| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L | L1 | Accepted-AOC OK |
| 2 | L2₹4.4 LRejected-Finance | ₹4.4 L | L2 | Rejected-Finance REJECT |
| Sl No | Description | Qty | Unit | S S INFRA L2 | M/S JAYAM MAARUTHI ELECTRICALS L1 |
|---|---|---|---|---|---|
| 1.00 | Removing pump From the bed in the booster station conveyed to work shop. | 2 | No | 3,009 ₹6,018 | 2,994 ₹5,988 |
| 2.00 | Supply of Bearing NU 316 DE Side labour Charges for old bearing reomove and fixing the new bearing and etc., | 2 | No | 19,859 ₹39,718 | 19,760 ₹39,520 |
| 3.00 | Supply of Bearing 6316 NDE Side labour Charges for old bearing reomove and fixing the new bearing and etc., | 2 | No | 10,832 ₹21,664 | 10,778 ₹21,556 |
| 4.00 | Lathe Work of Motor cover DE and NDE Costing Sleeve turning and Grainding Charge | 2 | No | 4,213 ₹8,426 | 4,192 ₹8,384 |
| 5.00 | Lathe Work of Rotor Shaft Welding and grainding charge. | 2 | No | 6,018 ₹12,036 | 5,988 ₹11,976 |
| 6.00 | Supply and delivery of Terminal Board | 4 | No | 4,213 ₹16,852 | 4,192 ₹16,768 |
| 7.00 | Supply and delivery of Tyer Couppler (Spare 2 nos) | 4 | No | 3,811 ₹15,244 | 3,792 ₹15,168 |
| 8.00 | Rotor Balanceing Charges | 2 | No | 4,012 ₹8,024 | 3,992 ₹7,984 |
| 9.00 | Re-erecting the motor in the sump, testing and Commissioning.and Spare motor Eeerection. | 2 | Job | 3,009 ₹6,018 | 2,994 ₹5,988 |
| 10.00 | Conveyance of power pump set its Accessories for viceversa up to 20 to 40 kms etc complete. | 4 | Job | 2,925 ₹11,700 | 2,910 ₹11,640 |
Tender Value
₹4.4 L
EMD Value
₹4,430
Closing Date
3 Mar 2026, 3:00 pmClosed
THE COMMISSIONER,TIRUCHENGODE
TIRUCHENGODE MUNICIPALITY
379/2026/E2 Repair and Maintenance works in 100HP Motor Unit B AND Unit C and Replacing spares in 100HP Motot Unit C at Sandaipettai Booster Station in Tiruchengode Municipality.
2026_MAWS_668032_5
303/2026/E2
Open Tender
Civil Works - Water Works
60 days
TIRUCHENGODE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,430
14 Mar 2026
27 Feb 2026
3 Mar 2026
27 Feb 2026
3 Mar 2026
27 Feb 2026
Removing pump From the bed in the booster station conveyed to work shop.
Supply of Bearing NU 316 DE Side labour Charges for old bearing reomove and fixing the new bearing and etc.,
Supply of Bearing 6316 NDE Side labour Charges for old bearing reomove and fixing the new bearing and etc.,
Lathe Work of Motor cover DE and NDE Costing Sleeve turning and Grainding Charge
Lathe Work of Rotor Shaft Welding and grainding charge.
Supply and delivery of Terminal Board
Supply and delivery of Tyer Couppler (Spare 2 nos)
Rotor Balanceing Charges
Re-erecting the motor in the sump, testing and Commissioning.and Spare motor Eeerection.
Conveyance of power pump set its Accessories for viceversa up to 20 to 40 kms etc complete.
Removal of centrifugal pumpset/ jet pumps/ submersible pumpsets and its accessories from borewell/ open well for attending repairs 50% of the rates mentioned under item 17 (a), (b) and (c) may be allowed for the respective Horse power.
Supply and fixing of New Bronze Shaft Sleeve after adjusted the old scrap meterial etc complete.
Supply and fixing of impeller shield ring after adjusted the old scrap meterial etc complete.
Supply and fixing of Rope Gland with stud after adjusted the ols Scrap materials.
Supply and fixing of water Thrower after adjusted the old scrap meterial
Supplay and fixing of SS 304 Shaft key after adjusting old scrap materials etc complete.
Supply and fixing of impiller lock nut after adjusting old scrap materials etc complete.
Supply and delivery of stainless steel 316 Graded (non magnetic) pump shaft with key 1.08m Length and OD 65mm Including turning,threading, key cutting, checking alignment and machining etc. adjusted old scrab
Supply and fixing lock ring coupling pin and copper tube with brass nipple for water colling arrangement after adjusting old scrap
Supplay ,delivery and fixing of pump brarings for DE sideand NDE Side 6309/C3 after adjusting old scrap materials etc complete.
Charges for pr pump DE & NDE side bearing housing sleeve in CI Materials to connect the bearing seating area to rectify the loose condition etc complete.
Charges for fixing pump packing sheet top cover complete new bolt & nut after adjusting old scrap materials/ etc complete.
20 mm dia on Above to 90 mm to 120mm length fully threaded bolts and nuts with 2 Nos.(TWAD SR 25-26 page-35)
3 PLY RI Sheet
Re-erection of centrifugal pumpsets, jet pumpsets and its accessories into the borewell/ openwell after attending the repairs 50% of the rate mentioned under item 17 (a), (b) and (c) may be allowed for respective Horse power.
Conveyance of power pump set its Accessories for viceversa up to 80 kms etc complete.
add GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_802657.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid