Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-AOC | ₹17.2 L Quoted ₹20.2 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹25.6 L+₹5.3 L (26.4%)Rejected-Finance | ₹25.6 L+₹5.3 L (26.4%) | L2 | Rejected-Finance Second Lowest Bidder |
| 3 | L3₹26.5 L+₹6.2 L (30.8%)Rejected-Finance AT PO GREENBADI P S DARINGBADI DIST KANDHAMAL ODISHA PIN 762104 | GREENBADI | KANDHAMAL | ODISHA | 762104 | ₹26.5 L+₹6.2 L (30.8%) | L3 | Rejected-Finance Third Lowest Bidder |
Tender Value
₹27.1 L
EMD Value
₹54,200
Closing Date
20 Feb 2026, 5:00 pmClosed
General Manager (Estates)
OSRTC, Paribahan Bhawan, Sachivalaya Marg, bbsr
Construction of Boundary wall ( Near Fresh Room) at parivhan bhawan , Bhubaneswar
2026_OSRTC_125550_1
04
Open Tender
Civil Works - Buildings
Percentage
OSRTC, Paribahan Bhawan, Sachivalaya Marg, bbsr
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹54,200
Yes
12 Aug 2026
5 Feb 2026
21 Feb 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil in exacavation of foundation trenches within 50 m. initial lead and 1.5 m.initial lift including all costs of labour materials required for the work etc complete and as per direction of Engineer-in-charge | 116.53 | Cum | 303.82 | ₹35,404.14 |
| 2 | Filling sand in foundation and plinth watering, ramming, consolidating and dressing labours tools,taxes etc all complete as per specification and direction of E.I.C. | - | Cum | 518.1 | - |
| 3 | Cement concrete (1:4:8) with 4 cm. Down grade size crusher broken hard granite metal laying in 150/100mm thick ramming, compacting to proper thickness.,watering, curing. | - | Cum | 5,656.47 | - |
| 4 | F.A brick masonary work in cement mortar (1:6) using F.A bricks of 23cm x 11cm x 8cm having crushing strength not less than 35kg per sqcm with dimensional tolerance +/- 2% including watering, curing and cost, conveyance, royalty of all materials and cost of labour etc complete.
IN FOUNDATION & PLINTH | 61.68 | Cum | 6,113.88 | ₹3,77,104.12 |
| 5 | Brick work in cement mortar (1:6) in super structure having crushing strength not less than 75.00 kg/cm2 immerging the bricks in water not less than six hours before use in masonary. | 121.92 | Cum | 6,146.88 | ₹7,49,427.61 |
| 6 | Providing and laying reinforced cement concrete of M-25 grade with 20 mm and down grade black hard granite(Crusherbroken) chips including cost of all materials, labours T&P etc.with centring and shuttering Complete but excluding the cost of reinforcement. | 47.94 | Cum | 6,082.92 | ₹2,91,615.18 |
| 7 | Rigid & smooth centering and shuttering false,levelled works and dismantling , then after casting including cost of materials complete for plinth band and column footing. | - | Cum | 246.94 | - |
| 8 | Rigid and smooth centering and shuttering of RCC works including false works griders,beams,column including removal of form work at all depth and heights. | 171.09 | Cum | 1 | ₹170.92 |
| 9 | Cutting, bending, binding and tying the grills and placing in position of steel reinforcement. | 50.2 | Qntl | 1 | ₹50.15 |
| 10 | Supplying, fitting and fixing of M.S grills, M.S angles including cost of labour materials transportation etc.complete. | 780 | Kg | 99.4 | ₹77,532 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_579411.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
DTCN.pdf
Tender Documents • 1.55 MB
BoQ2.xls
Tender Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .