Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.1 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDARI SHAHDOL MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484110 | L-1 | Accepted-AOC Awarded as L-1 | |
| 2 | Rejected-Technical BYPASS TIRAHA ROAD SHAHDOL DISTT SHAHDOL MP | SHAHDOL | SHAHDOL | MADHYA PRADESH | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹20.9 L
EMD Value
₹26,200
Closing Date
5 Apr 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staf Officer Mining
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Installation of Gate belt (1000mm) for proposed development/Dep. Panel CM 6 and CM 7 (VII Seam)at Bangwar UG Mine, SGP Area
2025_SECL_333005_1
SECL/SGP/SO(M)/e-T/35/24-2 5/681 Dt020.03.2025
Open Tender
Civil Works - Others
Item Rate
150 days
Bangwar UG MIne
As per NIT
8 documents required · 8 mandatory
₹26,200
16 May 2025
20 Mar 2025
7 Apr 2025
20 Mar 2025
5 Apr 2025
21 Mar 2025
20 Mar 2025 - 29 Mar 2025
Amount
Item Description/ Heading Part (A) labour CostAs per GMSR-2024
Dismantling of belt structure along with PVC belt (800mm/1000mm) including cleaning stacking the same within a distance of 50m (i)Along 46LW/MD2 to 18D =550m. From Panel CM-6 TO CM-7 (VII seam)
Transportation of steel structures materials from surface to underground through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination OR Transportation of all dismentaled steel structures materials in ug from one section to others section or ug to surface through haulages with tramming & pushing, coupling /uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. (For additional lead for every 1.0 Km beyond original 1.0 Km, there will be 15% enhance in) TOTAL 8.30 Te. + 5.51 Te.=13.81 Te.
Transportation of PVC belt (1000/1200mm) from surface to u/g or one section to other section in u/g through haulages with tramming, pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading, unloading & stacking the same at destination. CM-6=550x2=1100m, CM-7=525x2=1050m Common for both panel MD2=240x2=480m, Total =2630m (For additional lead for every 1.0 Km beyond original 1.0 Km, there will be 15% enhance in)
Installation/erection of complete belt conveyor structure (1000mm/1200mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc completeLocation Panel CM-6-46LW/MD2 TO 18D = 550m, Panel CM-7 42LW/MD2 TO 13D =385m. & 6R/42L TO 36L=140M, Common for both panel MD2/37L TO 46&1/2L =240m., Total Length =1315m
Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of Belt conveyor
Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually.
Transportation and Installation of 02 Nos. Double drum drive head & 01 Nos. Sigle Drum Drive head in Development/ dep. Panel CM-6 & CM-7 of VII Seam in Bangwar UG Mine PART-A (Labour Cost):- As per GMSR-2024 Cutting in soft stone by chisel & hammer for digging of pits of foundation work- a) for drive head- For Double drum drive head: 01 No. (5.00x1.00x1.00 = 5.00 m3 (5.00x0.50x1.00 = 2.50 m3 (4.00x0.50x1.00 = 2.00 m3. (0.50x0.50x1.00) x 04 = 1.00m3 Total = 10.50m3 02 Nos. Double drum drive head x 10.50m3 =21.00m3 For Single drum drive head: 01 No. (0.60x0.60x1.00)×04 . = 1.44 m3 01 Nos. Single drum drive head x 1.44m3 =1.44m3 Total = 02 nos double drum drive head and 01 no single drum drive head for panel D1 & D2 (Total 21.00M3 +1.44M3=22.44M3)
Cement Concrete/PCC (1:2:4) in foundation /plinth / flooring (any thickness) in u/g (Excluding centring, shuttering and cost of materials) For Double drum drive head: 01 No. (5.00x1.00x1.30 = 6.50 m3 (5.00x0.50x1.30 = 3.25 m3 (4.00x0.50x1.30 = 2.60 m3 (0.50x0.50x1.30) x 04 nos = 1.30m3 Total = 13.65m3 02 Nos. Double drum drive head x 13.65m3 =27.30m3 For Single drum drive head: 01 No. (0.60x0.60x1.30)×04 Nos .= 1.87 m3 01 Nos. Single drum drive head x 1.87m3 =1.87m3 (Total 27.30M3 + 1.87M3=29.17M3)
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. For Double drum drive head: 01 No. (5.00+1.00+1.00)x 0.30=2.10m2 (5.00+0.50+0.50)x 0.30=1.80m2 (4.00+4.00+0.50+0.50)x 0.30=2.70 m2 (0.50+0.50+0.50+0.50)x 4=8.00m2x0.30 = 2.40 m2 Total = 9.00m2 02 Nos. Double drum drive head x 9.00m2 =18.00m2 For Single drum drive head: 01 No. (0.60+0.60+60.60) × 04 Nos .= 9.60 × 0.30 = 2.88 m2 01 Nos. Single drum drive head x 2.88m2 =2.88m2 (Total 18.00M2 + 2.88M3=20.88M2)
Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m.(Calculation sheet enclosed Cement
20mm Stone agreegate
TraTransportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 2.0 Km or part there of and bringing the empty tubs to surface. (Calculation sheet enclosed) Cement
20mm Stone agreegate
Unloading of all kind of building materials from tubs at destination in u/g and stacking the same. (Calculation sheet enclosed) Cement
20mm Stone agreegate
Installation of 800mm drive head (Single drive drum) with all accessories(without loop take-up) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge/ Engineer.
Installation of 1000 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge
Dismantling & transportation of 1000mm drive head (double drive drum) with loop take up and all accessories(like as motor, gear box, drive drum, garders, frame, chute and side plate etc.) with lead of 100m/up to track end in u/g.
Part-B Material Cost supply and stacking of building materials Cement
20 mm Stone aggregate
Total impact of GST for the purpose of CTC
M/S D K SINGH (BID ID -1146288)
techsummary_345190.pdf
PDF • 0.24 MB
finsummary_345190.pdf
PDF • 0.27 MB
Loi681.pdf
PDF • 1.83 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .