| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-Finance AT PURIBINDHA PO BITANA BARIKULA DIST JAJPUR PIN 755014 | JAJAPUR | ODISHA | 755014 | ₹3.8 Cr | L1 | Accepted-Finance Winner through opening of the Financial Bid (Cover-II) |
| 2 | L2₹3.8 Cr+₹22,441.58 (0.06%)Rejected-Finance | ₹3.8 Cr+₹22,441.58 (0.06%) | L2 | Rejected-Finance Loss through opening of the Financial Bid (Cover-II) |
| 3 | Rejected-Technical S O MENEJAR NAYAK BRAHMIN STREET GP PO BISSAMCUTTACK BLOCK PS BISSAMCUTTACK DIST RAYAGADA ODISHA PIN 765019 | RAYAGADA | ODISHA | 765019 | - | - | Rejected-Technical As per DTCN |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per DTCN |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per DTCN |
Tender Value
₹4.5 Cr
EMD Value
₹4.5 L
Closing Date
19 Feb 2026, 5:00 pmClosed
CCE, Eastern (R and B) Circle, Balasore
O/o CCE, Eastern (R and B) Circle, Balasore.
Building Work
2026_EICCL_125598_1
CCEEC-18/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Balasore
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹4.5 L
Yes
3 Aug 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
5 Feb 2026 - 19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL PORTION WORK:- Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 1,200 | Sqm | 8.4 | ₹10,080 |
| 2 | Earth work in excavation of foundation in all kinds of soil within 50m. Initial lead and 1.5m initial lift including rough dressing and levelling the bed including all labour, T&P etc. complete as per the Spection and Direction of the Engineer-in-charge. | 943.29 | Cum | 276.89 | ₹2,61,187.57 |
| 3 | Earth work in excavated earth from work side for filling and carriage of earth by mechanical means with average lead of 5km including loading and unloading at road alignment including dressing and levelling & approved profile complete as per direction of the Engineer-in-charge | 59.7 | Cum | 585.5 | ₹34,954.35 |
| 4 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-In-charge. | 282.99 | Cum | 153.83 | ₹43,532.35 |
| 5 | Supplying, filling in foundation & plinth with sand in layers including watering and ramming with cost conveyance, royalities, taxes of all materials and labour with T&P required for the work etc. complete in all respect as per the direction of the Engineer-in-charge. | 470.3 | Cum | 1,053.6 | ₹4,95,508.08 |
| 6 | Providing & applying Post constrution of Antitermite treatment by drilling 12 mm dia holes at a distance of 30cm@ junction of wall and floor about 300mm apart deep enough to each the soil below and chemical emulsion(PREMISE,IMIDACHLOPRIED 30.5SC OF BAYER MAKE mixed with475 ltr water) pumped these holes to soak the soil @1Ltr solution of each holea as per manufactures specification and the holes should be pluged with filling materials including cost of all materials,labour charges,conveyance and all taxes and hiring charges of machinaries as per direction of Engineer in charges | 723.24 | Sqm | 104.5 | ₹75,578.58 |
| 7 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge. | 144.19 | Cum | 6,759 | ₹9,74,580.21 |
| 8Cement concrete (1:2:4) with 12mm hard granite chips(Crusher broken) black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete as per direction of the Engineer-in-charge. | |||||
| 8.01 | Ground Floor | 7.5 | Cum | 8,315.9 | ₹62,369.25 |
| 8.02 | First Floor | 0.88 | Cum | 8,724.2 | ₹7,677.3 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.24 MB
BOQ_579539.xls
BOQ • 0.53 MB
Dtcn1.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .