| Sl No | Description | Qty | Unit | M/S BHASKAR SHARMA CONTRACTOR L1 | M/S MOHEED KHAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick Bushes and thorny jungle without uprooting, complete in all respect as directed by Engineer in Charge. | 7,047 | Sqm | 3 ₹21,141 Lowest | 3.41 ₹24,030.27 |
| 2.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 1,788 | Cum | 42 ₹75,096 Lowest | 48.8 ₹87,254.4 |
| 3.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 200M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 385 | Cum | 100 ₹38,500 Lowest | 117 ₹45,045 |
| 4.00 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. complete all as directed by Engineer in Charge. | 9,195 | Sqm | 3 ₹27,585 Lowest | 3.48 ₹31,998.6 |
| 5.00 | V.R.B. or bridge clearance in Minors, complete in all respect as directed by Engineer in Charge. | 14 | Nos. | 500 ₹7,000 Lowest | 511.5 ₹7,161 |
| 6.00 | B/W in 1:4 Cement & Coarse Sand including cost of material labour and T&P etc Complete all as specified and directed by Engineer-in-charge. | 1 | Cum | 5,800 ₹5,800 | 4,278.19 ₹4,278.19 Lowest |
| 7.00 | 12mm thick Plaster in 1:4 Cement Mortar including cost of all material, labour, T&P etc. complete for proper completion of work all as specified and directed by Engineer-in-charge. | 12 | Sqm | 200 ₹2,400 | 157.67 ₹1,892.04 Lowest |
| 8.00 | Finishing of Walls with water proofing cement paint of approved make such as super snowcem,Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials labour T&P etc. complete as per directed by Engineer in Charge. | 23.3 | Sqm | 50 ₹1,165 | 44.17 ₹1,029.16 Lowest |
| 9.00 | Letter & Number Writing including all cost of materail labour T&P etc. Completed all as specified and as directed by Engineer-in-Charge. | 45 | Each | 12 ₹540 | 10.85 ₹488.25 Lowest |
| 10.00 | Painting gauge including all cost of material labour T&P etc.Completed all as specified and as directed by Engineer-in-Charge. | 1 | RM | 180 ₹180 | 142.6 ₹142.6 Lowest |
Tender Value
₹2.6 L
EMD Value
₹6,000
Closing Date
19 Sept 2026, 12:00 pmClosed
executive engineer
UMBDGC KHURJA
silt clearence work
2026_UPIDC_1185339_14
05/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹6,000
Yes
2 Oct 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick Bushes and thorny jungle without uprooting, complete in all respect as directed by Engineer in Charge. | 7,047 | Sqm | - | - |
| 2 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 1,788 | Cum | - | - |
| 3 | Earth work in silt clearance including lift up to 1.5 M and lead up to 200M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 385 | Cum | - | - |
| 4 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. complete all as directed by Engineer in Charge. | 9,195 | Sqm | - | - |
| 5 | V.R.B. or bridge clearance in Minors, complete in all respect as directed by Engineer in Charge. | 14 | Nos. | - | - |
| 6 | B/W in 1:4 Cement & Coarse Sand including cost of material labour and T&P etc Complete all as specified and directed by Engineer-in-charge. | 1 | Cum | - | - |
| 7 | 12mm thick Plaster in 1:4 Cement Mortar including cost of all material, labour, T&P etc. complete for proper completion of work all as specified and directed by Engineer-in-charge. | 12 | Sqm | - | - |
| 8 | Finishing of Walls with water proofing cement paint of approved make such as super snowcem,Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials labour T&P etc. complete as per directed by Engineer in Charge. | 23.3 | Sqm | - | - |
| 9 | Letter & Number Writing including all cost of materail labour T&P etc. Completed all as specified and as directed by Engineer-in-Charge. | 45 | Each | - | - |
| 10 | Painting gauge including all cost of material labour T&P etc.Completed all as specified and as directed by Engineer-in-Charge. | 1 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2230613.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .