Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Finance VPO MAJOD TEHSIL HANSI DISTRICT HISAR 125049 HARYANA | HISAR | HISAR | HARYANA | 125049 | ₹18.2 L | L1 | Admitted-Finance |
| 2 | L2₹20.0 L+₹1.7 L (9.41%)Admitted-Finance A 91 DEFENCE COLONY AGRA CANTT AGRA UP PIN 282001 | AGRA | UTTAR PRADESH | 282001 | ₹20.0 L+₹1.7 L (9.41%) | L2 | Admitted-Finance |
| 3 | L3₹21.8 L+₹3.5 L (19.4%)Admitted-Finance | ₹21.8 L+₹3.5 L (19.4%) | L3 | Admitted-Finance |
| 4 | L4₹22.2 L+₹4.0 L (21.8%)Admitted-Finance | ₹22.2 L+₹4.0 L (21.8%) | L4 | Admitted-Finance |
| 5 | L5₹24.3 L+₹6.1 L (33.2%)Admitted-Finance | ₹24.3 L+₹6.1 L (33.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S KAVITA CONSTRUCTION L4 | Shiva Constructin Co. L5 | VIKAS INFRASTRUCTURE L1 | S R BUILDERS L2 | PRINCE CONSTRUCTION L3 | K P BUILDERS L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of brick tiles or terracing tiles, single layer on roof and removing, complete all as specified and directed. | 1,695 | Sqm | 20 ₹33,900 | 25 ₹42,375 | 20 ₹33,900 | 42 ₹71,190 | 10 ₹16,950 Lowest | 70 ₹1,18,650 |
| 2.00 | Demolition Mud in roofs, any thickness,including plastering and leeping (whether full thickness removed or only a part thereof)and removing debries out of MD land complete all as specified and directed. | 149.16 | Cum | 80 ₹11,932.8 Lowest | 500 ₹74,580 | 85 ₹12,678.6 | 250 ₹37,290 | 100 ₹14,916 | 300 ₹44,748 |
| 3.00 | M&L for cutting out cracks to V-section in existing roofs or terracing, cleaning out, wetting, grouting with cement and sand slurry 1:3 complete all as specified and directed. | 280 | Rm | 20 ₹5,600 | 20 ₹5,600 | 15 ₹4,200 Lowest | 110 ₹30,800 | 20 ₹5,600 | 100 ₹28,000 |
| 4.00 | M&L cement concrete 1:2:4 mix type B-1 (20 mm graded stone aggregate) in padding all as specified of average thickness 60 mm in slope over roof complete all as specified and directed. | 1,695 | Sqm | 250 ₹4,23,750 | 250 ₹4,23,750 | 150 ₹2,54,250 Lowest | 160 ₹2,71,200 | 280 ₹4,74,600 | 350 ₹5,93,250 |
| 5.00 | M&L rendering 10 mm thick in cement mortar 1:3 and finishing even and smooth with mixing of liquid WPC on roof surfaces complete all as specified and directed.
Note : WPC shall be measured and paid seperately. | 1,695 | Sqm | 100 ₹1,69,500 | 150 ₹2,54,250 | 120 ₹2,03,400 | 92 ₹1,55,940 Lowest | 100 ₹1,69,500 | 180 ₹3,05,100 |
| 6.00 | Supply only liquid water proofing compound complete all as specified and directed. | 57.02 | Litre | 50 ₹2,851 | 70 ₹3,991.4 | 45 ₹2,565.9 | 250 ₹14,255 | 30 ₹1,710.6 Lowest | 70 ₹3,991.4 |
| 7.00 | Supplying & Laying of five layered 3mm thick APP (Atactic Polypropylene) modified prefabricated bituminous waterproofing Memberane , reinforced with glass fibre matt treatment and upperside of memberane thermally insulated with white mineral gravel finish, uniformly embedded during manufacturing process shall be laid dry torch application, side coverlaps shall be 75 mm and end slab shall be 100 mm and all over laps and joints shall also be sealed by torch application, over a coat of hot bitumen primer, complete all as specified and directed. | 1,695 | Sqm | 560 ₹9,49,200 | 555 ₹9,40,725 | 425 ₹7,20,375 | 422 ₹7,15,290 Lowest | 450 ₹7,62,750 | 520 ₹8,81,400 |
| 8.00 | Fixing only loosened or removed 40mm thick brick tiles at roof bedded with 15mm thick cement plaster in cement mortar (1:6) and joints grouted & pointed flush in cement mortar 1:3 complete all as specified and directed. | 50 | Sqm | 200 ₹10,000 Lowest | 200 ₹10,000 Lowest | 200 ₹10,000 Lowest | 250 ₹12,500 | 250 ₹12,500 | 350 ₹17,500 |
| 9.00 | M&L flush pointing in cement mortar 1:3 to brick tiles laid in roof after raking out joints/ pointing in brick tiles, laid flat in roofs, etc. complete all as specified and directed. | 265 | X Sqm | 200 ₹53,000 | 500 ₹1,32,500 | 200 ₹53,000 | 322 ₹85,330 | 390 ₹1,03,350 | 9 ₹2,385 Lowest |
| 10.00 | Raking out joints/ pointing to brick work in walls or to bricks on edge in floors, surface channels, roofs, etc complete all as specified and directed. | 260 | X Sqm | 30 ₹7,800 Lowest | 50 ₹13,000 | 250 ₹65,000 | 110 ₹28,600 | 390 ₹1,01,400 | 150 ₹39,000 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
21 Aug 2026, 6:00 pmClosed
GE (W)
GE (W) HISAR AT HISAR MIL STN
CA NO GE (W)/HSR-27/2026-27 REPAIR TO ROOF LEAKAGE SEEPAGES TO CERTAIN OTM ACCN OF ZONE B UNDER GE WEST HISAR AT HISAR MIL STN
2026_MES_780603_1
CA NO GE (W)/HSR-27/2026-27
Open Tender
Civil Works
Item Rate
270 days
HISAR
Please refer tender documents.
8 documents required · 8 mandatory
₹500
GE (W) HISAR
₹50,000
GE (W) HISAR
25 Aug 2026
24 Jul 2026
24 Aug 2026
24 Jul 2026
21 Aug 2026
7 Aug 2026
25 Jul 2026 - 1 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of brick tiles or terracing tiles, single layer on roof and removing, complete all as specified and directed. | 1,695 | Sqm | - | - |
| 2 | Demolition Mud in roofs, any thickness,including plastering and leeping (whether full thickness removed or only a part thereof)and removing debries out of MD land complete all as specified and directed. | 149.16 | Cum | - | - |
| 3 | M&L for cutting out cracks to V-section in existing roofs or terracing, cleaning out, wetting, grouting with cement and sand slurry 1:3 complete all as specified and directed. | 280 | Rm | - | - |
| 4 | M&L cement concrete 1:2:4 mix type B-1 (20 mm graded stone aggregate) in padding all as specified of average thickness 60 mm in slope over roof complete all as specified and directed. | 1,695 | Sqm | - | - |
| 5 | M&L rendering 10 mm thick in cement mortar 1:3 and finishing even and smooth with mixing of liquid WPC on roof surfaces complete all as specified and directed.
Note : WPC shall be measured and paid seperately. | 1,695 | Sqm | - | - |
| 6 | Supply only liquid water proofing compound complete all as specified and directed. | 57.02 | Litre | - | - |
| 7 | Supplying & Laying of five layered 3mm thick APP (Atactic Polypropylene) modified prefabricated bituminous waterproofing Memberane , reinforced with glass fibre matt treatment and upperside of memberane thermally insulated with white mineral gravel finish, uniformly embedded during manufacturing process shall be laid dry torch application, side coverlaps shall be 75 mm and end slab shall be 100 mm and all over laps and joints shall also be sealed by torch application, over a coat of hot bitumen primer, complete all as specified and directed. | 1,695 | Sqm | - | - |
| 8 | Fixing only loosened or removed 40mm thick brick tiles at roof bedded with 15mm thick cement plaster in cement mortar (1:6) and joints grouted & pointed flush in cement mortar 1:3 complete all as specified and directed. | 50 | Sqm | - | - |
| 9 | M&L flush pointing in cement mortar 1:3 to brick tiles laid in roof after raking out joints/ pointing in brick tiles, laid flat in roofs, etc. complete all as specified and directed. | 265 | X Sqm | - | - |
| 10 | Raking out joints/ pointing to brick work in walls or to bricks on edge in floors, surface channels, roofs, etc complete all as specified and directed. | 260 | X Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_874412.xls
BOQ • 6.72 MB
TenderDocuments27.pdf
Tender Documents • 10.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .