Repair and maintenance works to the main radar mast with associated steel structure and other ancillary works of Port Signal Station Building and its painting inside and outside on the eve of forthcoming Port Day Celebration on 24.11.2026
2026_MoS_929071_1
CE/HWDIII/ACCTS-02/26/117
Open Tender
Civil Works
Works
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹500
Yes
As per Tender Document and e-TCN
₹17,291
Yes
6 Oct 2026
6 Oct 2026
14 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Exterior painting two coats to wall surface with acrylic based weather coat paint of approved quality & shade having resistance to Fungus,Fading, including scraping, cleaning, brushing, washing the old paint, as and when required, removing the flakes applying uniformly two coats including cost and supply of all materials, labour, T&P, taxes,transportation, staging, scaffolding, etc. complete but excluding cost of
GST as directed by the Engineer-in-charge. | 930.36 | Each Sqm | 116.39 | ₹1,08,284.6 |
| 2 | Painting two coats using approved quality & shade with use of epoxy paint and primer over iron/structural work including scrapping, cleaning, de-rusting, emery papering the surface before application of primer with supply of all labour, materials, T&P, all taxes, tollage, scaffolding, safety arrangement for workmen, Port entry fee, Excluding cost of GST, etc. complete as directed by Engineer-in-charge. | 187.06 | Each Sqm | 305.52 | ₹57,150.57 |
| 3 | Providing fitting and fixing the fabricted MS structures after cutting, bending, making holes, jointing ,welding as per requirement and Hoisting fabricated structurals, placing in position as per the drawings or as directed with supply of labour and material,machinery, cost of fuel, electrode, gas, consumables hire and running charges of all kind of equipments etc all complete as per direction of Engineer-in-charge. (Excl. GST) | 23.01 | Qntl. | 10,285.73 | ₹2,36,674.65 |
| 4 | Rubbing old marble chips or marble tile flooring and dados skirting including wax polishing to give granolithic finish with supply of all labour, materials, T&P, taxes, etc. complete as directed by Engineer in charge (Excl. GST) | 45.5 | Each Sqm | 73.17 | ₹3,329.24 |
| 5Supplying of following items including cost and supply of all material, T&P, all taxes, transportation to work site etc. all complete excluding cost of GST & as per direction of Engineer-in-charge. | |||||
| 5.01 | Zinc alloy (white powder coated) casement handle for uPVC window/door | 25 | Each | 130 | ₹3,250 |
| 5.02 | Zinc alloy (white powder coated) touch lock withhook for uPVC window/door | 25 | Each | 114 | ₹2,850 |
| 6 | Filling the gap between frame & adjacent RCC/Brick work by providing weather silicon sealant by gun of approved quality including supply of all material, labour ,T&P, port entry fees, safety arrangement, taxes etc all complete but excluding GST as directed by EIC. | 144 | Rm | 52.04 | ₹7,493.76 |
| 7 | Providing and fitting fixing double scaffolding system(cup lock type)on the exterior side,up to seven stor height made with 40mm dia tube 1.5mcenter to center,horizontal & vertical tubes joining with cup & lock system with M.S tubes,M.S tube challies,M.S clamps & M.S staircase system in the scaffolding for working platformetc.and maintaining it in a serviceable condition for the required duration as approved and removing it there after.The scaffolding system shallbe stiffened with bracings,runners,connection with building etc where ever required for inspection of work at required locations with essential safety features for the work men, excluding GST etc.complete as per directions and approval of engineer incharge.The elevational area of the scaffolding shall be measured for payment purpose.The payment will be made once irrespective of duration of scaffolding. | 600 | Sqm | 228.98 | ₹1,37,388 |
| 8 | Supply of all labour & materials for repairing of the concrete surface at different locations, barricading the affecting area using big concrete blocks, cleaning, drying, chipping the edges and sides to required depth, providing cement based flowable, two stage exapanding grout of sika, fosrock or equivalent make with selected aggregate, providing resinous adhesive of approved brand suitable for bonding between old concrete surface and new cementious grouting material, providing high quality & high strength cementious grout in 2:1 prportion (2-grout powder of approved brand : 1-10mm down chips) over the prepared surface, vibrating, levelling, with existing road surface proper protection of newly prepared surface with curing, disposing the debrises at suitable place, providing all T&P and machineries required for work with all taxes, tollage, port entrry fees, hire & running charges of machineries, all trasportation, providing watchman round the clock, executing the work to the satishfaction of the department etc. all complete excluding GST and as directed by Engineer in-Charge. | 2.3 | Cum | 80,992.8 | ₹1,86,283.44 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_976332.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .