Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹94.2 L+₹5.6 L (6.29%)Rejected-Finance | L2 | Rejected-Finance Higher Amount Quoted. | |
| 3 | L3₹94.8 L+₹6.2 L (6.98%)Rejected-Finance | L3 | Rejected-Finance Higher Amount Quoted. | |
| 4 | L4₹95.1 L+₹6.5 L (7.35%)Rejected-Finance | L4 | Rejected-Finance Higher Amount Quoted. | |
| 5 | L5₹95.5 L+₹6.9 L (7.80%)Rejected-Finance | L5 | Rejected-Finance Higher Amount Quoted. |
Tender Value
₹92.5 L
EMD Value
₹1.9 L
Closing Date
1 Jun 2023, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SA, ASI, Guwahati Circle
Office of the Superintending Archaeologist, Archaeological Survey of India, Guwahati Circle, 5th Floor, West End Block, HOUSEFED Complex Beltola -Basistha Road, Guwahati -781006
Please refer tender notice
2023_ASI_753129_1
2/179-W/2023-24
Open Tender
Civil Works - Others
Works
90 days
Charaideo
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.9 L
Yes
ASI, Guwahati Circle
14 Jul 2023
13 May 2023
2 Jun 2023
13 May 2023
1 Jun 2023
13 May 2023
22 May 2023
Amount
Description
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Concrete of M30 grade with minimum cement content of 350 kg /cum
Centering and shuttering including strutting, propping etc. and removal of form for: Arches, domes, vaults up to 6 m span
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Provision for fixing of special size bricks (25x17x4 cm) to the arch ceiling of the vaulted passage and pathways inside with 70 % new bricks and 30% old bricks from site
Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand)
Provision for pointing & edging of the walls etc. with lime-sand-surkhi mortar (1:1:1) mixing with organic materials after racking the joints of wall surface including cleaning, washing etc. complete
Provision for laying of EPDM sheets on the dome surface of maidam no. 2.
Provision for transportation and carriage of construction materials from entrance gate by head load (more than 200mtrs)
Provision for electrification of the vaulted passages with all necessary wires, bulbs,switches, MCB etc. complete in all respect.
Provision for stacking of temporary sand filled bags to the sides of the Maidam to retain the earth during construction of the vaulted passage
ILEN GOGOI
MANASH JYOTI DEKA
PARTHA KAR
Balin Deka
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .