Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | -48.60% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 L+₹5,152.86 (2.92%)Admitted-Finance | -47.10% | ₹1.8 L+₹5,152.86 (2.92%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 L+₹29,577.42 (16.8%)Admitted-Finance | -39.99% | ₹2.1 L+₹29,577.42 (16.8%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 L+₹40,467.13 (22.9%)Admitted-Finance | -36.82% | ₹2.2 L+₹40,467.13 (22.9%) | L4 | Admitted-Finance |
| 5 | L5₹2.2 L+₹43,284.03 (24.5%)Admitted-Finance | -36.00% | ₹2.2 L+₹43,284.03 (24.5%) | L5 | Admitted-Finance |
Tender Value
₹3.4 L
EMD Value
₹6,860
Closing Date
30 Jul 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Lane/drain from H/o Bodh Raj to H/o Kartar Chand at Vill. Gurah Mehtian andConstruction of Lane from H/o Jagdish Singh to H/o Sanjay Singh at Vill. Satura Pyt Satura Block Hiranagar
2026_RDPR_316708_14
e-NIT No.125/REW/K of 2026-27 Dated 18/07/2026
Open Tender
Civil Works
Percentage
90 days
HIRANAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹6,860
12 Aug 2026
18 Jul 2026
31 Jul 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil | 21.24 | Cum | 479.3 | ₹10,180.33 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 19.12 | cum | 218.4 | ₹4,175.81 |
| 3 | Surface dressing of the ground including removing vegetation and in-equalities
not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 187.36 | sqm | 24.12 | ₹4,519.12 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 15.34 | cum | 4,826.5 | ₹74,038.51 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% Boulders | 9.9 | Cum | 5,733.6 | ₹56,762.64 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 60.78 | Sqm | 286.35 | ₹17,404.35 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.34 | cum | 7,788.4 | ₹2,648.06 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level:Thermo-Mechanically Treated bars of grade Fe-500D or more. | 25.49 | Kg | 123.2 | ₹3,140.37 |
| 9 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 15.2 | Sqm | 510.25 | ₹7,755.8 |
| 10 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 187.36 | SQM | 816.15 | ₹1,52,913.86 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_1034779.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .