Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 L+₹398 (0.10%)Rejected-AOC | ₹4.2 L+₹398 (0.10%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SRI MARUTHAMALAYAAN ENGINEERS L1 | PS ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain etc complete as per direction of departmental officers. | 6 | M3 | 128 ₹768 Lowest | 130 ₹780 |
| 2.00 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 5 | M3 | 5,071 ₹25,355 Lowest | 5,080 ₹25,400 |
| 3.00 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 12 | M3 | 572 ₹6,864 Lowest | 575 ₹6,900 |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 42 | M3 | 128 ₹5,376 Lowest | 130 ₹5,460 |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 10 | M3 | 5,962 ₹59,620 Lowest | 5,965 ₹59,650 |
| 6.00Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | |||||
| 6.01 | i. Drain | 187 | M2 | 534 ₹99,858 Lowest | 534 ₹99,858 Lowest |
| 6.02 | ii.Slab bottom | 6 | M2 | 1,181 ₹7,086 Lowest | 1,185 ₹7,110 |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm gauge hard broken granite stone jelly for All CC items of work xcluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 24 | M3 | 6,721 ₹1,61,304 Lowest | 6,722 ₹1,61,328 |
| 8.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 41 | M2 | 309 ₹12,669 Lowest | 310 ₹12,710 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
20 Jan 2026, 3:00 pmClosed
Assisstant Commissioner-West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain at Sundapalayam Kilaku Radha Street in ward no 39 of West Zone
2026_MAWS_642372_9
E8/WESTZONE/2025-26
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹5,000
30 Apr 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
Desilting the existing drain etc complete as per direction of departmental officers.
Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers.
Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers.
Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge.
Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification.
Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete
i. Drain
ii.Slab bottom
Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm gauge hard broken granite stone jelly for All CC items of work xcluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc.
Supply and fixing of 600mm RCC manhole cover with frame SFRC pipe IS 12592
Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete.
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
SWD.pdf
Tender Documents • 0.67 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_769731.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .