Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical | Rejected-Technical Documents are not fullfield according to bid condision |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 3 | Rejected-Technical INDRA AWAS COLONY SANWASA TEHSIL LALSOT DISTRICT DAUSA RAJASTHAN | Rejected-Technical Documents are not fullfield according to bid condision |
Tender Value
₹27.8 L
EMD Value
₹55,629
Closing Date
30 Jul 2026, 6:00 pmClosed
SE WDSC
OFFICE OF SE WDSC ZILA PARISHAD SAWAI MADHOPUR COLLECTRATE COMPUSOFFICE OF WDSC
24 Works under NRM head MJSA 2.2 Block Bonli
2026_WDSC_577469_1
MJSA 2.2 Block Bonli
Open Tender
Civil Works
Percentage
120 days
BLOCK BONLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
SE WDSC/MDRISL
₹55,629
7 Aug 2026
25 Jul 2026
31 Jul 2026
25 Jul 2026
30 Jul 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Details | |||||
| 1.01 | Jungle clearance by scaping of grass and shrubs | 32,862.9 | Sqm | 2.86 | ₹93,987.89 |
| 1.02 | Dag belling 5 cm to 7.50 cm Deep | 12,840.29 | Mt | 1.71 | ₹21,956.9 |
| 1.03 | Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50 mt and lift up to 1.5 m | 267.38 | Cum | 97 | ₹25,935.86 |
| 1.04 | 15 से 30 सेमी मोटे हथोड़े से तरासे हुए एकल पत्थर की पिचिंग समस्त उठान के साथ, आपूर्ति के साथ । | 12.6 | Cum | 1,442.18 | ₹18,171.47 |
| 1.05 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) | 28,276.57 | Cum | 58.35 | ₹16,49,937.86 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated
earth within initial lead of 50m and lift up to 1.5m including dressing of
excavated area and dewatering wherever required complete in all respect. Hard / dense soil | 16.8 | Cum | 95 | ₹1,596 |
| 3 | Compaction of earth or highly weathered strata by manually or plain roller. (Density 90% proctor) | 1,994.53 | Cum | 25 | ₹49,863.25 |
| 4 | Watering of earth including cost of carriage of water when source of water is up to 1km | 1,994.53 | Cum | 12.6 | ₹25,131.08 |
| 5 | Pipe outlet हेतु आरसीसी.(रेन्फोसमेंट सीमेंट कंक्रीट)NP3 ह्युम पाइप एक पंक्ति में आवश्यक ढलान देते हुए सीमेंट मसाला 1:2 में बिछाने/लगाने का कार्य मय कोलर सहित |(मिटटी खुदाई, कंक्रीट व चिनाई कार्य के अलावा)-450/500 MM | 469.8 | RM | 1,725.98 | ₹8,10,865.4 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BNL.pdf
Tender Documents • 2.19 MB
BOQ_1026316.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .