Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 CONTRACTOR |
| 2 | L2₹1.4 CrRejected-Finance | ₹1.4 Cr | L2 | Rejected-Finance L2 CONTRACTOR |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
10 May 2023, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Madurai District Alanganallur Block Under MGSMT 2022-2023 Strengthening with 5 years maintenance of valaiyapatty- manjamalai Road Package No TN MDU-ALA-05
2023_RDTN_306131_1
735/2023/D6/ALA05
Open Tender
Civil Works
180 days
ALANGANALLUR
Refer Tender document
4 documents required · 4 mandatory
₹0
₹1.4 L
24 Jun 2023
25 Apr 2023
10 May 2023
25 Apr 2023
10 May 2023
29 Apr 2023
Amount
Strengthening and Black Topping Road of Valayapatti Manjamalai Road KM 0/0-2/4 ( R- 74 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Construction Of 2 x 3 m span culvert (Sub Estimate)
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Culvert @ 0/150
Supplying and filling of filling sand for foundation from approved quarry including cost and conveyance to work site and as directed by the dept officers etc complete.
Culvert @ 0/150
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Culvert @ 0/150
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Below GL
Above GL
Cement concrete 1:3:6 mix using 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Culvert @ 0/150
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Culvert @ 0/150
Reinforcement cement concrete 1:1.5:3 mix using 20mm graded HBG metal including all cost and conveyance of materials and labour charges etc., complete
Culvert @ 0/150
Supply and fixing of 20 mm Thick Bitumen Tar Pad
Culvert @ 0/150
Supply and fixing of 100 mm PVC Pipe for Wheep Holes
Culvert @ 0/150
Providing and laying of US Gravel Between Abutment for Approches Culvert inculding cost and conveyance of all charges etc.compltete
Culvert @ 0/150
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Metal beam Crash Barrier Type "A" Double Guard
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Valayapatti Manjamalai Road KM 0/0-2/4 ( R- 74 ) at Alanganallur Panchayat Union
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
AVS & CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid