| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹13.2 L+₹48,406.94 (3.81%)Rejected-Finance | L2 | Rejected-Finance HIGH RATE BIDDER | |
| 3 | L3₹13.5 L+₹74,027.79 (5.82%)Rejected-Finance 0 272 273 1 | L3 | Rejected-Finance HIGH RATE BIDDER | |
| 4 | L4₹13.7 L+₹95,343.74 (7.50%)Rejected-Finance | L4 | Rejected-Finance HIGH RATE BIDDER | |
| 5 | L5₹13.7 L+₹1.0 L (7.93%)Rejected-Finance | L5 | Rejected-Finance HIGH RATE BIDDER |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
24 Nov 2023, 3:00 pmClosed
EE SNK 4 BAHRAICH
OFFICE OF THE EE SNK 4 BAHRAICH
Construction of V.R.B. cum fall at Km. 3.560 of Arnahwa Minor.
2023_UPIDC_862123_3
02/EE/SNK-4/2023-24
Open Tender
Civil Works
Item Rate
90 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹33,000
9 Jan 2024
16 Nov 2023
24 Nov 2023
16 Nov 2023
24 Nov 2023
16 Nov 2023
Amount
E/W in digging foundation in all type of soil including all lead, lift and back filling and disposal of surplus earth for proper completion of work.
Laying plain cement concrete in 1:3:6 in foundation with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T & P etc. With manual compaction required for proper completion of work.
1st Class brick work in 1:4 C.M. with hamirpur coarse sand of F.M not less than 2.0 including all taxes, cost of all material, labour and T&P. required for proper completion of work.
Laying RCC 1:1.5:3 using 4.75 mm to 20 mm size crushed kabrai stone grit with hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T & P etc. except steel with mechanical compaction required for proper completion of work.
Centering and shuttering for C.C. & R.C.C. work upto 10m span including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Cutting, bending, binding & placing of steel reinforcement in proper position including all taxes, cost of binding wire, steel, labour and T&P etc. required for proper completion of work.
Cement pointing (Struck deep) in 1:2 cm with hamirpur fine coarse sand including all taxes, cost of all material, labour & T & P etc. required for proper completion of work.
Two coats bitumen painting with two layers of Tarfelt again followed by Two coats bitumen painting before laying R.C.C. Slab including cost of all material, labour & T&P. required for proper completion of work.
S/F 20 mm thick Joint filler board in construction joint including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
E/W in embankment in making ramp and bank in all type of soil including all leads, lifts, royalty with proper dressing & mechanical compaction for proper completion of work.
S.O.B brick on edge soling including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
S/F Wheel guard stone including cost of all material, labour & T&P. by manufacturing at site including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
Dewatering with all cost of power, P.O.L., machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work.
E/W in embankment in making road diversion in all type of soil including all leads, lifts, royalty with proper dressing & mechanical compaction for proper completion of work.
M/S P.K ENTERPRISES
M/s TRISHIRA CONSTRUCTION PVT.LTD
Salahuddin
SHABBIR ALI CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .