| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹93.5 LAccepted-AOC NO 430B ARAKKONAM TIRUTHANI ROAD ARAKKONAM RANIPET DISTRICT | ARAKKONAM | RANIPET | TAMIL NADU | ₹93.5 L | L-1 | Accepted-AOC L-1 Mp and Co
Lowest Rate |
| 2 | L2₹99.8 LRejected-AOC NO 32 BAJANAI KOIL STREET PUDUPADI POST KILAMBADI VILLAGE ARCOT | ARCOT | RANIPET | TAMIL NADU | ₹99.8 L | L2 | Rejected-AOC L-2 RK CONSTRUCTIONS
Highest Rate |
| Sl No | Description | Qty | Unit | MPANDCO L1 | M/S RK CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Walajah Block | |||||
| 2.00Strengthning of the road form Anandalai Musuri Road Km 0/0 -1/600 (R 6) in Walajah Union Ranipet District. | |||||
| 3.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 2,295.65 | Sq.m | 6 ₹13,773.90 | 6.5 ₹14,921.73 |
| 4.00 | Picking 5 Cm to 10 mm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete | 2,013.75 | Sq.m | 23 ₹46,316.25 | 25 ₹50,343.75 |
| 5.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 286.96 | cu.m | 140 ₹40,174.40 | 145 ₹41,609.20 |
| 6.00 | Collection of Carted earth for Basecourse And side berms and labour charges for filling etc complete | 286.96 | cu.m | 145 ₹41,609.20 | 145 ₹41,609.20 |
| 7.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5. | 906.19 | cu.m | 2,450 ₹22.2 L | 3,000 ₹27.2 L |
| 8.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 6,041.25 | Sq.m | 86 ₹5.2 L | 90 ₹5.4 L |
| 9.00 | Applying Tack coat over WMM surface using 2.50 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 6,041.25 | Sq.m | 20.21 ₹1.2 L | 21 ₹1.3 L |
| 10.00 | BM (Grade-II) 50mm Thick Using VG30
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 302.07 | cu.m | 8,782.18 ₹26.5 L | 8,782.18 ₹26.5 L |
Tender Value
₹93.5 L
EMD Value
₹1 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Project Director
Project Director DRDA-Ranipet
Strengthening the road from Anandalai Musuri Road Km 0/0 1/600 (R-6) Walajah Block, Ranipet District in NABARD RIDF 2026-27
2026_RDTN_656350_1
A3/258/2026
Open Tender
Civil Works
180 days
DRDA-Ranipet
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1 L
14 May 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Walajah Block
Strengthning of the road form Anandalai Musuri Road Km 0/0 -1/600 (R 6) in Walajah Union Ranipet District.
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 mm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection of Carted earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying Tack coat over WMM surface using 2.50 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Retro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2. 10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in Charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 2012. The retro - reflective sheeting shall be covered under 7 3 ear warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 . ( as per MORT&H Specification No.801) equilateral triangular sign board
Provision for Hectometer stone
Providing KM Stone
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
1st Year
2nd Year
3rd Year
4th Year
5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.41 MB
1Technicalbid.pdf
Tender Documents • 1.23 MB
1Pricebid.pdf
Additional Documents • 0.81 MB
BOQ_787061.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid