ACE CDC TANGEDCO
A10 Thiru .vi.ka Industrial Estate Guindy Chennai
Laying of 33 KV 1x630 sq mm XLPE UG cable from Mangadu 110 KV SS to Kundrathur Amarprakash 33 KV SS Single Circuit from Kundrathur Naal Road junction Reach-I Ch 4455m to Ch 7000m
2020_EB_161458_1
OTNO57/2019-20
Open Tender
Civil Works
Item Rate
50 days
ACE CDC TANGEDCO, Guindy
As per BQR specification
3 documents required · 3 mandatory
₹0
₹17,690
Yes
27 Jul 2020
19 Mar 2020
12 Jun 2020
19 Mar 2020
11 Jun 2020
19 Mar 2020
Amount
Removing the blacktopping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (Clear) including cost of using machinery providing danger lights, indication arrangements wherever necessary, leads, lifts, labour, tools and plants etc., complete.
Earth work excavation in all soils including slush and slit under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing 60 cm wide and 105 cm deep (clear) including cost of signal boards, danger light, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, leads, lifts, tools and plants etc., complete. The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic.
Using Machine for a width of 60cm to a depth of 40 cm
Using Labour to a breadth of 60cm and a depth of 65cm
Using Labour to a breadth of 60cm and a depth of 135cm
Dismantling the brickwork,PCC,RCC inside the cable trench and cable duct wherever occur of any thickness and clearing trench/duct free from debris and without hindrance to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer- in -charge
Dismantling the brickwork
Dismantling PCC
Dismantling RCC
Providing M.S.barricading 1.5m height using M.S. sheet 4mm thick MS angle 50x50x8 mm base channel 100x50 of all materials,leads,lifts,labour ,welding and erection ,transporting at site placing in position,shifting to new location after completing works,tools & plants etc.,complete.
Laying of 140 mm dia PVC pipes, cutting and jointing the pipe, tying with 7/20 SWG G.I wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour, lead, lift, T&P, etc., complete excluding cost of PVC pipes to be supplied by TANGEDCO
Laying plain cement concrete 1:3:6 using 20mm HBG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper slignment and level as per standard specification including cost of all materials, labour, lead, lift etc., complete.
Transporting of 33 KV cable drums including cost of loading at stores, unloading of 33 KV cable drums each weighing approximately 7T in lorries using truck mounted crane for both loading and unloading including cost of labour required, etc., (3 drums at a time)
Laying of 1x630 sq.mm 33KV XLPE UG cable by means of winch over rollers provided by contractor. The rate includes the cost of pulling the steel wire rope from winch side to drum side providing labour as required at site for tying the cable in trefoil formation with nylon rope/PVC pipe etc., complete
Refilling with filling sand in layers well consolidated as per standard specification including cost of all materials, labour, lead, lift etc., complete
Laying of 33KV RCC cover slab including transportation from TNEB stores, loading, unloading and laying carefully at site as directed by Engineer-in-charge
Refilling with excavated earth in layers and well consolidated as per standard specification including cost of all materials, labour,lead, lift etc., complete
Transporting and clearing the excess excavated earth and debris then and there immediately to avoid any hindrance to normal flow of traffic and public beyond a distance of 5km from work spot as per direction of Engineer -in -charge including loading and unloading charges etc., complete
Transporting of 33 KV empty drums loading at site, and devolution of empty 33 KV steel cable drum each weighing 1 to 1.5 T from various work site (3 drums at a time) and balance cables if any to departmental stores
Providing watch and ward (Unskilled) at site as instructed by the site-in-charge
Bailing out of water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel,opeartor etc.,complete.
Providing 18 gauge aluminium strip with Nylon tie at 10m intervals for engraving voltage level,size of the cable,name of the feeder including cost of all materials,labour charges,transportation charges etc complete.
Casting and placing of RCC offset slab(cable route indicationn slab )of size 750x750x60mm casting in RCC 1:2:4 using 12 to 20mm HBG metal with necssary reinforcement,piling shutting,curing,transport from casting yard to various locations and fixing the slab along 33KV cable route as directed by site engineer with PCC 1:3:6 including cost of all materials,labour,lead ,lift etc., including 2 coats of flourescent painting.
GST for bidders within TamilNadu
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .