| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.0 LAccepted-AOC TAMIL NADU TN | ₹18.0 L | 1 | Accepted-AOC Tender Coated as per Estimated Amount |
| 2 | 2₹18.0 LRejected-Finance D NO 7 267 YELLANALLI KETTI PO | VELLORE | TAMIL NADU | 632001 | ₹18.0 L | 2 | Rejected-Finance Tender Coated above Estimated Amount |
| Sl No | Description | Qty | Unit | chandrasekar L2 | BHAVANI AMMAN ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 71 | CUM | 5,347 ₹3.8 L | 5,344.5 ₹3.8 L |
| 2.00 | Centering charges for all CC items of works including all labour charges etc., complete. | 49.7 | SQM | 185 ₹9,194.50 | 182 ₹9,045.40 |
| 3.00 | Cement Concrete 1:4:8 using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 71 | CUM | 2,466 ₹1.8 L | 2,464 ₹1.7 L |
| 4.00 | Plain Cement Concrete 1:1.5:3 using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 53.25 | CUM | 7,177 ₹3.8 L | 7,175.5 ₹3.8 L |
| 5.00 | Towards cost of expansion Joint with Bitumen pad including all other charges etc., complete | 9.75 | SQM | 480 ₹4,680 | 478 ₹4,660.50 |
| 6.00 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 136.32 | CUM | 265 ₹36,124.80 | 263.5 ₹35,920.32 |
| 7.00 | Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete. | 17.04 | CUM | 1,738 ₹29,615.52 | 1,736 ₹29,581.44 |
| 8.00 | Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete | 17.04 | CUM | 5,350 ₹91,164 | 5,344 ₹91,061.76 |
| 9.00 | Centering charges for all CC items of works including all labour charges etc., complete. | 340.8 | SQM | 275 ₹93,720 | 273.5 ₹93,208.80 |
| 10.00 | Cement concrete 1:2:4 mix using 20mm metal including all other labour charges for laying, watering and curing charges etc., complete | 45.16 | CUM | 6,637 ₹3.0 L | 6,635 ₹3.0 L |
Tender Value
₹18.3 L
EMD Value
₹19,000
Closing Date
6 Mar 2026, 3:00 pmClosed
The Block Developement Office (BP)
The Block Developement Office (BP)
PROVIDING CEMENT CONCRETE ROAD WITH CC DRAIN TO SAKTHI NAGAR MAIN ROAD IN THIRUSULAM PANCHAYAT AT PUNITHATHOMAIYARMALAI PANCHAYAT UNION. SCHEME OF CG-SAVINGS AND INTEREST FUND ESTIMATE AMOUNT RS.18.30 LAKHS
2026_RDTN_669389_1
1002/2025/A2, dt. 03.03.2026,
Open Tender
Civil Works - Roads
120 days
THIRUSULAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹19,000
Yes
12 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Centering charges for all CC items of works including all labour charges etc., complete.
Cement Concrete 1:4:8 using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Plain Cement Concrete 1:1.5:3 using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Towards cost of expansion Joint with Bitumen pad including all other charges etc., complete
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete.
Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete
Centering charges for all CC items of works including all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm metal including all other labour charges for laying, watering and curing charges etc., complete
Plastering with cm 1:5 mix, 12mm thick including all other labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_804315.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TENDER.pdf
Tender Documents • 0.53 MB
BOQ_804315.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid