/overground pipe lines, concealed pipes/valves/joints etc. v) cleaning of water cooler vi) Providing GI spout in the down slab and reparing of rain water and CI soil/vent pipe line including removing of weeds,shrub etc. vii) Cleaning/removing of all debries, weeds, shrub etc. from the slab and roof. viii) Cleaning of grass / jungle , garbage up to plinth protection area around the institue building mentionad above ix) Reparing and replacing of Ball Cock for water tank and x) all other related misc. works as necessary to maintain regular flow of water in pipes as well as in all intakes as per direction of engineer-in-charge. Required materials for replacement will be supplied by the Institute free of cost (Necessary tools & tackles & air compressor to be arranged by contractor at his own cost). B) Attending to complaints for fitting & fixing of tower bolts, Al drops, lock, door stopper, handle etc. in wooden doors, windows, ventilators etc. This scope also include opening of doors due to lock problem & replacement of door lock, broken glass opf doors, windows, ventilators etc. complete as directed by the Engineer-in-charge. Required materials for replacement will be supplied by the Institute free of cost (Necessary tools & tackles & air compressor to be arranged by the contractor at his own cost) (Area covered under the scope of work). C)Attending complaints repairing / replacement all types of aluminium works including replacement / rectification of defective door locks, fitting, fixing of handle, L-drop, tower bolt, hinges, door stopper etc.
Cleaning of roof area as well as sanitary & water pipe line shaft mentioned bellow, all types of scrap materials ,vegetation, removing of all debries,weeds,shrub etc. from the slab, roofs, shaft of pipe line of the buildings and disposal the same to a distance place from the buildings as per direction and to the satisfaction of Engineer-in-charge complete as required.
Cleaning of plinth area as mentioned bellow, all types of scrap materials ,vegetation, removing of all debries,weeds,shrub etc. from the buildings and disposal the same to a distance place from the buildings as per direction and to the satisfaction of Engineer-in-charge complete as required.
Sub total amount of Part A: Maintenance work for 12 months as per manpower analysis at Annexure-A
PART-B: Development works
Sub total amount of Part B: Development works for 12 months at Annexure-B [Inclusive of GST]
Bidder have to quote in next two sheets (PartA and PartB) and fingure will be automatically filled in this Abstract sheet.
Please ensure to quote rate in every item (blue box). If any item is left unquoted in next two sheets (PartA and PartB), the tender will be rejected
CIS GLOBAL INFRATECH PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .