Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 CrAccepted-AOC VILLAGE JALALPUR PO BAHADURGARH DISTRICT PATIALA | ₹1.9 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.9 Cr+₹1.1 L (0.59%)Rejected-AOC GIDDERBAHA PUNJAB | ₹1.9 Cr+₹1.1 L (0.59%) | 2 | Rejected-AOC L2 |
| 3 | 3₹2.0 Cr+₹11.7 L (6.25%)Rejected-AOC | ₹2.0 Cr+₹11.7 L (6.25%) | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | R K ENGINEERS L1 | M/S Sanjeev Sehgal Contractor L2 | JASWINDER SINGH CHAHAL GOVT CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of brick Masonry in cement (CSR item no. 8.5-b | 1 | Cum | 200 ₹17,91,186 | 132 ₹11,82,182.76 Lowest | 132 ₹11,82,182.76 Lowest |
| 2.00 | E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth) (CSR Item no. 19.19-a) | 1 | Cum | 192 ₹58,116.48 | 128 ₹38,744.32 Lowest | 191 ₹57,813.79 |
| 3.00 | Dressing of side slopes and preparation of sub grade for lining complete in all respect as per PWD specifications and engineer-in-charge. (CSR item no. 19.2) | 1 | Sq.Mtr | 36 ₹4,81,444.2 | 35 ₹4,68,070.75 Lowest | 41 ₹5,48,311.45 |
| 4.00 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (Vertical or battering) (CSR item no. 9.1) | 1 | Sq.Mtr | 99 ₹17,10,283.41 | 89 ₹15,37,527.51 Lowest | 99 ₹17,10,283.41 |
| 5.00 | Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge. (CSR item no. 19.12) | 1 | Sq.Mtr | 160 ₹6,68,332.8 | 159 ₹6,64,155.72 Lowest | 175 ₹7,30,989 |
| 6.00 | Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic to the site in transit computerized transported mixers with an average lead of 1 Km (FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (Without mechanical Paver) (CSR item no. 19.40) | 1 | Cum | 167 ₹1,51,707.81 | 166 ₹1,50,799.38 Lowest | 183 ₹1,66,242.69 |
| 7.00 | Providing and laying cement concrete (M-15) for coping & Sleepers mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge. (CSR item no. 19.40) | 1 | Cum | 19 ₹3,39,435 | 18 ₹3,21,570 Lowest | 18 ₹3,21,570 Lowest |
| 8.00 | Extra bitumen painting at 0.69 kg per sqm. Priming coat as per IS 3384-1985 for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.(CSR item 13.54) | 1 | Sq.Mtr | 222 ₹2,11,122 | 205 ₹1,94,955 Lowest | 221 ₹2,10,171 |
| 9.00 | Laying LDPE film of 150 microm over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge. (CSR item no. 3/M-73) | 1 | Kg | 23 ₹4,44,556.65 | 19 ₹3,67,242.45 Lowest | 24 ₹4,63,885.2 |
| 10.00 | Filling expansion joints with special impervious hot pour 12.5 mm wide. (CSR item no. 19.16) | 1 | per m per cm depth | 6,300 ₹68,85,900 Lowest | 6,736 ₹73,62,448 | 7,100 ₹77,60,300 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
23 Oct 2025, 10:00 amClosed
Xen Fazilka Canal And Ground Water Division CC FZR
Xen Fazilka Canal And Ground Water Division CC FZR
Estimate for Relining of Barkatwah Minor Rd 0-10000 and Reconstruction/Remodeling of Pucca Structures and other allied works of Barkatwah Minor.
2025_WR_139344_1
002/FazilkaCanal/2025-26 dated 25/04/2025
Open Tender
Civil Works - Canal
Item Wise
Xen Fazilka Canal And Ground Water Division CC FZR
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹4.4 L
Yes
Xen Fazilka Canal And Ground Water Division CC FZR
25 Nov 2025
28 Apr 2025
23 Oct 2025
28 Apr 2025
23 Oct 2025
28 Apr 2025
7 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_281789.xls
BOQ • 0.31 MB
SBD01.pdf
Tender Documents • 16.47 MB
Corrigendum_002_33.pdf
PDF • 0.10 MB
Corrigendum_002_32.pdf
PDF • 0.10 MB
Corrigendum_002_31.pdf
PDF • 0.10 MB
Corrigendum_002_30.pdf
PDF • 0.10 MB
Corrigendum_002_29.pdf
PDF • 0.17 MB
Corrigendum_002_28.pdf
PDF • 0.19 MB
Corrigendum_002_27.pdf
PDF • 0.18 MB
Corrigendum_002_26.pdf
PDF • 0.18 MB
Corrigendum_002_25.pdf
PDF • 0.18 MB
Corrigendum_002_24.pdf
PDF • 0.18 MB
Corrigendum_002_23.pdf
PDF • 0.17 MB
Corrigendum_002_22.pdf
PDF • 0.18 MB
Corrigendum_002_21.pdf
PDF • 0.18 MB
Corrigendum_002_20.pdf
PDF • 0.21 MB
Corrigendum_002_19.pdf
PDF • 0.21 MB
Corrigendum_002_18.pdf
PDF • 0.21 MB
Corrigendum_002_17.pdf
PDF • 0.21 MB
Corrigendum_002_16.pdf
PDF • 0.21 MB
Corrigendum_002_15.pdf
PDF • 0.21 MB
Corrigendum_002_14.pdf
PDF • 0.21 MB
Corrigendum_002_13.pdf
PDF • 0.21 MB
Corrigendum_002_12.pdf
PDF • 0.21 MB
Corrigendum_002_11.pdf
PDF • 0.21 MB
Corrigendum_002_10.pdf
PDF • 0.21 MB
Corrigendum_002_09.pdf
PDF • 0.21 MB
Corrigendum_002_08.pdf
PDF • 0.22 MB
Corrigendum_002_07.pdf
PDF • 0.22 MB
Corrigendum_002_06.pdf
PDF • 0.22 MB
Corrigendum_002_05.pdf
PDF • 0.13 MB
Corrigendum_002_04.pdf
PDF • 0.13 MB
Corrigendum_002_03.pdf
PDF • 0.13 MB
Corrigendum_002_02.pdf
PDF • 0.13 MB
Corrigendum_002_01.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .