Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Qualified | Qualified |
| 2 | Qualified | Qualified |
| 3 | Qualified | Qualified |
| 4 | Qualified | Qualified |
| 5 | Qualified | Qualified |
Tender Value
Refer Docs
Closing Date
19 Mar 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Pallavi Mishra
Power Grid Corporation of India Limited Northern Region-III, Regional Head Quarter 12, Rana Pratap Marg Lucknow (UP) - 226001.
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1
Open
Electrical Works
Works
Fatehpur
₹25,000
22 Mar 2021
16 Feb 2021
22 Mar 2021
16 Feb 2021
18 Mar 2021
16 Feb 2021
Name of Package : Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
Specification No. : 5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1
Completion Period 12 Months
: Attachments : General guidelines for filling up the Attachments : TW01 :
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
Specification No.: 5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 3(QR), Attach QR, 4, 4(A), 4(B), 5, 6, 7, 9, 10, 11, 12, 13, 15, 16, 17 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as perproforma provided in the bidding document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 14 Integrity Pact : To be submitted as per ITB Clause No. 9.3(n) and as per remarks in the Attach 14-IP.
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Sole Bidder 1
JV (Joint Venture) 2 or More
Whether Bidder is MSE [Select from drop down menu] No 0
Specify type of Bidder [Select from drop down menu] 1
Name of Lead Partner
Address of Lead Partner
Other Partner …… ……. …….. …… ……. ……..
Address of other Partner …… ……. …….. …… ……. ……..
Name of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Address of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No] No
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consdier its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-3(JV) 0 0
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services & …… ……. …….. …… ……. ……..
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 12
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-3(QR)
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Qualifying Requirement Data)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
For our Qualifying Requirements Data, please refer Schedule-QR of this volume.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-4
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-4(A)
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-4(B)
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-5
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1.We hereby furnish the details of the items/ sub-assemblies (supply items), we propose to buy for the purpose of furnishing and installation of the subject Package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
2. We hereby delare that we would not subcontract the erection portion of the contract without prior approval of the Employer.
Date : Printed Name :
Place : Designation :
5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 ATTACHMENT-5A
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name & Address Category (Micro or Small)
2. 2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-6
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-7
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Details of Alternative Bid)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
No Alternative Bid
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-9
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Work Completion Schedule)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of contract
1 SITE MOBLIZATION
2 S0URCE APPROVAL, STORE CONSTRUCTION, STATUTARY COMPLIANCE SUCH AS LABOUR LICENCE , WCP, CAR POLICY ETC , LAYOUT MARKING, APPROVAL OF VENDOR
3 SITE LEVELLING
5 Submission of Drawings and documents
b OGA and Electrical Plan and Section Layouts
c Foundation and cable trench layout
d EKD, clearance and Earth Mat layout
f Control and Protection system drawings
g Power and control cable schedules
h Equipment drawings
6 Supply of Items at site (Including vendor finalization, Inspection, testing, delivery at site)
a. Circuit Breaker, CT, CVT, Isolator, Wave trap, Surge arresstor
b Control and Protection Panels
c Telecom Equipments
d Erection Hardware Items
f Power and control cables
g Towers and structures
8 COMPLETION OF EQUIPMENT FOUNDATION
9 COMPLETION OF SPR CIVIL WORK
a. Circuit Breaker, CT, CVT, Isolator, Wave trap, Surge arresstor
b Control and Protection Panels
c Telecom Equipments
d Erection Hardware Items
f Power and control cables
11 Commissioning
12 COMPLETION OF ROAD AND DRAIN
13 COMPLETION OF SECURITY GATE AND BOUNDARY WALL WORK and all associated work.
14 FINAL CLEANING AND HANDING OVER
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-10
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Guarantee Declaration)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that the equipments offered shall have minimum (or a muximum, as the case may be) performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-11
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly,We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-11
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Other Partner Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-11
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-12
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Price Adjustment Data)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-13
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Declaration regarding Social Accountability)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-14
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Integrity Pact is annexed herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-15
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Initial Advance
Supply Portion:
Services Portion:
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3.(a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3.(b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) No 0
3.(c) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3.(d) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No) No
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-16
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Additional Information)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of Bidder (Lead Partner)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 q, Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 OTHER INFORMATION
3.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
3.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-17
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-17
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-17
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-18
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Safety Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-18
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : Printed Name :
Place : Designation :
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Attachment-19
Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways
(Declaration of Key Managerial Person and Power of Attorney holder)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1. We confirm that the declarations made in our bid, particularly Attachment-3 (QR) regarding eligibility/qualification data and documents submitted in our bid in support of the declarations, are true and correct to the best of our knowledge. 2. We further confirm that we have filled up Attachment-3(QR). We also confirm that in support of meeting the Technical experience requirement as per Annexure-A (BDS), we have enclosed self-certified copy of Contract/ Award Letter and certificate from the utility for which the contract has been executed. 3. We shall furnish clarification to bid, if any sought by Employer pursuant to ITB clause 21.1. We understand that if we fail to rectify/furnish the requested documents if any, within 7 working days’ notice, our bid is liable to be rejected. 4. We understand that any false declaration and/or misrepresentation of facts and/or furnishing of false/forged documents /information may lead to our debarment from participation in Employer tenders and that our Bid Security/ Contract Performance Guarantee may be forfeited besides other actions as deemed to be appropriate as per the provisions of the Bidding Document/Integrity Pact/Employer’s policy.
5*. Our Balance Bid Capacity net of works under execution, calculated as per Clause ITB 23.2.1 (i.e. 3T-B), as on 1st date** of the Quarter in which First Envelope Bids are to be opened i.e. 01st
(MM/YYYY) in equivalent Indian Rupees is
Crore. The details of value used for working out the Balance Bid Capacity as above, are as follows:
A. Maximum value of Transmission & Distribution (T&D) works (including substation, transmission lines, distribution for all verticals), executed in any one financial year during the last 5 financial years taking into account the completed as well as the works in progress
S N FY Value of Total Sales (including Taxes and Duties)(T)
B. Value of existing commitments and ongoing similar works yet to be completed as on the 1st date of quarter of the financial year in which the bids are opened(B) as on 1st date of the Quarter in which First Envelope Bids are to be opened
S N Value of Balance Works (B1) against the Contracts awarded by Employer Value of Balance Works (B2) against the Contracts awarded by Utilities other than Employer Total value of Balance Works (B){B=B1+B2}
[**1st day of the quarter in which the first envelope bids are opened for e.g. If the actual date of opening of first envelope bids is 15th June 2016, the Balance bid capacity as on 01st April 2016 is to be declared)] *(Applicable only in case of package for which the stipulated Qualification Requirements in respect of Technical experience pertains primarily to erection, testing and commissioning/civil works viz. transmission Line tower packages/Substation package/civil works package etc.)
6***. Our/Our proposed manufacturer’s annual manufacturing capacity as certified by a Chartered Engineer or similar Professional/ Professional body/Govt Agencies is:
MT/annum (for tower/tower parts)
[Certificate from Chartered Engineer or similar Professional/ Professional body/Govt Agencies in the country of the bidder/proposed manufacturer is to be enclosed along with this Attachment. Annual manufacturing capacity of all the manufacturers to be furnished separately] ***(Applicable only in case of Tower packages with scope for tower supply)
7. Notwithstanding above, we also understand that the Bid Capacity/Manufacturing Capacity as declared hereinabove, shall be subject to assessment, if any, by the Employer, which shall be final and binding. We also confirm that the Employer may verify the supporting documents/ details in connection with above declarations. We further understand that in case of any unethical practices inter-alia including any misrepresentation of facts, submission of false and/or forged details/ documents/ declaration by us, we may be debarred from the participation in Employer’s tenders in future as considered appropriate by Employer and our Bid Security/ Contract Performance Guarantee shall be forfeited besides taking other actions as deemed appropriate.
Date : Printed Name :
Place : Designation :
Note: Key Managerial Personnel (KMP) of the company shall include CEO/Managing Director/ Company Secretary/ Director/ CFO/any of the partner in case of partnership firm/any other officer entrusted with substantial powers of the management of the affairs of the company/firm.
Bidders are advised to print this declaration on the Company Letter Head and upload the duly signed and scanned copy along with the First Envelope Bid.
Before filling up the Bid Form, the Bidder is required to fill up the details as under :
1 Tick whichever is applicable:
Indicate the name of Associate here, if applicable. 1 USD
1 Enter Details of Amendments: INR
Amendments to Bidding Documents issued:
2 Bid Security Bank Guarantee
3 Currency INR Amount
4 Validity in months
5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Bid Form 1 st 1 January 1 one
2 nd 2 February 2 two
BID FORM 3 rd 3 March 3 three
4 th 4 April 4 four
Bid Proposal Ref. No. 5 th 5 May 5 five
Date : 0-Jan-00 7 th 0 6 June 7 seven
8 th 1 7 July 8 eight
To: 9 th January 8 August 9 nine
Contracts & Materials Deptt 10 th 1900 9 September 10 ten
Power Grid Corporation of India Ltd., 11 th 10 October 11 eleven
3rd Floor 12 th 11 November 12 twelve
12 Rana Pratap Marg 13 th 12 December 13 thirteen
Lucknow-226001 (UP) 14 th Zero 14 fourteen
15 th () 15 fifteen
Name of Contract : Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently).0 16 th 16 sixteen
Dear Ladies and/or Gentlemen, 17 th 17 seventeen
Having examined the Bidding Documents, including Amendment Nos. dated 00/01/1900, the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 0 18 th 18 eighteen
We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2.
Our Bid, as said above have been submitted as per the followings: 19 th 19 nineteen
A Attachments to the Bid Form (First Envelope) 20 th 20 twenty
1.1 In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments to the Bid Form : 21 st
(a) Attachment 1: Not Applicable (Please note all bidders shall submit Attachment-25: Bid Securing declaration and the MSE bidders shall also submit MSE registration certificate) Bank Draft 22 th
(b) Attachment 2: A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Pay Order 23 th
(c) Attachment 3: The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3(c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents [Attachment – 3(QR)]. Banks certified Cheque 24 th
(d) Attachment 4: The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facility offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4 . Moreover, a list of Special Tools & Tackles to be furnished by us, the cost of which is included in our Bid Price, is also enclosed as per your format as Attachment- 4A. 25 th
(e) Attachment 5: The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 6: The variation and deviations from the requirements of the Conditions of Contract, Bid Data Sheet and other commercial conditions, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter-alia, the cost of withdrawal of the variations and deviations indicated therein. 27 th
(g) Attachment 7: The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. [NOT APPLICABLE] 28 th
(h) Attachment 8: Manufacturer’s Authorisation Forms 29 th
(i) Attachment 9: Work Completion Schedule
(j) Attachment 11: Information regarding ex-employees of Employer in our firm
(k) Attachment 12: Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents
(l) Attachment 13: Declaration regarding Social Accountability
(m) Attachment 14: Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(n) Attachment 15: Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises.
(o) Attachment 16: Additional information
(p) Attachment 17: Declaration for tax exemptions, reductions, allowances or benefits
(q) Attachment 18: Declaration regarding Price bid.
(r) Attachment 19: Declaration of Key Managerial Person and Power of Attorney holder
(s) Attachment 20: Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order, if applicable
(t) Attachment 21: Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order [NOT APPLICABLE]
(u) Attachment 22: Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
(v) Attachment 23: Declaration by the bidder regarding events encountered pursuant to ITB Clause 2.1 (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture)
(vi) Attachment 24: Certification by the Bidder per DoE Order in line with ITB Clause 2.1
(vii) Attachment 25: Bid Securing Declaration
1.2 [*Applicable only in case of MSE bidders].We are a Micro and Small Enterprise (MSE) registered with , a Designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01.06.2020 read in conjunction with related notification issued from time to time for such enterprises
1.3 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
B. Second Envelope
1.1 In continuation of First Envelope of our Bid, we have submited the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents for the sum specified in our Second Envelope Bid, in accordance with the terms & conditions of the Bidding Documents. We hereby confirm that the total amout of our bid is in accordance with the prices quoted by us under different Heads, as detailed below:
i. Ex-works Price of Plant and Equipment (including mandatory Spares) to be supplied;
ii. Local Transportation, In-transit Insurance and Loading & Unloading for supply of Plant & Equipment;
iii. Installation Charges (including civil works);
iv. Taxes and Duties amount
1.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
3.2 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
D. Construction of the Contract
5.1* We declare that we have studied GCC Sub-Clause 2.1 relating to mode of contracting for Foreign Bidders and we are making this proposal with a stipulation that you shall award us three separate Contracts viz ‘First Contract’ for all works to be performed in countries outside India covering, inter-alia, the Off-Shore Supply of equipment & materials including mandatory spares (CIF Supply), testing to be conducted aborad and training to be imparted abroad; ‘Second Contract’ for Supply of equipment & materials including mandatory spares (Ex-works Supply) and testing to be conducted within India; and ‘Third Contract’ for providing all services i.e. port handling and custom clearance of the imported goods; further loading and inland transportation for delivery at site, unloading, storage, handling at site, installation, testing and commissioning including Trial Operation in respect of all equipment & materials supplied under both ‘First Contract’ and ‘Second Contract’ and any other services specified in the Bidding Documents.
We declare that the award of three contracts, will not, in any way, dilute our responsibility for successful operation of Plant/Equipment and fulfillment of all obligations as per Bidding Documents and that all the three Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the remaining contracts which will confer on you the right to terminate the other contracts at our risk and cost and/or recover damages under any or all the Contracts.
# Further, M/s. Indicate the name of Associate here, if applicable., whose capacity, capability and experience are enclosed with our Bid as our Associate(s) for the purpose of executing the ‘Second Contract’ and / or the ‘Third Contract’ and written unequivocal consent of the above mentioned proposed Associate(s) to work as your independent Contractor, on the same terms and conditions as offered by us to you in this bid, is also enclosed with the Bid Form. We shall, however, be overall responsible for the execution of all the three Contracts. , whose capacity, capability and experience are enclosed with our Bid as our Associate(s) for the purpose of executing the ‘Second Contract’ and / or the ‘Third Contract’ and written unequivocal consent of the above mentioned proposed Associate(s) to work as your independent Contractor, on the same terms and conditions as offered by us to you in this bid, is also enclosed with the Bid Form. We shall, however, be overall responsible for the execution of all the three Contracts.
The above-mentioned proposed Associate(s) shall directly enter into the ‘Second Contract’ and/ or ‘Third Contract’ with you and all the three contracts shall contain the aforesaid cross-fall breach clause. It is expressly understood that in case of breach of the Second and/or Third Contract by the Associate(s), we shall be liable for all the consequences of breach thereof notwithstanding that the Contract is awarded to the Associate(s). In case the Associate(s), despite his written consent fails to enter into the ‘Second Contract’ and/or ‘Third Contract’ with you, or if the Employer in his judgment does not find acceptance of the proposed Associate(s) as its Contractor, then we undertake to enter into and execute all the Contracts, inter alia, containing the aforesaid cross-fall breach clause. In such an event, the over-all financial liability of the Employer, under the Contract shall, however, not exceed that envisaged in our this bid. (# Applicable only in case assignment is permitted by the Employer.)
1.0 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, In-transit insurance, unloading, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents.
We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
2.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c ) GCC 8 Terms of Payment
(d) GCC 9.3 Performance Security
(e ) GCC 10 Taxes and Duties
(f) GCC 21.2 Completion Time Guarantee
(g) GCC 22 Defect Liability
(h) GCC 23 Functional Guarantee
(i) GCC 25 Patent Indemnity
(j) GCC 26 Limitation of Liability
(k) GCC 38 Settlement of Disputes
(l) GCC 39 Arbitration
(m) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us shall make our bid non-responsive as per provision of bidding documents and rejected by you.
3.0 We undertake, if our bid is accepted, to commence the work on Facilities immediately upon your Notification of Award to us, and to achieve Completion within the time stated in the Bidding Documents.
4.0 If our bid is accepted, we undertake to provide a Performance Security(ies) in the form and amounts, and within the times specified in the Bidding Documents.
5.0 We agree to abide by this bid for a period of 180 (one hundred and eighty) days after the date of opening of Techno - Commercial Part i.e. First Envelope as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
6.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
7.0 We understand that you are not bound to accept the lowest or any bid you may receive.
*12.0 (for Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 1
8.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain
Yours faithfully,
For and on behalf of : 1
Date : 00 January 1900 Printed Name: 0
Place : Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
(State/Province to be indicated)
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for:
(a) Attachment 2: Power of Attorney.
(b) Attachment 7: The details of Alternative Bid
(For Attachments 2 and 7, Bidders may use their own proforma for furnishing the required information with the bid).
Specification No. :5002001680/SUB-STATION(INCLUDIN/DOM/K00 - NR3 RHQ -1 Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contract Services 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
"Saudamini", Plot No. 2, Sector 29 11 eleven 11 th 11 November
Gurgaon (Haryana) - 122001 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Provision of two nos. 220 kV Line Bays at 765/400kV Fatehpur Substation under consultancy for North Central Railways 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 0 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Enter details here. Pay Order 19 nineteen 19 th
Or Online Payment Acknowledgement towards Bid Security for a sum of ................................................ (name of currency and amount in words and figures)
Or documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 13.1 of ITB, Section-II Please note that if bid validity is less than 250(Two Hundred and Fifty) days from the date set for opening of bids, your bid may be rejected
(b) Attachment 2() : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3() : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). 0 Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 1 Not Applicable 24 th
(d) Attachment 4() : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5() : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A() : (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works 27 th
(g) Attachment 6() : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 28 th
(h) Attachment 7() : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 29 th
(i) Attachment 8() : Manufacturer’s Authorisation Forms. 30 th
(j) Attachment 9() : Work Completion Schedule. 31 st
(k) Attachment 10() : Guarantee Declaration.
(l) Attachment 11() : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12() : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13() : Declaration regarding Social Accountability.
(o) Attachment 14() : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15() : Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16() : Additional Information.
(r) Attachment 17() : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18() : Safety Pact
(t) Attachment 19 () : Declaration.
(u) Attachment 20 () : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21 () : Authorization certificate issued by Domestic Manufacturer for selling Domestically Manufactured Iron &Steel Products
(w) Attachment 22 () : Self Certification regarding Domestic Value Addition in Iron & Steel Products
(x) Attachment 23 () : Self certification regarding Minimum Local Content in line with PPP-MII order, 2017 if applicable
(y) Attachment 24 () : Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable
(y) Attachment 25 () : Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
2.2 We are a Micro and Small Enterprise (MSE) registered with
a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012. (applicable for MSE only)
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c) GCC 5.7 Contractors Responsibility
(d) GCC 8 Terms of Payment
(e) GCC 9.3 Performance Security
(f) GCC 10 Taxes and Duties
(g) GCC 21.2 Completion Time Guarantee
(h) GCC 22 Defect Liability
(i) GCC 23 Functional Guarantee
(j) GCC 25 Patent Indemnity
(k) GCC 26 Limitation of Liability
(l) GCC 38 Settlement of Disputes
(m) GCC 39 Arbitration
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and address of agent Amount and Currency Purpose of Commission or gratuity
(If none, state “none”)
13.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1 Other Partner -2 2
Printed Name : Printed Name :
Designation : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2() Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2() Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
ANNEXURE - 1.1.1
DETAILS OF PRELIMINARY WORKS AND LAND & COMPENSATION
FOR TRANSMISSION LINES
PRELIMINARY WORKS
LINE RATE PER AMOUNT
LENGTH KM. (Rs. Lakhs)
(Km.) (Rupees) SERVICE
Preliminary survey & soil investigation : TAX 1.0000
1.0 LILO OF VAPI - KHADOLI 220kV D/C TRANSMISSION LINE 5 10,000 0.46
2.0 LILO of Siliguri (Existing) - Purnea 400kV D/c line(on which reconductoring is carried out) at new pooling station Kishanganj with high capacity (high temparature and low sag) conductor 12 10,000 1.20
3.0 LILO of Siliguri - Dalkhola 220kV D/c line at new pooling station Kishanganj 12 10,000 1.20
4.0 LILO of Gangtok - Melli 132kV S/c line at Rangpo 9.5 10,000 0.95
5.0 LILO of Teests III - Kishnaganj 400kV D/c (Quad) line (to be constructed through JV route) at New- Melli #REF! 10,000 #REF!
6.0 Rangpo - New Melli 220KV D/C Line (with twin Moose conductor) #REF! 10,000 #REF!
7.0 LILO of Gangtok -Rangit 132kV S/c line at Rangpo #REF! 10,000 #REF!
8.0 LILO of Teests V - Siliguri 400kV D/c line at New- Melli #REF! 10,000 #REF!
9.0 Kishanganj - Patna 400kV D/c (Quad) line #REF! 10,000 #REF!
ANNEXURE - 1.1.2
LAND & COMPENSATION
LINE RATE PER AMOUNT
LENGTH KM. (Rs. Lakhs)
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF!
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 184.0 Ha 45,000 per Ha 82.80 KM Ha
ii) NPV for forest area diverted 92.0 Ha 920,000 per Ha 846.40 20.00 92.00
Total Cost of Compensatory afforestation (20.00 KM) 929.20
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF!
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 18.4 Ha 45,000 per Ha 8.28 KM Ha
ii) NPV for forest area diverted 9.2 Ha 920,000 per Ha 84.64 2.00 9.20
Total Cost of Compensatory afforestation (2.00 KM) 92.92
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF!
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 35.0 Ha 45,000 per Ha 15.75 KM Ha
ii) NPV for forest area diverted 17.5 Ha 920,000 per Ha 161.00 5.00 17.50
Total Cost of Compensatory afforestation (5.00 KM) 176.75
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF!
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 35.0 Ha 45,000 per Ha 15.75 KM Ha
ii) NPV for forest area diverted 17.5 Ha 920,000 per Ha 161.00 5.00 17.50
Total Cost of Compensatory afforestation (5.00 KM) 176.75
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF!
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 27.0 Ha 45,000 per Ha 12.15 KM Ha
ii) NPV for forest area diverted 13.5 Ha 920,000 per Ha 124.20 5.00 13.50
Total Cost of Compensatory afforestation (5.00 KM) 136.35
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 64.8 Ha 45,000 per Ha 29.16 KM Ha
ii) NPV for forest area diverted 32.4 Ha 920,000 per Ha 298.08 12.00 32.40
Total Cost of Compensatory afforestation (12.00 KM) 327.24
i) Cost of Crop & PTCC compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 18.40 Ha 45,000 per Ha 8.28 KM Ha
ii) NPV for forest area diverted 9.20 Ha 920,000 per Ha 84.64 2.00 9.20
Total Cost of Compensatory afforestation (2.00 KM) 92.92
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 18.40 Ha 45,000 per Ha 8.28 KM Ha
ii) NPV for forest area diverted 9.20 Ha 920,000 per Ha 84.64 2.00 9.20
Total Cost of Compensatory afforestation (2.00 KM) 92.92
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 91.00 Ha 45,000 per Ha 40.95 KM Ha
ii) NPV for forest area diverted 45.50 Ha 920,000 per Ha 418.60 13.00 45.50
Total Cost of Compensatory afforestation (13.00 KM) 459.55
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 97.20 Ha 45,000 per Ha 43.74 KM Ha
ii) NPV for forest area diverted 48.60 Ha 920,000 per Ha 447.12 18.00 48.60
Total Cost of Compensatory afforestation (18.00 KM) 490.86
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 64.40 Ha 45,000 per Ha 28.98 KM Ha
ii) NPV for forest area diverted 32.20 Ha 920,000 per Ha 296.24 7.00 32.20
Total Cost of Compensatory afforestation (7.00 KM) 325.22
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 133.00 Ha 45,000 per Ha 59.85 KM Ha
ii) NPV for forest area diverted 66.50 Ha 920,000 per Ha 611.80 19.00 66.50
Total Cost of Compensatory afforestation (19.00 KM) 671.65
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 84.00 Ha 45,000 per Ha 37.80 KM Ha
ii) NPV for forest area diverted 42.00 Ha 920,000 per Ha 386.40 12.00 42.00
Total Cost of Compensatory afforestation (12.00 KM) 424.20
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 350.00 Ha 45,000 per Ha 157.50 KM Ha
ii) NPV for forest area diverted 175.00 Ha 920,000 per Ha 1,610.00 50.00 175.00
Total Cost of Compensatory afforestation (50.00 KM) 1767.50
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 91.00 Ha 45,000 per Ha 40.95 KM Ha
ii) NPV for forest area diverted 45.50 Ha 920,000 per Ha 418.60 13.00 45.50
Total Cost of Compensatory afforestation (13.00 KM) 459.55
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 175.00 Ha 45,000 per Ha 78.75 KM Ha
ii) NPV for forest area diverted 87.50 Ha 920,000 per Ha 805.00 25.00 87.50
Total Cost of Compensatory afforestation (25.00 KM) 883.75
Total Cost of Compensation towards Crop & PTCC (PART-A) #REF! TOTAL KM TOTAL Ha
Total cost of Compensatory Afforestation (PART-A) 7,507.33 210.00 743.30
*Note: 1. A total of 743.30 Ha (210Km) forest stretch (Including Reserve and Protected Forest & Road and canal crossings) covered under Supreme Court ruling of 1996(Forest like area irrespective of ownership) is likely to be encountered in the proposed transmission project. As per recent Supreme Court Ruling dated 30.10.2002 issued on 13.11.2002 User agency in addition to cost of Compensatory Afforestation (CA) has to pay now cost of Forest land based on Net Present Value (NPV) ranging from Rs.5.8 Lakhs to Rs.9.2 Lakhs per Ha. depending upon the type of forest land diverted. However, most of the state govt.(Forest deptt.)are charging the maximum amount of Rs.9.2 Lakhs per Ha. therefore the same has been considered as cost of NPV.
Dehri-Sahupuri line of BSEB
i) Cost of Crop & PTCC compensation 0 100,000 0.00
Total Land & Compensation (Double degraded per Ha 0.00
Dumraon-Ara(BSEB)
i) Cost of Crop & PTCC compensation 0 100,000 0.00
Total Land & Compensation (Double degraded per Ha 0.00
Crop compensation is considered for line length excluding forest stretch.
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 70.00 Ha 45,000 per Ha 31.50 KM Ha
ii) NPV for forest area diverted 35.00 Ha 920,000 per Ha 322.00 10.00 35.00
Total Cost of Compensatory afforestation (10.00 KM) 353.50
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 80.96 Ha 45,000 per Ha 36.43 KM Ha
ii) NPV for forest area diverted 40.48 Ha 920,000 per Ha 372.42 8.80 40.48
Total Cost of Compensatory afforestation (8.80 KM) 408.85
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 501.40 Ha 45,000 per Ha 225.63 KM Ha
ii) NPV for forest area diverted 250.70 Ha 920,000 per Ha 2,306.44 54.50 250.70
Total Cost of Compensatory afforestation (54.50 KM) 2532.07
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 501.40 Ha 45,000 per Ha 225.63 KM Ha
ii) NPV for forest area diverted 250.70 Ha 920,000 per Ha 2,306.44 54.50 250.70
Total Cost of Compensatory afforestation (54.50 KM) 2532.07
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 70.00 Ha 45,000 per Ha 31.50 KM Ha
ii) NPV for forest area diverted 35.00 Ha 920,000 per Ha 322.00 10.00 35.00
Total Cost of Compensatory afforestation (10.00 KM) 353.50
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 210.00 Ha 45,000 per Ha 94.50 KM Ha
ii) NPV for forest area diverted 105.00 Ha 920,000 per Ha 966.00 30.00 105.00
Total Cost of Compensatory afforestation (30.00 KM) 1060.50
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 140.00 Ha 45,000 per Ha 63.00 KM Ha
ii) NPV for forest area diverted 70.00 Ha 920,000 per Ha 644.00 20.00 70.00
Total Cost of Compensatory afforestation (20.00 KM) 707.00
LILO OF VAPI - KHADOLI 220kV D/C TRANSMISSION LINE
i) Cost of Crop compensation 4.31 100,000 4.31
ii) Cost of PTCC compensation 4.60 50,000 2.30 based on site information
Total Cost of Crop & PTCC compensation 6.61
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.29 1.00
Total Cost of Compensatory afforestation (0.29 KM) 11.33
LILO of Siliguri (Existing) - Purnea 400kV D/c line(on which reconductoring is carried out) at new pooling station Kishanganj with high capacity (high temparature and low sag) conductor
i) Cost of Crop compensation 11.78 100,000 11.78
ii) Cost of PTCC compensation 12.00 50,000 6.00 based on site information
Total Cost of Crop & PTCC compensation 17.78
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.22 1.00
Total Cost of Compensatory afforestation (0.22 KM) 11.33
LILO of Siliguri - Dalkhola 220kV D/c line at new pooling station Kishanganj
i) Cost of Crop compensation 11.78 50,000 5.89
ii) Cost of PTCC compensation 12.00 50,000 6.00 based on site information
Total Cost of Crop & PTCC compensation 11.89
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.22 1.00
Total Cost of Compensatory afforestation (0.22 KM) 11.33
LILO of Gangtok - Melli 132kV S/c line at Rangpo
i) Cost of Crop compensation 9.28 50,000 4.64
ii) Cost of PTCC compensation 9.50 50,000 4.75 based on site information
Total Cost of Crop & PTCC compensation 9.39
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.22 1.00
Total Cost of Compensatory afforestation (0.22 KM) 11.33
LILO of Teests III - Kishnaganj 400kV D/c (Quad) line (to be constructed through JV route) at New- Melli
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.22 1.00
Total Cost of Compensatory afforestation (0.22 KM) 11.33
Rangpo - New Melli 220KV D/C Line (with twin Moose conductor)
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.29 1.00
Total Cost of Compensatory afforestation (0.29 KM) 11.33
LILO of Gangtok -Rangit 132kV S/c line at Rangpo
i) Cost of Crop compensation #REF! 50,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.37 1.00
Total Cost of Compensatory afforestation (0.37 KM) 11.33
LILO of Teests V - Siliguri 400kV D/c line at New- Melli
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.22 1.00
Total Cost of Compensatory afforestation (0.22 KM) 11.33
Kishanganj - Patna 400kV D/c (Quad) line
i) Cost of Crop compensation #REF! 100,000 #REF!
ii) Cost of PTCC compensation #REF! 50,000 #REF! based on site information
Total Cost of Crop & PTCC compensation #REF!
i) Cost of compensatory afforestation on double degraded forest 2.00 Ha 45,000 per Ha 0.90 KM Ha
ii) NPV for forest area diverted 1.00 Ha 1,043,000 per Ha 10.43 0.22 1.00
Total Cost of Compensatory afforestation (0.22 KM) 11.33
Total Cost of Compensation towards Crop & PTCC 6.61 TOTAL KM TOTAL Ha
Total cost of Compensatory Afforestation 11.33 0.94 1.00
*Note: 1. A total of 1.0 Ha (0.29 kM) forest stretch ( Road and canal crossings) is likely to be encountered in the proposed transmission project. User agency in addition to cost of Compensatory Afforestation (CA) has to pay now cost of Forest land based on Net Present Value (NPV) ranging from Rs.4.38 Lakhs to Rs.10.43 Lakhs per Ha. depending upon the type of forest land diverted. However, most of the state govt.(Forest deptt.)are charging the maximum amount of Rs.10.43 Lakhs per Ha. therefore the same has been considered as cost of NPV.
Dehri-Sahupuri line of BSEB
i) Cost of Crop & PTCC compensation 0 100,000 0.00
Total Land & Compensation (Double degraded per Ha 0.00
Dumraon-Ara(BSEB)
i) Cost of Crop & PTCC compensation 0 100,000 0.00
Total Land & Compensation (Double degraded per Ha 0.00
Crop compensation is considered for line length excluding forest stretch. 744.30
ANNEXURE - 1.2.1 1
SUBSTATION: AUGMENTATION OF 220/66 kV KHARADPADA OLD SUBSTATION #REF! (Rs. in Lakhs) #REF! 1
#REF! #REF! #REF! #REF! #REF! 1
Sr. Total Entry Tax Ere/Civil Service Total 1
No. Description Unit Qty. Rate Rate Total Spares Exw. & F&I #REF! #REF! @ Works Tax @ 1
Incl. E.D. 0.03 Spares CST #REF! #REF! 0.0% 0.0% 1
1 Transformers 1
1.1 160MVA, 220/132 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.2 100MVA, 220/132 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.3 33.33MVA, 220/132 KV, 1-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.4 50MVA, 220/33 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.5 100MVA, 132/66KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.6 50MVA, 132/66KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.7 25MVA, 132/66KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.8 30MVA, 132/66KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.9 50MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.10 40MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.11 31.5MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.12 25MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.13 20MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.14 16MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.15 15MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.16 12.5MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.17 10MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.18 5.33 MVA, 132/33KV, 1-Ph Power Transformer Nos. #REF! 0.00 #REF! 0
1.19 20MVA, 132/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.20 15MVA, 132/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.21 10MVA, 132/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.22 7.5MVA, 132/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.23 50MVA, 66/33 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.24 25MVA, 66/33 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.25 10MVA, 33/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.26 5MVA, 33/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1 220 KV power transformers & reactors
1.1 160 MVA, 220/66 KV (3-ph) power transformers including oil Nos. 2 509.59 #REF! #REF! #REF! #REF! #REF! #REF! 11.02 #REF! 550774.00
1.2 Dismantling of 100 MVA, 220/66KV (3-ph) power transformer Nos. 2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Type test charges incl short ckt. Test LS #REF! #REF! #REF! #REF! #REF! 0
Sub Total 1.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 SWITCHYARD EQUIPMENT 1
2.1 72.5 KV Equipment 0
2.1.1 220 KV Circuit Breaker 3Ph Nos. 13.01 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00 #REF! 19526.00 0
2.1.1 72.5KV Isolator 3-ph, 1600A Nos. 8 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
2.1.2 72.5KV Current Transformer 1PH, 1250A 150% extended Nos. 6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
2.1.4 220KV CVT 1Ph Nos. 2.34 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00 #REF! 4275.00 0
2.1.5 216 KV Surge Arrestor 1Ph Nos. 0.50 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00 #REF! 2239.00 0
Sub Total 2.1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.1.6 220kV GIS #REF!
2.1.6.1 245kV, 1600A, SF6 gas insulated Transformer bay module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.2 245kV, 2000A, SF6 gas insulated Line bay module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.3 245kV, 3 - single phase, SF6 gas insulated 3000A bus bars including bus PTs Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.4 245kV, 3 single phase, SF6 gas insulated 3000A Bus Coupler module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.5 Testing and Maintenance equipment #REF! 0
a. SF6 Gas filling & evacuating plant Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
b. Partial Discharge monitoring system Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Dew point meter
2.1.6.6 220 KV, XLPE cable and accessories for above L.S. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.7 TYPE TEST & TRAINING CHARGES for GIS L.S. #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub Total 2.1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.2 132KV Equipment #REF!
2.2.1 132 KV Circuit Breaker 3Ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.2.2 132KV Isolator 3-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.2.3 132KV Current Transformer 1PH Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.2.4 132KV CVT 1Ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.2.5 120 KV Surge Arrestor 1Ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub Total 2.2 #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
2.3 132 kV GIS #REF!
2.3.1 145kV, 1250A, SF6 gas insulated Transformer bay module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.3.2 145kV, 1250A, SF6 gas insulated line bay module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.3.3 145kV, 3 phase, SF6 gas insulated 2000A bus bars including bus PTs Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
145kV, 3 phase, SF6 gas insulated 2000A bus bars Extn.
2.3.4 145kV, 3 single phase, SF6 gas insulated 2000A bus Coupler module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.3.5 Testing and Maintenance equipment #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
a. SF6 Gas filling & evacuating plant Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
b. Partial Discharge monitoring system Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Dew point meter #REF! #REF! 0
EOT Crane #REF! 0
2.3.6 132 KV, XLPE cable and accessories for both end L.S. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.3.7 TRAINING CHARGES for GIS L.S. #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 2.3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.4 66KV Equipment #REF!
2.4.1 66 KV Circuit Breaker ,3-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.4.2 66KV Isolator, 3-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.4.3 66KV Current Transformer 1-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.4.4 66 KV Capacitive Voltage Transformer, 1-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.4.5 60KV Surge arrestor (1-Ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 2.4 #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.5 33 KV Equipment #REF!
2.5.1 33 KV Circuit Breaker (3-Ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.2 33 KV Isolator (3-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.3 33 KV Current Transformer (1-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.4 33 KV Pontential Transformer (1-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.5 33 KV Horn gap fuse (3 ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.6 30 KV Surge Arrestor(1 ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.7 Indoor switchgear panel for 33KV line feeder Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.8 Indoor switchgear panel for 33KV ICT feeder with Bus PT Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.9 Indoor switchgear panel for 33KV LT Transformer feeder Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.10 Indoor switchgear panel for Bus PT Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.11 Indoor switchgear panel for 33KV Bus Sectionaliser Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 2.5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
2.6 11 KV Equipment #REF!
2.6.1 11 KV Circuit Breaker (3-Ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.2 11 KV Isolator (3-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.3 11 KV Current Transformer (1-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.4 11 KV Pontential Transformer (1-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.5 11 KV Horn gap fuse (3 ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.6 11 KV Lightning Arrestor(1 ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.7 Indoor switchgear panel for 11KV line feeder Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.8 Indoor switchgear panel for 11KV ICT feeder with Bus PT Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.9 Indoor switchgear panel for 11KV LT Transformer feeder Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.10 Indoor switchgear panel for 11KV Bus PT Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.11 Indoor switchgear panel for 11KV Bus Sectionaliser Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 2.6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 C&R PANELS AND SAS/RTU 1
3.1 SUBSTATION AUTOMATION SYSTEM/RTU #REF!
3.1.1 SUBSTATION AUTOMATION SYSTEM (New) Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.1.2 SUBSTATION AUTOMATION SYSTEM (Aug.) Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.1.3 RTU/RTU AUGMENTATION Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3.2 Control & Relay Panels (220kV) #REF!
3.3.1 CB Relay panel with A/R Sets 3.75 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00 #REF! 6076.00
3.3.1 Control, Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.2 Control, Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.3 Control, Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.4 Relay & Protection Panel for Line Sets 8.64 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00 #REF! 6870.00 0
3.3.5 Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.6 Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.6 Relay & Protection Panel for transfer Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.2.7 Bus bar protection panel Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.2.8 Bus bar protection panel -Augmentation Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.2.9 Common Equipment Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.2.10 Time synchronisation equipment Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.2 #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! 0.00 #REF!
3.3 Control & Relay Panels (132kV) #REF! #REF!
3.3.1 Control, Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.2 Control, Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.3 Control, Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.4 Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.5 Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.6 Relay & Protection Panel for Transfer Bus Coupler /Bus Sectionaliser Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.7 Bus bar protection panel Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.8 Common Equipment Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.9 Time synchronisation equipment Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
3.4 Control & Relay Panels (66kV) #REF! #REF!
3.4.1 Control, Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.2 Control, Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.3 Control, Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.4 Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.5 Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.6 Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
3.5 Control & Relay Panels (33kV) #REF! #REF!
3.5.1 Control, Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.5.2 Control, Relay & Protection Panel for LT Transformer Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.5.3 Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.5.4 Relay & Protection Panel for LT Transformer Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Sub - Total 3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
4.0 PLCC Equipment 1
4.1 PLCC Equipment (220 KV) #REF!
4.1.1 1600A, 0.5/1.0 mH Line Traps Nos. 2.91 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00 #REF! 8,249.00 0
4.1.2 Coupling Device Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.3 H.F. Cable Km. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.4 Carrier Equipment Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.5 Protn. Coupler Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.5 Digital Protn. Coupler Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.6 Testing and maintenance Equipment (Print test kit) Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 4.1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
4.2 PLCC Equipment (132 KV) #REF! #REF!
4.2.1 1250A, 0.5/1.0 mH Line Traps Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.2 Coupling Device Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.3 H.F. Cable Km. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.4 Carrier Equipment Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.5 Protn. Coupler Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.5 Digital Protn. Coupler Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.6 Testing and maintenance Equipment (Print test kit) Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.7 EPAX (24/8) Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total - 4.2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
Sub - Total - 4.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
SWITCHYARD ERECTION 1
3.0 Equipment Structure L.S. 1 10.00 10.00 0.00 10.00 1
4.0 Other Equipment (Bus Bar materials) L.S. 1 5.00 5.00 0.00 5.00 1
5.0 Equipment Civil works L.S. 1 5.00 5.00 1
6.0 Erection L.S. 1 #REF! #REF! 1
7.0 Building civil works (220 kv fire fighting pump house) L.S. 1 10.00 10.00 1
SUBSTATION AUXILIARIES 1
8.0 Fire Fighting System L.S. 1 2.00 2.00 0.00 2.00 1
9.0 Air Conditioning & Ventilation L.S. 1 2.00 #REF! 2.00 0.00 2.00 1
9.0 Lighting system L.S. 1 3.00 #REF! 3.00 0.00 3.00 1
12.0 D.G. Set (250 KVA) Nos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
13.0 D.G. Set (100 KVA) Nos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
14.0 Battery and Battery charger L.S. 0.00 #REF! 0.00 0.00 0.00 0
10.0 Power & Control Cables L.S. 1 5.00 5.00 0.00 5.00 1
14.0 33KV XLPE CABLE For interconnection between 33kV side of ICT to 33kV switchyard Km #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
16.0 Misc. testing instruments L.S. 0.00 #REF! 0.00 0.00 0.00 0
17.0 LT Transformer 33KV/0.433KV, 800 KVA Nos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
18.0 LT Transformer 33KV/0.433KV, 400 KVA Nos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
19.0 LT Switch gear L.S. 0.00 #REF! 0.00 0.00 0.00 0
11.0 Training charges L.S. 1 5.00 5.00 5.00 1
Sub Total 28.00 #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0.00 #REF!
Sub station Total #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
~ CUSTOMS DUTY INCL HANDLING CHARGES #REF! #REF!
GRAND TOTAL #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PROJ: #REF! ANNEXURE - 1.3.1 - SS2 1
SUBSTATION: 220 kV RANGIA SUBSTATION EXTN - PRIORITY 1 0.00 #REF! (Rs. in Lakhs) #REF! 1
PRIORITY 1 #REF! #REF! #REF! #REF! #REF! 1
Sr. Total Entry Tax Ere/Civil Service Total 1
No. Description Unit Qty. Rate Total Spares Exw. & F&I #REF! #REF! @ Works Tax @ 1
excl. E.D. Spares CST #REF! #REF! 4.0% 0.0% 1
1 Transformers 1
1.1 160MVA, 220/132 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.2 100MVA, 220/132 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.3 33.33MVA, 220/132 KV, 1-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.4 50MVA, 220/33 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.5 100MVA, 132/66KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.6 50MVA, 132/66KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.7 25MVA, 132/66KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.8 30MVA, 132/66KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.9 50MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.10 40MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.11 31.5MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.12 25MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.13 20MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.14 16MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.15 15MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.16 12.5MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.17 10MVA, 132/33KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.18 5.33 MVA, 132/33KV, 1-Ph Power Transformer Nos. #REF! 0.00 #REF! 0
1.19 20MVA, 132/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.20 15MVA, 132/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.21 10MVA, 132/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.22 7.5MVA, 132/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.23 50MVA, 66/33 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.24 25MVA, 66/33 KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.25 10MVA, 33/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
1.26 5MVA, 33/11KV, 3-Ph Power Transformer Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Type test charges incl short ckt. Test LS #REF! #REF! #REF! #REF! #REF! 0
Sub Total 1.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 SWITCHYARD EQUIPMENT 1
2.1 220KV Equipment 0
2.1.1 220 KV Circuit Breaker 3Ph Nos. 2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
2.1.2 220KV Isolator 3-ph Nos. 8 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
2.1.3 220KV Current Transformer 1PH Nos. 6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
2.1.4 220KV CVT 1Ph Nos. 6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
2.1.5 216 KV Surge Arrestor 1Ph Nos. 6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
Sub Total 2.1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.1.6 220kV GIS #REF!
2.1.6.1 245kV, 1600A, SF6 gas insulated Transformer bay module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.2 245kV, 1600A, SF6 gas insulated line bay module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.3 245kV, 3 single phase, SF6 gas insulated 3000A bus bars including bus PTs Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.4 245kV, 3 single phase, SF6 gas insulated 3000A bus Section module Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.5 Testing and Maintenance equipment #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
a. SF6 Gas filling & evacuating plant Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
b. Partial Discharge monitoring system Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.6 132 KV, XLPE cable and accessories for above L.S. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.1.6.7 TYPE TEST & TRAINING CHARGES for GIS L.S. #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub Total 2.1 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF!
2.2 132KV Equipment #REF!
2.2.1 132 KV Circuit Breaker 3Ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.2.2 132KV Isolator 3-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.2.3 132KV Current Transformer 1PH Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.2.4 132KV CVT 1Ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.2.5 120 KV Surge Arrestor 1Ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub Total 2.2 #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
2.3 132 kV GIS #REF!
2.3.1 145kV, 1250A, SF6 gas insulated Transformer bay module Set #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0
2.3.2 145kV, 1250A, SF6 gas insulated line bay module Set #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0
2.3.3 145kV, 3 single phase, SF6 gas insulated 2000A bus bars including bus PTs Set #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0
2.3.4 145kV, 3 single phase, SF6 gas insulated 2000A bus Section module Set #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0
2.3.5 Testing and Maintenance equipment #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0
a. SF6 Gas filling & evacuating plant Set #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0
b. Partial Discharge monitoring system Set #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0
2.3.6 132 KV, XLPE cable and accessories for above L.S. #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 0
2.3.7 TYPE TEST & TRAINING CHARGES for GIS L.S. #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 2.3 #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF!
2.4 66KV Equipment #REF!
2.4.1 66 KV Circuit Breaker ,3-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.4.2 66KV Isolator, 3-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.4.3 66KV Current Transformer 1-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.4.4 66 KV Capacitive Voltage Transformer, 1-ph Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.4.5 60KV Surge arrestor (1-Ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 2.4 #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.5 33 KV Equipment #REF!
2.5.1 33 KV Circuit Breaker (3-Ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.2 33 KV Isolator (3-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.3 33 KV Current Transformer (1-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.4 33 KV Pontential Transformer (1-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.5 33 KV Horn gap fuse (3 ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.6 30 KV Surge Arrestor(1 ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.7 Indoor switchgear panel for 33KV line feeder Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.8 Indoor switchgear panel for 33KV ICT feeder with Bus PT Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.9 Indoor switchgear panel for 33KV LT Transformer feeder Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.10 Indoor switchgear panel for Bus PT Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.5.11 Indoor switchgear panel for 33KV Bus Sectionaliser Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 2.5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
2.6 11 KV Equipment #REF!
2.6.1 11 KV Circuit Breaker (3-Ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.2 11 KV Isolator (3-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.3 11 KV Current Transformer (1-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.4 11 KV Pontential Transformer (1-ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.5 11 KV Horn gap fuse (3 ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.6 11 KV Lightning Arrestor(1 ph) Nos. #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.7 Indoor switchgear panel for 11KV line feeder Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.8 Indoor switchgear panel for 11KV ICT feeder with Bus PT Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.9 Indoor switchgear panel for 11KV LT Transformer feeder Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.10 Indoor switchgear panel for 11KV Bus PT Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
2.6.11 Indoor switchgear panel for 11KV Bus Sectionaliser Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 2.6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 C&R PANELS AND SAS/RTU 1
3.1 SUBSTATION AUTOMATION SYSTEM/RTU #REF!
3.1.1 SUBSTATION AUTOMATION SYSTEM (New) Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.1.2 SUBSTATION AUTOMATION SYSTEM (Aug.) Set 1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
3.1.3 RTU/RTU AUGMENTATION Set #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3.2 Control & Relay Panels (220kV) #REF!
3.3.1 Control, Relay & Protection Panel for Line Sets 2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
3.3.2 Control, Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.3 Control, Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.4 Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.5 Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.6 Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.2.7 Bus bar protection panel Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.2.8 Bus bar protection panel-Augmentation 1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
3.2.9 Common Equipment Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.2.10 Time synchronisation equipment Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
3.3 Control & Relay Panels (132kV) #REF!
3.3.1 Control, Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.2 Control, Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.3 Control, Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.4 Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.5 Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.6 Relay & Protection Panel for Transfer Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.7 Bus bar protection panel Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.8 Common Equipment Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.3.9 Time synchronisation equipment Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
3.4 Control & Relay Panels (66kV) #REF!
3.4.1 Control, Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.2 Control, Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.3 Control, Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.4 Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.5 Relay & Protection Panel for Transformer (Both HV & LV) Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.4.6 Relay & Protection Panel for Bus Coupler Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
3.5 Control & Relay Panels (33kV) #REF!
3.5.1 Control, Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.5.2 Control, Relay & Protection Panel for LT Transformer Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.5.3 Relay & Protection Panel for Line Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
3.5.4 Relay & Protection Panel for LT Transformer Sets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 3.5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Sub - Total 3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
4.0 PLCC Equipment 1
4.1 PLCC Equipment (220 KV) #REF!
4.1.1 1600A, 0.5/1.0 mH Line Traps Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.2 Coupling Device Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.3 H.F. Cable Km. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.4 Carrier Equipment Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.5 Protn. Coupler Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.1.5 Digital Protn. Coupler Nos. 2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1
4.1.6 Testing and maintenance Equipment (Print test kit) Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total 4.1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
4.2 PLCC Equipment (132 KV) #REF!
4.2.1 1250A, 0.5/1.0 mH Line Traps Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.2 Coupling Device Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.3 H.F. Cable Km. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.4 Carrier Equipment Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.5 Protn. Coupler Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.6 Testing and maintenance Equipment (Print test kit) Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
4.2.7 EPAX (24/8) Nos. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Sub - Total - 4.2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
Sub - Total - 4.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
SWITCHYARD ERECTION 1
5.0 Equipment Structure L.S. 1 50.00 50.00 2.00 52.00 1
6.0 Other Equipment (Bus Bar materials) L.S. 1 36.00 36.00 1.44 37.44 1
7.0 Equipment Civil works L.S. 1 30.00 30.00 1
8.0 Erection L.S. 1 #REF! #REF! 1
SUBSTATION AUXILIARIES 1
9.0 Fire Fighting System L.S. 0.00 0.00 0.00 0.00 0
10.0 Air Conditioning & Ventilation L.S. 0.00 0.00 0.00 0.00 0
11.0 Lighting system L.S. 1 6.00 6.00 0.24 6.24 1
12.0 D.G. Set (250 KVA) Nos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
13.0 D.G. Set (100 KVA) Nos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
14.0 Battery and Battery charger L.S. 0.00 0.00 0.00 0.00 0
15.0 Power & Control Cables including 33 kV Cables (if any) L.S. 1 24.00 24.00 0.96 24.96 1
16.0 Misc. testing instruments L.S. 0.00 0.00 0.00 0.00 0
17.0 LT Transformer 33KV/0.433KV, 800 KVA Nos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
18.0 LT Transformer 33KV/0.433KV, 400 KVA Nos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
19.0 LT Switch gear EXTN L.S. 1 5.00 5.00 0.20 5.20 1
20.0 Type test charges L.S. 0.00 0.00 0.00 0
Sub Total 41.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
Sub station Total #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
~ CUSTOMS DUTY INCL HANDLING CHARGES #REF! #REF!
GRAND TOTAL #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PROJECT TOTAL - SUBSTATIONS-PHASE-I-TRIPURA #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0 0 0.000
TOTAL CUSTOMS DUTY INCL HANDLING CHARGES 0.00 0.00 0.00 0.00 0.00 0.00 #REF! 0 0 0.000
PACKAGE : PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID
SUBSTATION : 765/400/220 kV Fatehpur S/S (Extn.)
Sl. No. RFX no. Description Quantity Unit
1 1 245KV, 1600A, 40KA, 3PH CIRCUIT BREAKER 2.000 EA
2 3 245KV, 1600A, 40KA,1-PH, CT-120% RATING 6.000 EA
3 4 245KV, 4400PF, 1PH CVT 6.000 EA
4 5 245KV, 1600A, 40KA, 3PH DB ISOLATOR+1E/S 2.000 EA
5 6 245KV, 1600A, 40KA, 3PH DB ISOLATOR+2E/S 2.000 EA
6 7 245KV,1600A,40KA 3PH DB ISOLATOR(TANDEM) 4.000 EA
7 8 SURGE ARRESTER ZNO GAPLESS-216KV,20KA,1P 6.000 EA
8 9 245KV, 1PH BUST POST INSULATOR (BPI) 26.000 EA
9 10 220KV LINE PROTECTION PANEL-SAS 2.000 EA
10 11 220KV CB RELAY PANEL WITH A/R-SAS 2.000 EA
11 12 220KV BUS BAR PROTECTION AUGMENT-SAS 1.000 SET
12 13 RELAY TEST KIT 1.000 EA
13 14 220KV S/S AUTOMATION SYSTEM-MAIN BAY-AUG 2.000 EA
14 15 LINE CURRENT DIFFERENTIAL RELAY 1.000 SET
15 16 220KV, 1600A, 0.5MH, 40 KA LINE TRAP 2.000 EA
16 17 245KV, 1PH BPI FOR LINE TRAP (BPI) 6.000 EA
17 18 COUPLING DEVICE FOR PLCC 1.000 SET
18 19 CARRIER EQUIPMENT(S+D & S+P) ANALOG 1.000 EA
19 20 PROTECTION COUPLER FOR PLCC 1.000 EA
20 21 4 WIRE TELEPHONE EQUIPMENT 1.000 EA
21 22 TESTING & MAINT EQUIP (PRINT TEST)-PLCC 1.000 SET
22 23 HF CABLE FOR PLCC-75 OHM 500.000 M
23 24 COUPLING DEVICE FOR PLCC 1.000 SET
24 25 CARRIER EQUIPMENT(S+D & S+P) ANALOG 1.000 EA
25 26 PROTECTION COUPLER FOR PLCC 1.000 EA
26 27 4 WIRE TELEPHONE EQUIPMENT 1.000 EA
27 28 TESTING & MAINT EQUIP (PRINT TEST)-PLCC 1.000 SET
28 29 HF CABLE FOR PLCC-75 OHM 500.000 M
29 30 STD PIPE STRUCTURE - 220KV 1 PH CT 6.000 EA
30 31 STD PIPE STRUCTURE - 220KV 1PH CVT 6.000 EA
31 32 STD PIPE STRUCTURE - 220KV 3PH ISOLATOR 8.000 EA
32 33 STD PIPE STRUCTURE - 220KV 1PH SA 6.000 EA
33 34 PIPE STRUCTURE-220KV BPI (EXCL WT) 20.000 EA
34 35 PIPE STRUCTURE-220KV HIGH BPI (EXCL WT) 6.000 EA
35 36 PIPE STRUCTURE-220KV BPI FOR WT 6.000 EA
36 37 1.1KV 4CX16SQMM PVC POWER CABLE(KM) 1.000 KM
37 38 1.1KV 4CX6SQMM PVC POWER CABLE(KM) 1.000 KM
38 39 1.1KV 2CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
39 40 1.1KV 3CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
40 41 1.1KV 5CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
41 42 1.1KV 7CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
42 43 1.1KV 10CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
43 44 1.1KV 12CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
44 45 1.1KV 14CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
45 46 1.1KV 19CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
46 47 1.1KV 27CX2.5SQMM PVC CONTROL CABLE(KM) 1.000 KM
47 48 ERECTION H/W-220KV DMT LINE BAY 2.000 SET
48 49 ILLUMINATION SYSTEM-220KV PANEL ROOM 2.000 LS
49 50 LIGHTING FIXTURE LED LUMINAIRE TYPE FL-1 10.000 EA
50 51 LIGHTING PANEL TYPE ACP-3 2.000 EA
51 52 FIRE EXTINGUISHER-CO2 TYPE 4.5KG 2.000 EA
52 53 PTZ CAMERA+ACC+ H/S INTEGRATION-VMS AUG 1.000 SET
53 54 245KV, 1600A, 40KA SF6 CB POLE 1.000 EA
54 55 GASKET, O RING, SEAL FOR SF6-245KV CB 1.000 SET
55 56 TRIP COIL ASSY FOR 245KV SF6 CB 1.000 EA
56 57 CLOSING COIL ASSY FOR 245KV SF6 CB 1.000 EA
57 58 TERMINAL PAD-245KV SF6 CB 1.000 EA
58 59 MOLECULAR FILTER-245KV CIRCUIT BREAKER 1.000 EA
59 60 CORONA RING-245KV CB 1.000 EA
60 61 RELAY,CONTACTOR,SWITCH,PUSH BUT-245KV CB 1.000 SET
61 62 PRESSURE SWITCHES-245KV, SF6 CB (PO) 1.000 SET
62 63 AUX SWITCH/CONTACT ASSY-245KV SF6 CB 1.000 SET
63 64 245KV, 1600A, 40KA,1-PH, CT-120% RATING 1.000 EA
65 66 SPARE-216KV SURGE ARRESTER 1.000 SET
66 67 SURGE MONITOR,1-PH 1.000 EA
67 68 245KV,1600A ISOLATOR POLE 1.000 EA
68 69 COPPER CONTACT FINGER-245KV DB ISOLATOR 1.000 SET
69 70 CONTACTOR, TIMER, SWITCH-245KV ISOLATOR 1.000 SET
70 71 LIMIT SWITCH-245KV ISOLATOR 1.000 SET
71 72 TERMINAL PAD-245KV 1600A DB ISOLATOR 1.000 EA
72 73 1 POLE-245KV, 2500A, 40KA DB ISOLATOR+1E 1.000 EA
73 74 COPPER CONTACT FINGER-245KV DB ISOLATOR 1.000 SET
74 75 CONTACTOR, TIMER, SWITCH-245KV ISOLATOR 1.000 SET
75 76 LIMIT SWITCH-245KV ISOLATOR 1.000 SET
76 77 TERMINAL PAD-245KV 1600A DB ISOLATOR 1.000 EA
77 78 CORONA SHIELD RING-245KV HCB ISOLATOR 1.000 EA
78 79 NUMERICAL DISTANCE RELAY MAIN I 1.000 SET
79 80 POWER SUPPLY MODULE FOR B/B PROTECTION 1.000 SET
80 81 BAY UNIT MODULE-BUS BAR PROTECTION 1.000 EA
81 82 BAY CONTROL UNIT (IED) OF EACH TYPE 1.000 EA
82 83 EATHERNET SWITCH 1.000 SET
83 84 CARDS/PRINTS FOR CARRIER TERMINAL 2.000 SET
84 85 CARDS/PRINTS FOR PROTECTION COUPLER 2.000 SET
85 86 LINE CURRENT DIFFERENTIAL RELAY 2.000 SET
86 87 BASE EQUIPMENT STM-16 MADM UPTO 5 MSP 1.000 EA
90 91 OPTICAL INTERFACE SFP L4.2 2.000 EA
91 92 STM-16 OLIC TO SUPPORT 150 KMS 2.000 EA
92 93 STM-16 OLIC TO SUPPORT 225 KMS 2.000 EA
93 94 E1 INTERFACE (MIN 16 NOS.) 2.000 SET
94 95 ETHERNET L2 INTERFACE 10/100MBPS(MIN 8) 2.000 EA
95 96 GIGABIT ETHERNET LAYER 2 INTERFACE-2 NO 1.000 SET
96 97 NMS-CRAFT TERMINAL-HARDWARE 1.000 EA
97 98 SOFTWARE FOR CRAFT TERMINAL 1.000 EA
98 99 VOIP TELEPHONE+ONE COMMON S/W(MIN 8PORT) 2.000 EA
99 100 APPROACH CABLING: 24 F (KM) 1.000 KM
100 101 OPGW FODP, INDOOR, 96F 1.000 EA
101 102 EQUIPMENT CABINETS FOR SDH 1.000 EA
102 103 COMMON CARDS-STM16 MADM UPTO 5 MSP 1.000 SET
106 107 OPTICAL INTERFACE SFP L4.2 1.000 EA
107 108 STM-16 OLIC TO SUPPORT 150 KMS 1.000 EA
108 109 STM-16 OLIC TO SUPPORT 225 KMS 1.000 EA
109 110 E1 INTERFACE (MIN 16 NOS.) 1.000 SET
110 111 ETHERNET L2 INTERFACE 10/100MBPS(MIN 8) 1.000 EA
111 112 GIGABIT ETHERNET LAYER 2 INTERFACE-2 NO 1.000 SET
112 113 VOIP TELEPHONE+ONE COMMON S/W(MIN 8PORT) 1.000 EA
113 114 APPROACH CABLING: 24 F (KM) 1.000 KM
114 115 PRE CONNECT OPTICAL FIBER PATCH CORD 10M 1.000 SET
115 116 FOUNDATION BOLTS - 28MM DIA 452.000 EA
116 117 AC UNIT-SWITCHYARD PANEL ROOM 3M 2.000 SET
117 118 FIRE DETECTION& ALARMSYS-PANEL ROOM(3M) 2.000 SET
PACKAGE : PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID
SUBSTATION : 765/400/220 kV Fatehpur S/S (Extn.)
Sl. No. RFX No. Description Quantity Unit
1 2.AA 245KV, 1PH BUST POST INSULATOR (BPI) 26.000 EA
2 2.AB SURGE ARRESTER,1-PH,216KV 6.000 EA
3 2.AC 245KV, 1600A, 40KA 3PH DB ISOLAT(TANDEM) 4.000 EA
4 2.AD 245KV, 1600A, 40KA, 3PH DB ISOLATOR+2E/S 2.000 EA
5 2.AE 245KV, 1600A, 40KA, 3PH DB ISOLATOR+1E/S 2.000 EA
6 2.AF 245KV, 4400PF,1PH CVT 6.000 EA
7 2.AG 245KV, 1600A, 40KA,,1-PH, CT-120% RATING 6.000 EA
8 2.AH 245KV, 1600A, 40KA, 3PH CIRCUIT BREAKER 2.000 EA
9 2.AJ 220KV CB RELAY PANEL WITH A/R-SAS 2.000 EA
10 2.AK 220KV LINE PROTECTION PANEL-SAS 2.000 EA
11 2.AL 220KV BUS BAR PROTECTION AUGMENT-SAS 1.000 SET
12 2.AM 220KV S/S AUTOMATION SYSTEM-MAIN BAY-AUG 2.000 EA
13 2.AN 220KV, 1600A, 0.5MH, 40 KA LINE TRAP 2.000 EA
14 2.AP 245KV, 1PH BPI FOR LINE TRAP (BPI) 6.000 EA
15 2.AQ COUPLING DEVICE FOR PLCC 1.000 EA
16 2.AR CARRIER EQUIPMENT(S+D & S+P) ANALOG 1.000 EA
17 2.AS PROTECTION COUPLER (ANALOG) 1.000 EA
18 2.AT TELEPHONE INSTRUMENT 1.000 EA
19 2.AU COUPLING DEVICE FOR PLCC 1.000 EA
20 2.AV CARRIER EQUIPMENT(S+D & S+P) ANALOG 1.000 EA
21 2.AW PROTECTION COUPLER (ANALOG) 1.000 EA
22 2.AX TELEPHONE INSTRUMENT 1.000 EA
23 2.AY AC UNIT-SWITCHYARD PANEL ROOM 3M 2.000 SET
24 2.AZ PIPE STRUCTURE-220KV HIGH BPI (EXCL WT) 6.000 EA
25 2.BA PIPE STRUCTURE - 220 KV 1PH BPI ERECTION 20.000 EA
26 2.BB PIPE STRUCTURE - 220 KV 1PH SA ERECTION 6.000 EA
27 2.BC PIPE STRUCTURE - 220 KV 1PH WT ERECTION 6.000 EA
28 2.BD PIPE STRUCTURE-220KV 3PH ISOLATOR ERECTI 8.000 EA
29 2.BE PIPE STRUCTURE - 220 KV 1PH CVT ERECTION 6.000 EA
30 2.BF PIPE STRUCTURE - 220 KV 1PH CT ERECTION 6.000 EA
31 2.BG 1.1KV 10CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
32 2.BH 1.1KV 12CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
33 2.BJ 1.1KV 14CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
34 2.BK 1.1KV 19CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
35 2.BL 1.1KV 27CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
36 2.BM 1.1KV 2CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
37 2.BN 1.1KV 3CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
38 2.BP 1.1KV 4CX16SQMM PVC POWER CABLE (KM) 1.000 KM
39 2.BQ 1.1KV 4CX6SQMM PVC POWER CABLE (KM) 1.000 KM
40 2.BR 1.1KV 5CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
41 2.BS 1.1KV 7CX2.5SQMM PVC CONTROL CABLE (KM) 1.000 KM
42 2.BT HF CABLE FOR PLCC-75 OHM (KM) 1.000 KM
43 2.BU ERECTION H/W-220KV DMT LINE BAY 2.000 SET
44 2.BV LIGHTING PANEL TYPE ACP-3 2.000 EA
45 2.BW ILLUMINATION SYSTEM-220KV PANEL ROOM 2.000 SET
46 2.BX LIGHTING FIXTURE LED LUMINAIRE TYPE FL-1 10.000 EA
47 2.BY FIRE DETECTION& ALARMSYS-PANEL ROOM(3M) 2.000 SET
48 2.BZ SWITCHYARD PANEL ROOM-CIVIL WORK 23.000 M2
50 2.CB NP-3 PIPE 450MM DIA 16.000 M
51 2.CC NP-3 PIPE 300MM DIA 16.000 M
52 2.CD NP-3 PIPE 250MM DIA 32.000 M
53 2.CE STONE SPREADING EXCLUDING PCC 4,000.000 M2
54 2.CF ANTIWEED TREATMENT 4,000.000 M2
55 2.CG MISC STRUCTURAL STEEL 7.000 MT
56 2.CH STEEL REINFORCEMENT 13.000 MT
57 2.CJ PLAIN CEMENT CONCRETE (PCC-1:5:10) 225.000 M3
58 2.CK PLAIN CEMENT CONCRETE (PCC-1:2:4) 26.000 M3
59 2.CL PLAIN CEMENT CONCRETE (PCC-1:4:8) 40.000 M3
60 2.CM EXCAVATION 1,596.000 M3
61 2.CN PTZ CAMERA+ACC+ H/S INTEGRATION-VMS AUG 1.000 SET
62 2.CP VOIP TELEPHONE+ONE COMMON S/W(MIN 8PORT) 2.000 EA
63 2.CQ ETHERNET L2 INTERFACE 10/100MBPS(MIN 8) 2.000 EA
64 2.CR OPTICAL INTERFACE/SFP-L16.2 FOR STM-16 2.000 EA
65 2.CS OPTICAL INTERFACE/SFP-S16.1 FOR STM-16 2.000 EA
66 2.CT OPTICAL INTERFACE/SFP-L4.2 FOR STM-16 2.000 EA
67 2.CU OPTICAL INTERFACE/SFP-S4.1 FOR STM-16 2.000 EA
68 2.CV NMS-CRAFT TERMINAL-SOFTWARE 1.000 EA
69 2.CW NMS -CRAFT TERMINAL-HARDWARE 1.000 EA
70 2.CX EQUIPMENT CABINETS-FOR SDH EQUIPMENTS 1.000 EA
71 2.CY STM-16 OLIC TO SUPPORT 150 KMS 2.000 EA
72 2.CZ SERVICE:FODP: INDOOR TYPE 2: 96 F 1.000 EA
73 2.DA SERVICE:APPROACH CABLING: 24 FIBRE (KM) 1.000 KM
74 2.DB GIGABIT ETHERNET LAYER 2 INTERFACE-2 NO 1.000 SET
75 2.DC E1 INTERFACE (MIN 16 NOS.) 2.000 SET
76 2.DD STM-16 OLIC TO SUPPORT 225 KMS 2.000 EA
77 2.DE BASE EQUIPMENT STM-16 MADM UPTO 5 MSP 1.000 EA
78 2.DF 28MM DIA FOUNDATION BOLT - ERECTION 452.000 EA
CONSULTANCY SERVICE TO N.C.RAILWAY ON COST PLUS BASIS
PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID. 1
TRANSMISSION LINES
2.0 Bareilly 400/220 KV (Extn) S/S (UPPCL)
2.0 KARCHAM WANGTOO GEN SWITCHYARD (Extn) (JHPL)
Client Cost Estimate prepared by:
N.C.RAILWAY POWER GRID CORPORATION OF INDIA LTD.
(A. Govt. of India Enterprise)
SINGLE LINE DIAGRAM
TRANS. SYSTEM STRENGTHENING IN BIHAR SYSTEM -SCHEMATIC DIAGRAM
ANNEXURE - 1.0a
ABSTRACT COST ESTIMATE
PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID.
(FOR COMPLETED COST)
(Rupees in Crores)
Sr. DESCRIPTION TOTAL
A Preliminary Survey & Soil Investigation (Annex.- 1.1) 0.00 #REF! 1.24
B Land acquisition for S/Stn and R&R Compensation (Annex. - 1.1) 0.00 #REF!
Cost of compensation for Trans. Lines (Annex. - 1.1)
i) Compensation towards Crop & PTCC 0.00
ii) Compensation towards forest 0.00
D Civil Works (Annex. 1.1)
i) Infrastructure for substations 0.25 #REF!
ii) Non Residential Buildings 0.00 #REF!
iii) Colony for Trans. Lines and S/stn 0.00 #REF!
E Equipment (Supply & Erection) Cost
a) Trans.Lines (Annex.-1.2) 0.00 #REF!
b) Sub-Stations (Annex.-1.3) 8.94 #REF!
F Sub Total A to E 9.19 #REF!
G Administrative Expenses @ 2% of F 0.00
H Misc. Tools & Plants @ 1% of F
I Losses on Stock @ 0.25% of F
J Project Management Charges by Implementing agency (Incl applicable Service Tax) @ 11.03% of F 0.00 #REF!
D Contingencies 3% of C
K Customs duty (plus handling charges @2%)
E TOTAL COST EXCL. CONSULTANCY FEES #REF! #REF!
F POWERGRID CONSULTANCY FEES PLUS SERVICE TAX THEREON 0.00 #REF! 0.00
O TOTAL PROJECT COST INCL CONSULTANCY FEES 0.00 0.00 0.00
P Interest During Construction(IDC) 199.90 #REF!
GRAND TOTAL INCL. IDC 199.90 #REF!
Note: 1. The project is proposed to be funded by 90 % DoNER / GOI Grant & 10% Loan. Loan has been assumed to be available from Domestic sources. 26.16
2.Interest rate on Debt has been considered @10.5% p.a. for Domestic loan. Equity component is through grant.
3. Debt:Equity/Grant ratio has been considered as 10:90
ABSTRACT COST ESTIMATE
PRELIMINARY & GENERAL CIVIL WORKS
PROJ: PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID.
Sr. Survey & Crop & Forest Colony Total
No. Transmission Line Soil Invest PTCC Compens.
Works Compen. (incl. NPV) Cost
Sr. Prelim. Land Cost & Development cost* R & R Infra- Non Colony Total
Sub station Survey & and other compensation* Structure Residential
No. Soil Invest. Buildings Cost
1.0 Extension of 33 KV Substations 10.00 10.00
* Note: The Cost of compensatory afforestation and colony is for the three regions through which the line is traversing
* New Control Room Building to be constructed at Balia S/S
*Note: As per site information additional land of about 5.7 acres is being aquired for 400KV Byrnihat S/S.
NOTE : Infrastructure : Levelling/Site surfacing, Boundary wall & fencing, Approach roads & Internal roads, Internal & peripheral drainage, Bridges & Culverts, etc.
Non- Residential Buildings: Control Room Building, Administrative /office building/ Fire fighting pump house, DG Set building, etc.
Forest Compensation : Cost of compensatory afforestation on doubly degraded forest & NPV of forest area diverted
ANNEXURE - 1.1.1
DETAILS OF PRELIMINARY WORKS
FOR TRANSMISSION LINES
LINE RATE PER TOTAL AMOUNT
(Km.) (Rupees) (Rs. Lakhs)
Preliminary survey & soil investigation for :
Using Modern Survey Techniques
ANNEXURE - 1.1.2
LAND & COMPENSATION
LINE RATE PER AMOUNT
LENGTH KM. (Rs. Lakhs)
1 11 KV HT LINES
A. Cost of Crop & PTCC compensation 1200KV s/c 765 KVs/c 400 KV D/C 400 KV S/C 220 KV D/C 132 KV D/C 66 KV D/C 11 KV D/C 33 KV D/C
i) Cost of Crop compensation excl. forest stretch 5.86 0 0.00 10.00 6.40 4.60 5.20 3.50 2.70 1.80 0.70 1.50
ii) Cost of PTCC compensation 6.00 0 0.00 100 64 46 52 35 27 18 7 15
iii) Site inspection fee for Electrical Inspector of CEA (Lumpsum)
Total Cost of Crop & PTCC compensation 0.00
B. Cost of forest compensatin Forest area in Ha Rate per Ha
i) Cost of compensatory afforestation on doubly degraded forest 2.00 45,000 0.90 199.18 ROW - 46 M
ii) NPV for forest area diverted 1.00 1,043,000 10.43
Cost of Compensation towards Forest 0.14 Km 11.33
2 33 KV HT LINES
A. Cost of Crop & PTCC compensation 1200KV s/c 765 KVs/c 400 KV D/C 400 KV S/C 220 KV D/C 132 KV D/C
i) Cost of Crop compensation excl. forest stretch 22.93 0 0.00 10.00 6.40 4.60 5.20 3.50 2.70
ii) Cost of PTCC compensation 23.00 0 0.00 100 64 46 52 35 27
iii) Site inspection fee for Electrical Inspector of CEA (Lumpsum)
Total Cost of Crop & PTCC compensation 0.00
B. Cost of forest compensatin Forest area in Ha Rate per Ha
i) Cost of compensatory afforestation on doubly degraded forest 2.00 45,000 0.90 199.18 ROW - 46 M
ii) NPV for forest area diverted 1.00 1,043,000 10.43
Cost of Compensation towards Forest 0.07 Km 11.33
Total Cost of Compensation towards Crop & PTCC 0.00 TOTAL KM TOTAL Ha #REF!
Total cost of Compensatory Afforestation 22.66 0.21 2.00 #REF!
*Note: 1. A total of 2Ha (0.21Km) forest stretch (Including Reserve, Social, Vegetable and Protected Forest & Road and canal crossings)
covered under Supreme Court ruling of 1996(Forest like area irrespective of ownership) is likely to be encountered in the proposed transmission project. As per the recent Supreme Court Ruling dated 28.03.2008 & 09.05.2008, User agency in addition to cost of Compensatory Afforestation (CA) has to pay now cost of Forest land based on Net Present Value (NPV) ranging from Rs. 4.38 Lakhs to Rs.10.43 Lakhs per Ha. depending upon the type of forest land diverted. However, most of the state govt.(Forest deptt.)are charging the maximum amount of Rs.10.43 Lakhs per Ha. therefore the same has been considered as cost of NPV. Total forest (Km) in Ha
Crop & PTCC compensation is considered for line length excluding forest stretch.
ANNEXURE - 1.1.3
DETAILS OF CIVIL WORKS PROPOSED AT 400/220 KV SUBSTATION (GIS) AT BYRNIHAT
SL. DESCRIPTION NOS. AREA RATE AMOUNT
NO. (SQ.M.) PER (RS.LAKHS)
SQ.M.(Rs.) (Rounded off)
PRELIMINARY WORKS
1. Survey & Soil investigation * L.S. 5.00
PRELIMINARY WORKS (incl. service tax) 5.00
INFRASTRUCTURE FOR SUBSTATION
1. Levelling / Site Surfacing * L.S. 150.00
2. Boundary wall & fencing * L.S. 100.00
3. Approach roads, internal roads & drainage and Misc civil works* L.S.
4. Water Supply L.S.
5. Power supply L.S.
6. Rain Water Harvesting L.S. - -
* Note: As per information from site
TOTAL - INFRASTRUCTURE 250.00
TOTAL - INFRASTRUCTURE (including Service tax) 250.00
NON - RESIDENTIAL BUILDINGS
1.0 Transformer foundation & Rail track 2 incl. In S/S Civil Works
2.0 Control Room Building incl. 1 700 15000 20000.00
Administrative / office building
2.0 GIS Building including EOT Crane NIT Mbagh
3.0 Fire fighting pump house & Water Tank L.S. 25.00
TOTAL - NON-RESIDENTIAL BUILDINGS 130.87
TOTAL - NON-RESIDENTIAL BUILDINGS (incl. Service Tax) ~ 131.00
TOTAL - COLONY (12% INCREASED DUE TO HILLY TERRAIN) 146.72
ANNEXURE - 1.1.4
LAND & COMPENSATION COST PROPOSED AT NEW SUBSTATIONS
APPROX. RATE PER COST OF PTCC, AMOUNT
AREA ACRE AFFORESTATION (RS. LAKHS)
(ACRES) (Rs. Lakhs) (Rs. Lakhs)
LAND & COMPENSATION COST PROPOSED AT NEW SUBSTATIONS
APPROX. RATE PER R&R AMOUNT
AREA Acre AND (RS. LAKHS)
(Acre) (Rs. Lakhs) (Rs. Lakhs) 26.67
1.0 Land Cost for 400/220 kV Byrnihat S/S 5.70 26.32 150.00 26.32
Provision for R&R / IGS at 400/220 KV S/S at Byrnihat * 70.00 70.00
Trees & Crop Compensation* 80.00 80.00
Total Land & Compensation cost for New 400KV S/S at Byrnihat 300.00
* Based on information from site.
ANNEXURE - 1.1.3
DETAILS OF RESIDENTIAL COLONY PROPOSED
FOR GAYA - BALIA 765 S/C (235KM) &
MAITHON - GAYA 400KV D/C QUAD LINE (235KM) TRASMISSION LINES EACH
DESCRIPTION NOS. AREA AMOUNT
(SQ.M.) (RS.LAKHS)
NO. OF RESIDENTIAL QUARTERS
Executives (Engineer) 1
Non - executives 3
(Supervisor/Technicians/Operators)
Total no. of Quarters 4
Cost of Residential Quarters (Type D) 0 176 0.00
Cost of Residential Quarters (Type C) 1 100 14.00
Cost of Residential Quarters (Type B) 3 70 26.00
Land & Land Development L.S. 5.00
Non-residential Buildings @ 35% 14.00
a) Office for O&M Staff 325
b) Transmission Line Store 150
Cost of Infrastructure @ 31% 17.00
(Roads @ 5%, Fencing & Boundary wall
@ 4%, Lawns, Gardens, Plantation @2%,
Water Supply @ 6%, Internal Sanitation
@ 6%, Internal Electrification @ 8%)
TOTAL - COLONY 76.00
TOTAL - COLONY (12% INCREASED DUE TO HILLY TERRAIN) 85.12
TOTAL UPDATED TO 4TH QR. 2002 PRICE LEVEL 0.00
The aforesaid quarters will be located at either end of the line and also at suitable
intermediate locations in order to ensure proper O & M.
ANNEXURE - 1.1.3
DETAILS OF RESIDENTIAL COLONY PROPOSED FOR 428.00
BALIA - LUCKNOW 765 KV S/C (316 KM), RANCHI - SIPAT 765 KV S/C CKT-I (457 KM)
& RANCHI - SIPAT 765 KV S/C CKT-II (457 KM),
TRASMISSION LINES EACH
DESCRIPTION NOS. AREA AMOUNT
(SQ.M.) (RS.LAKHS)
NO. OF RESIDENTIAL QUARTERS
Executives (Engineer) 1
Non - executives 4
(Supervisor/Technicians/Operators)
Total no. of Quarters 5
Cost of Residential Quarters (Type D) 0 176 0.00
Cost of Residential Quarters (Type C) 1 100 14.00
Cost of Residential Quarters (Type B) 4 70 35.00
Land & Land Development L.S. 5.00
Non-residential Buildings @ 35% 17.15
a) Office for O&M Staff 325
b) Transmission Line Store 150
Cost of Infrastructure @ 31% 21.00
(Roads @ 5%, Fencing & Boundary wall
@ 4%, Lawns, Gardens, Plantation @2%,
Water Supply @ 6%, Internal Sanitation
@ 6%, Internal Electrification @ 8%)
TOTAL - COLONY 92.15
Amount inclusive of Service Tax @12.24% ~ 92.00
TOTAL - COLONY (12% INCREASED DUE TO HILLY TERRAIN) 103.04
TOTAL UPDATED TO 4TH QR. 2002 PRICE LEVEL 0.00
The aforesaid quarters will be located at either end of the line and also at suitable
intermediate locations in order to ensure proper O & M.
DETAILS OF RESIDENTIAL COLONY PROPOSED
FOR AGRA - GURGAON (220 KM) & NORTH KARANPURA - SASARAM
(PART I WZ 2 PORTION & PART II WZ 4 PORTION i.e. 175+ 49 Km) TRASMISSION LINES EACH
DESCRIPTION NOS. AREA AMOUNT
(SQ.M.) (RS.LAKHS)
NO. OF RESIDENTIAL QUARTERS
Executives (Engineer) 0
Non - executives 2
(Supervisor/Technicians/Operators)
Total no. of Quarters 2
Cost of Residential Quarters (Type D) 0 176 0.00
Cost of Residential Quarters (Type C) 0 100 0.00
Cost of Residential Quarters (Type B) 2 70 18.00
Land & Land Development L.S. 2.00
Non-residential Buildings @ 35% 6.30
a) Office for O&M Staff 325
b) Transmission Line Store 150
Cost of Infrastructure @ 31% 8.00
(Roads @ 5%, Fencing & Boundary wall
@ 4%, Lawns, Gardens, Plantation @2%,
Water Supply @ 6%, Internal Sanitation
@ 6%, Internal Electrification @ 8%)
TOTAL - COLONY 34.30
Amount inclusive of Service Tax @12.24% ~ 38.00
TOTAL - COLONY (12% INCREASED DUE TO HILLY TERRAIN) 42.56
TOTAL UPDATED TO 4TH QR. 2002 PRICE LEVEL 0.00
The aforesaid quarters will be located at either end of the line and also at suitable
intermediate locations in order to ensure proper O & M.
ANNEXURE - 1.1.3
DETAILS OF RESIDENTIAL COLONY
PROPOSED AT 400/132 KV NEW SUBSTATION AT SILCHAR
SL. DESCRIPTION NOS. AREA AMOUNT
NO. (SQ.M.) (RS.LAKHS)
1. Residential Quarters :
c) Type D with Servant quarters & garage 1 176.00 24.00
2. Nursery School @ Rs.12500 / Sq.m. 0 250.00 0.00
3. Dispensary / First Aid Centre @ Rs.12500 / Sq.m. 1 70.00 9.00
4. Community Centre @ Rs.12500 / Sq.m. 1 300.00 38.00
5. Guest House & Transit Camp @ Rs.13500 / Sq.m. 1 600.00 81.00
6. Co-operative Store @ Rs.10000 / Sq.m. 1 50.00 5.00
7. Cost of Infrastructure @ 31% 119.00
(Roads @ 5%, Fencing & Boundary wall
@ 4%, Lawns, Gardens, Plantation @2%,
Water Supply @ 6%, Internal Sanitation
@ 6%, Internal Electrification @ 8%)
TOTAL - RESIDENTIAL COLONY 503.00
ANNEXURE - 1.1.3
DETAILS OF CIVIL WORKS PROPOSED AT 400/132 KV NEW SUBSTATION
SL. DESCRIPTION NOS. AREA RATE AMOUNT
NO. (SQ.M.) PER (RS.LAKHS)
SQ.M.(Rs.) (Rounded off)
PRELIMINARY WORKS
1. Survey & Soil investigation * L.S. 10.00
PRELIMINARY WORKS (incl. service tax) 10.00
INFRASTRUCTURE FOR SUBSTATION
1. Levelling / Site Surfacing * L.S. 325.00
2. Boundary wall & fencing * L.S. 150.00
3. Approach roads, internal roads & drainage L.S. 135.00
4. Water Supply L.S. 20.00
5. Power supply L.S. 65.00
6. Rain Water Harvesting L.S. - - 5.00
TOTAL - INFRASTRUCTURE 700.00
TOTAL - INFRASTRUCTURE (including Service tax) 700.00
NON - RESIDENTIAL BUILDINGS
1.0 Transformer foundation & Rail track 2 incl. In Civil Works
2.0 Control Room Building incl. 1 1000 15000 150.00
Administrative / office building
3.0 GIS Building including EOT Crane NIT Mbagh
3.0 Fire fighting pump house L.S. 30.00
TOTAL - NON-RESIDENTIAL BUILDINGS 180.00
TOTAL - NON-RESIDENTIAL BUILDINGS (incl. Service Tax) ~ 180.00
TOTAL - COLONY (12% INCREASED DUE TO HILLY TERRAIN) 201.60
ANNEXURE - 1.1.3
DETAILS OF RESIDENTIAL COLONY
PROPOSED AT 220/132 KV NEW SUBSTATION AT MARIANI & MOKOCHUNG(GIS)
SL. DESCRIPTION NOS. AREA AMOUNT
NO. (SQ.M.) (RS.LAKHS)
1. Residential Quarters :
c) Type D with Servant quarters & garage 1 176.00 24.00 1 0
2. Nursery School @ Rs.12500 / Sq.m. 0 250.00 0.00
3. Dispensary / First Aid Centre @ Rs.12500 / Sq.m. 1 50.00 6.00
4. Community Centre @ Rs.12500 / Sq.m. 1 300.00 38.00
5. Guest House & Transit Camp @ Rs.13500 / Sq.m. 1 600.00 81.00
6. Co-operative Store @ Rs.10000 / Sq.m. 1 50.00 5.00
7. Cost of Infrastructure @ 31% 118.00
(Roads @ 5%, Fencing & Boundary wall
@ 4%, Lawns, Gardens, Plantation @2%,
Water Supply @ 6%, Internal Sanitation
@ 6%, Internal Electrification @ 8%)
TOTAL - RESIDENTIAL COLONY 499.00
ANNEXURE - 1.1.3
DETAILS OF CIVIL WORKS PROPOSED AT 220/132 KV NEW SUBSTATION AT MARIANI
SL. DESCRIPTION NOS. AREA RATE AMOUNT
NO. (SQ.M.) PER (RS.LAKHS)
SQ.M.(Rs.) (Rounded off)
PRELIMINARY WORKS
1. Survey & Soil investigation * L.S. 5.00
PRELIMINARY WORKS (incl. service tax) 5.00
INFRASTRUCTURE FOR SUBSTATION
1. Levelling / Site Surfacing * L.S. 150.00
2. Boundary wall & fencing * L.S. 50.00
3. Approach roads, internal roads & drainage L.S. 65.00
4. Water Supply L.S. 10.00
5. Power supply L.S. 15.00
6. Rain Water Harvesting L.S. - - 5.00
TOTAL - INFRASTRUCTURE 295.00
TOTAL - INFRASTRUCTURE (including Service tax) 295.00
NON - RESIDENTIAL BUILDINGS
1.0 Transformer foundation & Rail track 2 incl. In S/S Civil Works
2.0 Control Room Building incl. 1 700 15000 100.00 20000.00
Administrative / office building
3.0 GIS Building including EOT Crane NIT Mbagh
3.0 Fire fighting pump house L.S. 20.00
TOTAL - NON-RESIDENTIAL BUILDINGS 120.00
TOTAL - NON-RESIDENTIAL BUILDINGS (incl. Service Tax) ~ 120.00
TOTAL - COLONY (12% INCREASED DUE TO HILLY TERRAIN) 134.40
* Based on actual orders placed by site.
provided at Balia & Bhiwadi S/Stns. under separate schemes.
ANNEXURE - 1.1.3
DETAILS OF CIVIL WORKS PROPOSED FOR 220/132KV NEW GIS SUBSTATION AT MOKOCHUNG
SL. DESCRIPTION NOS. AREA RATE AMOUNT
NO. (SQ.M.) PER (RS.LAKHS)
SQ.M.(Rs.) (Rounded off)
PRELIMINARY WORKS
1. Survey & Soil investigation * L.S. 10.00 2.76
PRELIMINARY WORKS 10.00
INFRASTRUCTURE FOR SUBSTATION
1. Levelling / Site Surfacing * L.S. 100.00
2. Boundary wall / Fencing L.S. 50.00
3. Roads & Drainage L.S. 50.00
4. Water Supply L.S. 10.00
5. Power Supply L.S. 15.00
6. Rain Water Harvesting L.S. 5.00
TOTAL - INFRASTRUCTURE 230.00
TOTAL - INFRASTRUCTURE 230.00
NON - RESIDENTIAL BUILDINGS
1. Transformer foundation & Rail track - - Included in S/S civil works
2. Control Room Building 1.00 500 12000 60.00
3 GIS Building NIT Mbagh
For 400 KV ( including EOT Crane) 0 550.00 16000 0.00
4 Fire fighting pump house & Water Tank L.S. 35.00
5 Rain Water Harvesting System LS
TOTAL - NON-RESIDENTIAL BUILDINGS 175.00
ANNEXURE - 1.1.3
DETAILS OF RESIDENTIAL COLONY
PROPOSED AT 132/33 KV NEW SUBSTATIONS AT
ROING, TEZU & NAMSAI
SL. DESCRIPTION NOS. AREA AMOUNT
NO. (SQ.M.) (RS.LAKHS)
1. Residential Quarters :
c) Type D with Servant quarters & garage 0 176.00 0.00 1 0
2. Nursery School @ Rs.12500 / Sq.m. 0 250.00 0.00
3. Dispensary / First Aid Centre @ Rs.12500 / Sq.m. 1 50.00 6.00
4. Community Centre @ Rs.12500 / Sq.m. 1 300.00 38.00
5. Guest House & Transit Camp @ Rs.13500 / Sq.m. 1 600.00 81.00
6. Co-operative Store @ Rs.10000 / Sq.m. 1 50.00 5.00
7. Cost of Infrastructure @ 31% 89.00
(Roads @ 5%, Fencing & Boundary wall
@ 4%, Lawns, Gardens, Plantation @2%,
Water Supply @ 6%, Internal Sanitation
@ 6%, Internal Electrification @ 8%)
TOTAL - RESIDENTIAL COLONY 377.00
ANNEXURE - 1.1.3
DETAILS OF CIVIL WORKS PROPOSED AT 132/33 KV NEW SUBSTATION AT
ROING, TEZU & NAMSAI
SL. DESCRIPTION NOS. AREA RATE AMOUNT
NO. (SQ.M.) PER (RS.LAKHS)
SQ.M.(Rs.) (Rounded off)
PRELIMINARY WORKS
1. Survey & Soil investigation * L.S. 5.00
PRELIMINARY WORKS (incl. service tax) 5.00
INFRASTRUCTURE FOR SUBSTATION
1. Levelling / Site Surfacing * L.S. 80.00 66.00
2. Boundary wall & fencing * L.S. 50.00
3. Approach roads, internal roads & drainage L.S. 35.00
4. Water Supply L.S. 5.00
5. Power supply L.S. 10.00
6. Rain Water Harvesting L.S. - - 5.00
TOTAL - INFRASTRUCTURE 185.00
TOTAL - INFRASTRUCTURE (including Service tax) 185.00
NON - RESIDENTIAL BUILDINGS
1.0 Transformer foundation & Rail track 2 incl. In S/S Civil Works
2.0 Control Room Building incl. 1 500 12000 60.00
Administrative / office building
3.0 GIS Building including EOT Crane NIT Mbagh
3.0 Fire fighting pump house L.S. 20.00
TOTAL - NON-RESIDENTIAL BUILDINGS 80.00
TOTAL - NON-RESIDENTIAL BUILDINGS (incl. Service Tax) ~ 80.00
TOTAL - COLONY (12% INCREASED DUE TO HILLY TERRAIN) 89.60
ANNEXURE - 1.1.3
DETAILS OF RESIDENTIAL COLONY
PROPOSED AT 132/33 KV NEW SUBSTATIONS AT MELRIAT (GIS),
AND IMPHAL BOTH UPGRADABLE TO 400KV
SL. DESCRIPTION NOS. AREA AMOUNT
NO. (SQ.M.) (RS.LAKHS)
1. Residential Quarters :
c) Type D with Servant quarters & garage 1 176.00 24.00 1 0
2. Nursery School @ Rs.12500 / Sq.m. 0 250.00 0.00
3. Dispensary / First Aid Centre @ Rs.12500 / Sq.m. 1 50.00 6.00
4. Community Centre @ Rs.12500 / Sq.m. 1 300.00 38.00
5. Guest House & Transit Camp @ Rs.13500 / Sq.m. 1 600.00 81.00
6. Co-operative Store @ Rs.10000 / Sq.m. 1 50.00 5.00
7. Cost of Infrastructure @ 31% 118.00
(Roads @ 5%, Fencing & Boundary wall
@ 4%, Lawns, Gardens, Plantation @2%,
Water Supply @ 6%, Internal Sanitation
@ 6%, Internal Electrification @ 8%)
TOTAL - RESIDENTIAL COLONY 499.00
provided at Balia & Bhiwadi S/Stns. under separate schemes.
ANNEXURE - 1.1.3
DETAILS OF CIVIL WORKS PROPOSED FOR 132/33KV NEW GIS SUBSTATION AT MELRIAT
SL. DESCRIPTION NOS. AREA RATE AMOUNT
NO. (SQ.M.) PER (RS.LAKHS)
SQ.M.(Rs.) (Rounded off)
PRELIMINARY WORKS
1. Survey & Soil investigation * L.S. 5.00 2.76
PRELIMINARY WORKS 5.00
INFRASTRUCTURE FOR SUBSTATION
1. Levelling / Site Surfacing * L.S. 100.00
2. Boundary wall / Fencing L.S. 150.00
3. Roads & Drainage L.S. 65.00
4. Water Supply L.S. 10.00
5. Power Supply L.S. 15.00
6. Rain Water Harvesting L.S. 5.00
TOTAL - INFRASTRUCTURE 345.00
TOTAL - INFRASTRUCTURE 345.00
NON - RESIDENTIAL BUILDINGS
1. Transformer foundation & Rail track - - Included in S/S civil works
2. Control Room Building 1.00 500 12000 60.00
3 GIS Building NIT Mbagh
For 400 KV ( including EOT Crane) 0 550.00 16000 0.00
4 Fire fighting pump house & Water Tank L.S. 30.00
5 Rain Water Harvesting System LS
TOTAL - NON-RESIDENTIAL BUILDINGS 138.00
ANNEXURE - 1.1.3
DETAILS OF CIVIL WORKS PROPOSED AT 132/33 KV NEW SUBSTATION AT
IMPHAL UPGRADABLE TO 400KV
SL. DESCRIPTION NOS. AREA RATE AMOUNT
NO. (SQ.M.) PER (RS.LAKHS)
SQ.M.(Rs.) (Rounded off)
PRELIMINARY WORKS
1. Survey & Soil investigation * L.S. 10.00
PRELIMINARY WORKS (incl. service tax) 10.00
INFRASTRUCTURE FOR SUBSTATION
1. Levelling / Site Surfacing * L.S. 150.00 250.00
2. Boundary wall & fencing * L.S. 100.00 150.00
3. Approach roads, internal roads & drainage L.S. 50.00 135.00
4. Water Supply L.S. 10.00 20.00
5. Power supply L.S. 20.00 65.00
6. Rain Water Harvesting L.S. - - 5.00 5.00
TOTAL - INFRASTRUCTURE 335.00
TOTAL - INFRASTRUCTURE (including Service tax) 335.00
NON - RESIDENTIAL BUILDINGS
1.0 Transformer foundation & Rail track 2 incl. In S/S Civil Works
2.0 Control Room Building incl. 1 700 15000 150.00
Administrative / office building
3.0 GIS Building including EOT Crane NIT Mbagh
3.0 Fire fighting pump house L.S. 30.00
TOTAL - NON-RESIDENTIAL BUILDINGS 180.00
TOTAL - NON-RESIDENTIAL BUILDINGS (incl. Service Tax) ~ 180.00
TOTAL - COLONY (12% INCREASED DUE TO HILLY TERRAIN) 201.60
ANNEXURE - 1.1.4
LAND & COMPENSATION COST PROPOSED AT NEW SUBSTATIONS
APPROX. RATE PER COST OF PTCC, AMOUNT
AREA ACRE AFFORESTATION (RS. LAKHS)
(ACRES) (Rs. Lakhs) (Rs. Lakhs)
LAND & COMPENSATION COST PROPOSED AT NEW SUBSTATIONS
APPROX. RATE PER R&R AMOUNT
AREA Acre AND (RS. LAKHS)
(Acre) (Rs. Lakhs) (Rs. Lakhs) 26.67
Provision for R&R / IGS at New 400/132 KV S/S at Silchar 50.00 50.00
Total Land & Compensation cost for New 400/132 KV S/S at Silchar 108.00
2.0 New 220 KV Switching Station at Mariani 20.00 9.00 180.00 490000.00
Provision for R&R / IGS at New 220 KV Switching Station at Mariani 100.00 100.00
Total Land & Compensation cost forNew 220 KV Switching Station at Mariani 280.00
3.0 New 220/132 KV S/S at Mokochung 20.00 2.50 50.00
Provision for R&R / IGS at New 220/132 KV S/S at Mokochung 50.00 50.00 845000.00Sq.m 208.80
Total Land & Compensation cost for New 220/132 KV S/S at Mokochung 100.00
4.0 New 132/33 KV S/S at Melriat (upgradable to 400KV) 40.00 8.75 350.00
Provision for R&R / IGS at New 132/33 KV S/S at Melriat(upgradable to 400KV) 100.00 100.00 845000.00Sq.m 208.80
Total Land & Compensation cost for New 132/33 KV S/S at Melriat(upgradable to 400KV) 450.00
5.0 New 132/33 KV S/S at Imphal (upgradable to 400KV) 30.00 5.07 152.00
Provision for R&R / IGS at New 132/33 KV S/S at Imphal(upgradable to 400KV) 100.00 100.00 845000.00Sq.m 208.80
Total Land & Compensation cost for New 132/33 KV S/S at Imphal(upgradable to 400KV) 252.00
6.0 New 132/33 KV S/S at Roing 20.00 2.90 58.00 based on site IOM dt.21.01.2003 560000.00
Provision for R&R / IGS at New 132/33 KV S/S at Roing 25.00 25.00
Total Land & Compensation cost for New 132/33 KV S/S at Roing 83.00
7.0 New 132/33 KV S/S at Tezu 20.00 3.15 63.00 based on site IOM dt.21.01.2003 560000.00
Provision for R&R / IGS at New 132/33 KV S/S at Tezu 25.00 25.00
Total Land & Compensation cost for New 132/33 KV S/S at Tezu 88.00
8.0 New 132/33 KV S/S at Namsai 20.00 2.20 44.00 based on site IOM dt.21.01.2003
Provision for R&R / IGS at New 132/33 KV S/S at Namsai 25.00 25.00
Total Land & Compensation cost for New 132/33 KV S/S at Namsai 69.00
**As the proposed land for substation is owned by HUDA, Cost of Compensation for R&R is not applicable
* Based on actual orders placed by site.
LAND & COMPENSATION COST PROPOSED AT NEW SUBSTATIONS
APPROX. RATE PER COST OF PTCC, AMOUNT
AREA ACRE AFFORESTATION (RS. LAKHS)
(ACRES) (Rs. Lakhs) (Rs. Lakhs)
LAND & COMPENSATION COST PROPOSED AT EXTN SUBSTATION
APPROX. RATE PER R&R AMOUNT
AREA Ha AND (RS. LAKHS)
(HA) (Rs. Lakhs) (Rs. Lakhs) 26.67
Extn of 765/400 KV S/S at SASARAM #REF! (i.e. 60 Acres) 3.70 #REF! based on site IOM dt.16.03.06 #REF!
Provision for R&R / IGS at SASARAM S/S 60.00 60.00
Total Land & Compensation cost for SASARAM EXTN S/S #REF!
**As the proposed land for substation is owned by HUDA, Cost of Compensation for R&R is not applicable
ANNEXURE - 1.1.5
DETAILS OF CIVIL WORKS PROPOSED AT EXISTING SUBSTATIONS
INFRASTRUCTURE FOR SUBSTATION
Misc. Infrastructure works e.g., Dismantling, site surfacing and Levelling, modification of existing Fencing/Boundary wall,
modification of existing Roads & Drains, etc. are being proposed for the following Substations
where bay extension works are to be carried out :
#REF! Rs.20.00 LAKHS
#REF! Rs.10.00 LAKHS
#REF! Rs.10.00 LAKHS
#REF! Rs.10.00 LAKHS
#REF! Rs.10.00 LAKHS
#REF! Rs.10.00 LAKHS
#REF! Rs.10.00 LAKHS
#REF! Rs.10.00 LAKHS
Total Rs.90.00 LAKHS
New 765/400 KV S/S at Fatehpur 108 Rs 1.72556 lakhs per acre for Govt land & Rs. 2.97427 lakhs per acre for Pvt. Land 281.56 based on site IOM dt.21.01.2003
Provision for R&R / IGS at New 765/400 KV S/S at Fatehpur (76.64 acres Pvt land& 31.07 acres Govt land)
COST BREAK UP OF TRANSMISSION LINE
ANNEXURE - 1.1.1
PROJ: PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID.
TRANSMISSION LINE : 132 KV CABLE WORKS FOR CHENENI -SRINAGAR TRANSMISSION LINE THROUGH JAWAHAR TUNNEL 132 KV CABLE WORKS FOR CHENENI -SRINAGAR TRANSMISSION LINE THROUGH JAWAHAR TUNNEL (Rs. in Lakhs)
Line Length : 12.00 Km. Wind Zone 4: 47m/s
Total F&I & Ere/Civil Total
Sr. Description Unit Qty. Rate Total Spares Exw & CST Works
No. incl. E.D. Spares
1 Route survey of cable Km 6.8 0.10 0.67 0.67 1.34504 Latest average
2 Supply and laying of 132 KV grade,Compacted circular annealed plain copper conductor,XLPE cable 1 core,630 sq mm through existing trough under the bridge and cable trench on both side.(Trough length-5.6 KM, Cable trench length 1.4 Km) Km 28 56.29 1576.09 0.00 1,576.09 117.39 718.69 2,412.17 budgetary quotation from UNIVERSAL CABLES
3 Supply and installation of Pre moulded straight through joint suitable for above cable No 56 6.86 384.3 0.00 384.30 15.37 29.12 428.79
4 Porcelain outdoor termination for above cable NO 8 7.89 63.12 0.00 63.12 2.52 3.66 69.30
5 Supply and erection of Single phase earth link box no 8 0.57 4.59 4.59 0.18 0.55 5.32
6 Supply and erection of Galvanised steel structure for vertical drop No 2 5.16 10.31 10.31 0.41 6.07 16.79
7 Supply and erection of Galvanised steel structure for End termination No 8 1.00 8.04 8.04 0.32 4.12 12.48
8 Supply and erection of 120 KV lightning arrestor with mounting structure and surge monitors No 6 2.01 12.08 0.00 12.08 0.48 3.15 15.71
9 Supply and erection of critical installation materials like rubber cushions,vibration dampers, support brackets,rubber binder etc for fixing of cable to be used (wherever required) for dressing of 7 route km of cable L.S L.S 185.69 185.69
10 Soil investigation on both sides of the bridge where cable trench is to be constructed LS L.S 0.00 0.00 0.00
11 Sand filling of cable trench Cum 800 0.00067 0.54 0.54
12 Construction of buried cable trench on both side of the bridge Km 1.2 33.91 40.69 40.69 DRDO
13 Acquisition of land for cable trench on both side of the road if required Sq m 3500( 1400 m X 2.5 m),Cost of land to be given by site 0.00 DRDO
13 Fencing of termination yard on one side of the bridge with chain link fencing & barbed wire on top m 70 0.02 1.45 1.45 DRDO
15 Shifting and Relocationof P& T Cable from the trough under the bridge including provision for necessary protection from Induced voltage(if any) Km 5.6 Km Cost to be furnished by site 0.00
14 Modification, Strengthening, Fabrication and Painting of hangers in the trough LS 0
15 Temporary road diversion for laying of cable on both side of the bridge (if any) Km 0.5 41.55 20.78 20.78 DRDO
16 Rectification work for the portion of existing road/ Highway due to road crossing of cable Cum 260 0.03 7.14 7.14 14.2844 Latest average
17 Rectification work of cable trays at Mahatma Gandhifor the portion of existing road/ Highway due to road crossing of cable
Note: 1) Spares may be kept as per norms
2) Copper conductor has been considered as desired by BSEB. Since copper is costly and theft prone, Site may discuss with BSEB if Al conductor can be used.
3) In the scope of work, seven cables has been indicated by BSEB. Site may get it clarified from BSEB why seven cables are required
4) Site to furnish the estimated cost wherever indicated
a) Danger Plate Nos. 131 0 0 0 #DIV/0! 0 #DIV/0! NIT Estimate
b) Number Plate Nos. 131 0 0 0 #DIV/0! 0 #DIV/0! 220kv line BCPP&BALCO
c) Phase Plate (set of three) Nos. 227 0 0 0 #DIV/0! 0 #DIV/0! NIT Estimate
d) Anti climbing device Nos. 652 0 0 0 #DIV/0! 0 #DIV/0! 220kv line BCPP&BALCO
e) Bird guard (set of three) Nos. 131 0 0 0 #DIV/0! 0 #DIV/0! NIT Estimate
f) Circuit Plate (set of two) Nos. 260 0 0 0 #DIV/0! 0 #DIV/0! 220kv line BCPP&BALCO
COST BREAK UP OF TRANSMISSION LINE Excise Duty 1.16
ANNEXURE - 1.2.1
PROJ: TRANSMISSION SYSTEM ASSOCIATED WITH
TEESTA BASIN PROJECTS IN SIKKIM
TRANSMISSION LINE : LOWER SUBANSIRI - BISWANATH CHARIYALI 400KV D/C Line -1 (ADB/WB FUNDING) (Rs. in Lakhs)
Line Length : 200 Km. Wind Zone 5: 50 m/s TERRAIN Plain Terrain
Eqpt Exworks incl. Excise Duty S P A R E S Entry
Sr. T O T A L F&I @12% & Tax @ Ere/Civil Service Tax T O T A L F&I @8%
No. Description Unit Quantity Rate (Rs.) Total Quantity Total Exw & Spares CST 0.0% Works @ 12.24% CST @4%
1.0 TOWER STEEL
1.1 High Tensile Steel MT 1,594 0 0.00 32 0.00 0.00 0.00 0.00 0.00 DADRI-BALLABGARH #DIV/0!
Hexagonal bolts & Nuts MT 378 0 0.00 8 0.00 0.00 0.00 0.00 0.00
Tower Accessories & Earthing LS 0.00 0.00 0.00 0.00 0.00 0.00
Proto Assembly charges for tower LS 22.85 0.00 22.85 0.00 22.85 4750.00
2.1 ACSR "MOOSE" K.M. 2,428 0 0.00 25 0.00 0.00 0.00 0.00 0.00 Latest average
2.2 AACSR "MOOSE" K.M. 9 0 0.00 1 0.00 0.00 0.00 0.00 0.00 Latest average
Type test charges for conductor LS 1.78 0.00 1.78 0.00 1.78 0.59
3.1 Earthwire (G.S. 7/3.66 mm) K.M. 405 0 0.00 5 0.00 0.00 0.00 0.00 0.00 Latest average
3.2 Earthwire ('AACSR ) K.M. 1.4 0 0.00 1 0.00 0.00 0.00 0.00 0.00 Latest average
Type test charges for earthwire LS 0.50 0.00 0.50 0.00 0.50
4.0 Insulator 2.5
4.1 Insulator (120 KN Standard) Nos. 65,513 0 0.00 656 0.00 0.00 0.00 0.00 0.00 Latest average
4.2 Insulator (160 KN Standard) Nos. 95,886 0 0.00 959 0.00 0.00 0.00 0.00 0.00 Latest average
4.3 Insulator (120 KN Antifog) Nos. 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
4.4 Insulator (160 KN Antifog) Nos. 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
Type test charges for insulator LS 26.34 0.00 26.34 0.00 26.34
5.0 Hardware Fitting
5.1 Single Suspension 'I' Fittings Set 2,437 0 0.00 25 0.00 0.00 0.00 0.00 0.00 Latest average
5.2 Single Suspension pilot Fittings Set 402 0 0.00 5 0.00 0.00 0.00 0.00 0.00 Latest average
5.3 Single Tension Fittings Set 9 0 0.00 1 0.00 0.00 0.00 0.00 0.00 Latest average
5.4 Double Tension Fittings Set 0 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
5.5 Double 'I' Suspension Fittings Set 2,037 0 0.00 21 0.00 0.00 0.00 0.00 0.00 Latest average
5.6 Double 'V' Suspension Fittings Set 13 0 0.00 1 0.00 0.00 0.00
5.7 Triple Tension Fittings Set 13 0 0.00 1 0.00 0.00 0.00 0.00 0.00 Latest average
5.8 Quad Tension Fittings Set 0 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
Type test charges for hardware fittings LS 1.86 0.00 1.86 0.00 1.86
6.1 Conductor & E'wire Accessories #REF!
6.1.1 MSCJ For Conductor Nos. 1,499 0 0.00 15 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.2 MSCJ For Earthwire Nos. 225 0 0.00 3 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.3 Repair Sleeve for Conductor Nos. 455 0 0.00 5 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.4 Flexible Copper Bond for earthwire Nos. 1,489 0 0.00 15 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.5 Vibration Damper For Conductor Nos. 17,841 0 0.00 179 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.6 Vibration Damper for Earthwire Nos. 2,978 0 0.00 30 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.7 Bundle Spacer for Conductor Nos. 24137 0 0.00 242 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.8 Rigid Spacer for Conductor Nos. 3018 0 0.00 31 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.9 Earthwire Tension Clamps Nos. 677 0 0.00 7 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.10 Earthwire Suspension Clamps Nos. 813 0 0.00 9 0.00 0.00 0.00 0.00 0.00 Latest average
6.1.11 T - Connector Nos. 65 0 0.00 1 0.00 0.00 0.00 0.00 0.00 Latest average
6.2 Conductor & E'wire Accessories(AACSR)
6.2.1 MSCJ For AACSR Conductor Nos. 6 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
6.2.2 MSCJ For AACSR Earthwire Nos. 1 1,108 0.01 0 0.00 0.01 0.00 0.00 0.01 Latest average
6.2.3 Repair Sleeves AACSR Conductor Nos. 2 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
6.2.4 Flexible Copper Bonds Nos. 0 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
6.2.5 Vibration Damper For AACSR Conductor Nos. 0 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
6.2.6 Vibration Damper AACSR Earthwire Nos. 12 538 0.06 0 0.00 0.06 0.01 0.00 0.07 Latest average
6.2.7 Bundle Spacer for Conductor Nos. 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
6.2.8 Rigid Spacer for jumpers Nos. 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
6.2.9 Earthwire Tension Clamps Nos. 8 1,559 0.12 0 0.00 0.12 0.02 0.00 0.14 Latest average
6.2.10 Earthwire Suspension Clamps Nos. 4 1,828 0.07 0 0.00 0.07 0.01 0.00 0.08 Latest average
6.2.11 T - Connector Nos. 0 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Latest average
Type test charges for C & E accessories LS 3.50 0.00 3.50 0.00 3.50
7.0 Tower Erection
I) Normal towers MT 10,714 7,981 855.08 0.00 855.08 Latest average
ii) River crossing towers MT 480 11,173 53.63 0.00 53.63 Latest average
8.0 Foundations
8.1 Excavations
Normal Dry soil Cu.M. 44,208 357 157.82 0.00 157.82 Latest average
Normal Wet soil Cu.M. 104,913 431 452.18 0.00 452.18 Latest average
Dry Fissured Rock Cu.M. 2,419 898 21.72 0.00 21.72 Latest average
Wet Fissured Rock Cu.M. 0 925 0.00 0.00 0.00 Latest average
Soft Rock Cu.M. 0 632 0.00 0.00 0.00 Latest average
Hard Rock Cu.M. 431 1,733 7.47 0.00 7.47 Latest average
8.2 Concreting 0.00 Latest average
Concreting 1:1.5:3(M20) Cu.M. 18,386 14,728 2707.89 0.00 2707.89 Latest average
Concreting 1:3:6 Cu.M. 2,101 12,782 268.55 0.00 268.55 Latest average
8.3 Reinforcement MT 1,465 98,782 1447.16 0.00 1447.16 Latest average
All kinds of soil except HR & FR Cu.M. 525 249 1.31 0.00 1.31 Latest average
Normal soil Cu.M. 0 249 0.00 0.00 0.00 Latest average
Fissured Rock Cu.M. 700 606 4.24 0.00 4.24 Latest average
Hard Soil Cu.M. 1,065 0.00 0.00 0.00 Latest average
Soft Rock Cu.M. 0 267 0.00 0.00 0.00 Latest average
Hard Rock Cu.M. 525 756 3.97 0.00 3.97 Latest average
I) Random Rubble Stone Cu.M. 1,000 9,410 94.10 0.00 94.10 Latest average
Masonary including excavation
ii) Stone bound in galvanised wire netting Cu.M. 0 3,825 0.00 0.00 0.00 Latest average
including excavation
iii) Backfilling and leveling of Cu.M. 250 238 0.60 0.00 0.60 Latest average
Volumes enclosed in revetment
iv) M-15(1:2:4) Concrete for top seal Cu.M. 20 14,191 2.84 0.00 2.84 Latest average
cover of revetment
11.0 Stringing Quad D/C (normal) K.M. 0.0 511,673 0.00 0.00 0.00 Latest average 0.760
Stringing D/C (normal) K.M. 196.3 414,342 813.35 0.00 813.35 Latest average
Stringing Quad D/C (River Crossing) K.M. 0.0 1,058,987 0.00 0.00 0.00 Latest average
Stringing D/C (River Crossing) K.M. 3.7 568,820 21.05 0.00 21.05
12.0 River crossing towers**
High Tensile Steel MT 344 0 0.00 7 0.00 0.00 0.00 0.00 0.00 DADRI-BALLABGARH #VALUE!
Hexagonal bolts & Nuts MT 20 0 0.00 0 0.00 0.00 0.00 0.00 0.00
Antitheft bolts & Nuts MT 2 0 0.00 0 0.00 0.00 0.00 0.00 0.00
i) Pile / well foundation LS ANNEXURE-1.2.1(a) 3210.29 0.00 3210.29 Latest average
ii) Open cast foundation
a) Excavation in Wet soil Cu.M. 431 0.00 0.00 Latest average
b) Concreting 1:1.5:3 (M20) Cu.M. 14,728 0.00 0.00 Latest average
Concreting 1:3:6 Cu.M. 12,782 0.00 0.00 Latest average
Reinforcement MT 98,782 0.00 0.00 Latest average
13.0 Aviation Signal
Painting of Normal towers above 45m Nos. 0 770,088 0.00 0.00 0.00 Latest average
Painting of River Xing towers above 45m Nos. 0 1,424,761 0.00 0.00 0.00 Latest average
Painting of Normal towers MT 270 17,413 47.02 0.00 47.02 Latest average
Obstruction lights Nos. 15 0 0.00 0.00 0.00 0.00 0.00 0.00 3.74 0.00 3.74 Latest average 24911.00
Supply & Placement of Span markers Nos. 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Latest average 12936.00
14.0 Supply , transportation and installation of wind speed measuring equipment Nos. 4 0 0.00 0 0.00 0.00 0.00 0 1.61 0.00 1.61 Latest average 40352.00
15.0 Detail Survey using modern survey techniques K.M. 200 26,705 * Included in Preliminary Survey & Soil Investigation kishenpur-wagoora
Detailed survey incl check survey KM 200 31,644 63.29 0.00 63.29
Check survey KM 0 21,270 0.00 0.00 0.00
16.0 Soil investigation in * Included in Preliminary Survey & Soil Investigation
All kinds of soil except HR &FR Loc. 47 19,964 Latest average
Sandy Soil Loc. 0 12,029 Latest average
Mixed Soil Loc. 0 12,029 Latest average
Normal soil Loc. 0 Latest average
clay soil Loc. 0 12,029 Latest average
Fissured rock Loc. 2 42,683 Latest average
Hard soil Loc. 0 8,263 Latest average
Soft rock Loc. 0 Latest average
Hard rock Loc. 1 25,923 Latest average
Furnishing bore log data Loc. 0 2,222 Latest average 3,326
River crossing Locations Loc. 30 113,407 Latest average
**NOTE: 4 Nos. of locs. for pile foundation are required for Narmada river crossing. 10296.04
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Excise Duty Component in above incl. CST = 2.28 #REF!
World Bank fundable portion = 7222.04 5233.14
11KV LT line DT Service Connection 11kV Re-Conductoring No. of Villages Blocks 33kV new line 11kV railway crossing 33kV reconductoring 33kV railway crossing No. of new S/S 1x5 MVA No. of new S/S 2x5 MVA augmnt add 1x5 new 33 kV line bay Un-electrified Village Line sectinaliser 33kV River crosing termination 11kV River crosing termination
Line on PSC pole Line on rail pole Branch 25KVA 16KVA
RS Joist RS Joist RS Joist RS Joist RS Joist
COST BREAK UP OF TRANSMISSION LINES AND SUBSTATIONS ANNEXURE - 1.2.1
ANNEXURE - 1.2 (A)
SUPPLY PORTION (Rs. in Lakhs)
PROJ: PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID.
Quantity Breakup
Sl. No. Description of Items Unit Quantity # Unit Rate incl Taxes & Duties (Rs.) Total Amount in Rupees Total Amount in Rupees Check Quantity 11kV Trunk 11kV Branch 11kV Spur LT Line DT 16kVA DT 25kVA Service Connections Recond 11kV Line New 33kV Line New 33/11 kV S/s (1x5 MVA) New 33/11 kV S/s (2x5 MVA) 33kV Bay Aug. Trans. Aug. Recond 33kV Line 18.18181818
Part-I For around 7MW flow taking dog conductor
I Materials for 11kV HT Lines as per TS. Total line length 6km ( Janinagar-Nepal border) considering 20 span for 11kv line
A ACSR conductor
2 Pole/Support Structure 0 0
3 M.S.Galvanised Items (for 11kV/LT line/DT erection/service connection) 0 0 0 0
3a Fabrication and Supply of M.S. Galvanised items- Pole Top Bracket, V-Cross arm, Gaurding cross arm, Back Clamps for V-Cross arm and Gaurd cross arm, D P Channel, D P Channel clamp, Stay clamps angle, Stay clamps side, D P cross bracing & clamps , clamps for strut/fly/bow type of guys, channel & clamps for supporting transformer, channel for supporting DO fuse, Line sectionaliser and LA , transformer belting and belting support, angle for LT distribution box,etc. complete as required. MT 4 90,618 362,474 398,469 7 6.8 0.0 0.0 0.0 0.0 0.0
3b Galvanised M.S. Fasteners of different type/Sizes as per requirement suitable for above 0 0 0 0
3b(ii) Washers (plain and spring) Kg 18 99 1,779 1,870 22 22.2 0.0 0.0 0.0 0.0 0.0
4 11kV Pin Insulators 0 0 0 0
4a Pins(5kN) with nuts and washers complete suitable for insulator assembly Set 360 112 40,393 24,673 378 378.0 0.0 0.0
4b Porcelain pin Insulator (300 mm min. creepage) Set 360 0 0 29,449 378 378.0 0.0 0.0
5 11kV Disc insulator assembly 0 0 0 0
5a 11kV, 45 kN Electro Mechanical Strength Disc insulator of 300 mm min. creepage distance Nos. 72 702 50,511 28,333 101 100.8 0.0 0.0
5a 11kV, 90 kN Electro Mechanical Strength Disc insulator of 300 mm min. creepage distance* Nos. 6 532 3,194 3,194 #VALUE! 64.8 #VALUE! 0.0
5b Hardware fittings suitable for the 45KN Insulator complete with cross arm strap, ball eye socket eye, strain clamp, cotter pin etc. Set 72 0 0 29,049 101 100.8 0.0 0.0
5c Hardware fittings suitable for the 90KN Insulator complete with cross arm strap, ball eye socket eye, strain clamp, cotter pin etc. Set 6 629 3,772 3,772 #VALUE! 64.8 #VALUE! 0.0
6 AL alloy Preformed insulator bindings for 11 kV pin insulator Set 360 0 0 13,531 378 378.0 0.0 0.0
7 11kV stay set assembly (excluding stay clamp & fasteners) 0 0 0 0
7b Guy Strain Insulators designation 'C' Set 24 32 762 1,061 132 132.0 0.0 0.0 0.0 0.0
7c Hardware Fittings (Anchor plate, Anchor rod, Turnbuckle, Thimbles, Guy grips, fastners to attatch Anchor Plate to Anchor Rod, etc) to complete 11 kV stay set Set 24 787 18,877 21,886 132 132.0 0.0 0.0 0.0 0.0
8 Earthing 0 0 0 0
a 20mm dia 2500 mm long GI Rod together with fixing arrangement(excluding GI wire required for earthing). Set 120 562 67,457 163,683 132 132.0 0.0 0.0 0.0
b 40mm dia, medium class, GI Pipe 2500mm long with fixing arrangement(for treated type earthing for DTs excluding GI wire required for earthing) Nos 0 0 0 0 0.0 0.0
9 Guarding, Lacing and earthing wire 0 0 0 0
9a 8 SWG GI wire for guarding & earthing kg 61 83 5,092 4,450 55 55.3 0.0 0.0 0.0 0.0 0.0
9b 10 SWG wire for lacings kg 15 83 1,252 1,094 13 13.4 0.0 0.0
II New LT line with Aerial Bunched Cable (1x16+25 sq. mm) as per TS 0 0 0 0
1 1 Phase LT Aerial Bunched Cable (1x16+25) sq.mm. Km 0 0 0 0 0.0
2 Pole/Support Structure 0 0 0 0
2 8.0 mtr 200 kg working load PSC Pole No 0 0 0 0 0.0
3 M.S.Galvanised Clamps for 1 phase LT AB Cable 0 0 0 0
i Suspension clamps No 0 0 0 0 0.0
ii Tension /dead end clamps (Bolted type) No 0 0 0 0 0.0
iii Forged Eye hook suitable for Suspension and tension clamps. No 0 0 0 0 0.0
4 LT stay set assembly (excluding stay clamp & fasteners) 0 0 0 0
4a Stay wire(7/12 SWG) MT 0 0 0 0 0.0
4b Guy Strain Insulator designation 'A' Set 0 0 0 0 0.0
4c Suitable Hardware Fittings complete with Anchor plate, Anchor rod, Turnbuckle, Thimbles, Guy grip, fastners to attach Anchor plate to Anchor rod, etc. Set 0 0 0 0 0.0
III Reconductoring of existing 11kV HT Lines having Rabbit Conductor 0 0 0 0
1 AAAC equivalent to ACSR Rabbit Conductor as per TS Km. 0 0 0 0
2 Pole/Support Structure 0 0 0 0
2a 9mtr 300 kg working load PSC Pole Nos. 0 0 0 0
2b 13 mtr RS Joist 150x150mm Nos 0 0 0 0
3 M.S.Galvanised Items 0 0 0 0
3a Fabrication and Supply of M.S. Galvanised items- Pole Top Bracket, V-Cross arm, Back Clamp for V-Cross arm, D P Channel, D P Channel clamp, Stay clamps angle, Stay clamps side, D P cross bracing & clamps etc. complete as required. MT 0 0 0 0
3b M.S.Galvanised Fasteners of different type/Sizes as per requirement suitable for above 0 0 0 0
3b(i) Nuts & Bolts Kg 0 0 0 0
3b(ii) Washers (plain and spring) Kg 0 0 0 0
4 11kV Pin Insulators 0 0 0 0
4a Pins(5kN) with nuts and washers complete suitable for insulator assembly Set 0 0 0 0
4b Porcelain pin Insulator (300 mm creepage) Set 0 0 0 0
5 11kV Disc insulator assembly 0 0 0 0
5a 11kV, 45 kN Electro Mechanical Strength Disc insulator of 300 mm min. creepage distance Nos 0 0 0 0
5b Hardware fittings suitable for the above complete with cross arm strap, ball eye socket eye, strain clamp, cotter pin etc. Set 0 0 0 0
6 Al alloy Preformed insulator bindings for 11 kV pin insulator Set 0 0 0 0
7 11kV stay set assembly (excluding stay clamp & fasteners) 0 0 0 0
7a Stay wire (7/10 SWG) MT 0 0 0 0
7b Guy Strain Insulators designation 'C' Set 0 0 0 0
7c Suitable Hardware Fittings complete with Anchor plate, Anchor rod, Turnbuckle, Thimbles, Guy grip, fastners to attach Anchor plate to Anchor rod, etc. Set 0 0 0 0
8 Earthing 0 0 0 0
20mm dia 2500 mm long GI Rod together with fixing arrangement(excluding GI wire required for earthing). Set 0 0 0 0
9 Guarding and Lacing 0 0 0 0
9a 8 SWG GI wire for guarding & earthing kg 0 0 0 0
9b 10 SWG wire for lacings kg 0 0 0 0
III Materials for Pole mounted Distribution Transformers (1 ph- 16 KVA & 1 ph-25 KVA) 0 0 0 0
1 11/.23kV, 1-Phase Distribution Transformers (Copper Wound) along with all accessories 0 0 0 0
a 1 phase, 25 kVA No 0 0 0 0 0.0
b 1phase, 16 kVA No 0 0 0 0 0.0
2 DO fuse 0 0 0 0
a 11 kV DO fuse complete Set 0 0 0 0 0.0 0.0
b 11kV DO fuse operating Rod Set 0 0 0 0 0.0 0.0
3 LT Distribution box with suitable rating MCCBs and CT operated single phase static energy meter (alongwith 2 nos suitable rating CTs for 25kVA 1 phase DT& meter communication box with communication cord) No 0 0 0 0 0.0
4 LT Distribution box with suitable rating MCCBs and CT operated single phase static energy meter (alongwith 2 nos suitable rating CTs for 16kVA 1 phase DT& meter communication box with communication cord) No 0 0 0 0 0.0
5 9kV, 5kA single Phase distribution class Lightning Arrestor with in-built Disconnector for DT Nos 0 0 0 0 0.0 0.0
6 Common meter reading instrument Nos. 0 0 0 0 0.0
IV Service Connections 0 0 0 0
1 2x 2.5 sq mm Al core PVC insulated cable for service connection Km. 0 0 0 0 0.0
2 1-ph, 5-20 amps Static Energymeter Energymeter for service connection No 0 0 0 0 0.0
3 Insulation Piercing type Connector for insulated phase wire of AB Cable to connect with 2x2.5 sq.mm.service cable No. 0 0 0 0 0.0
V Other Materials 0 0 0 0
1 11kV Line sectionliser Tilted type, 3 pole 400 Amp. 10kA as per TS No. 0 0 0 0 0.0
VI Material for 11kV railway crossing 0 0 0 0
a 11kV 3Cx300 sq.mm aluminium, armoured XLPE cable mtr 400 0 0 1,004,512 0 0
b 11kV Termination Kit suitable for 11kV 3Cx300 sq.mm XLPE cable Set 4 0 0 26,843 0 0
c 11kV 400A AB switch Set 2 0 0 25,085 0 0
10 11kV river crossing on 132 kV tower 99,617 0 0
a D/C D type tower material with 9 mtr extension* MT 58,943 0 0
b 132 kV 90kN EMS strength porcelain insulators string (consisting of 8 nos disc with 300mm creepage of each disc) alongwith all hardware and accesoories suitable for Panther conductor Set for River Crossing 0 0 Approved Estimate
Insulator (90 KN Standard) * Nos 497 0 0
ii) Hardware Fitting
Single Tension Fittings* Nos 9,419 0 0
Double Tension Fittings* Nos 11,470 0 0
iii) Earthwire (G.S. 7/3.15 mm) * Km 41,559 0 0
iv) E'wire Accessories
Flexible Copper Bond for earthwire * Nos 362 0 0
Vibration Damper for Earthwire * Nos 413 0 0
Earthwire Tension Clamps * Nos 686 0 0
c 11kV, 400Amp AB switch Nos. 0 0 0 0
SUB TOTAL - SUPPLY -PART - I - 11KV HT LINES 3,079,264 513211 3662503
I Supply of equipments for new 33kV Bay Extn. - 2 nos.(At Jainagar and Sitamarhi) as per TS (including all accessories). 0 0 0 0
1.00 5 MVA, 33/11kV Power Transformer with OLTC No. 0 0 0 0 0 0 0
2.00 100 KVA, 33/0.433 kV, Station Transformer No. 0 0 0 0 0 0
1.00 3-ph, Outdoor type, Vacuum Circuit breaker with spring type operating mechanism along with support structure. 0 0 0 0
2.00 Isolator/AB switch 0 0
a 3-ph, 3 Pin type, Horizontal Mounting type, Double Break Isolator without earth switch 0 0 0 0
ii. 12kV, 400A, 25kA, 3-ph Isolator Set 0 0 0 0 0 0 0
3b 36kV 400A 25KA, 3 ph 9 post insulator, AB isolator, Gang operated along with support insulator operating mechanism Base channel down pipe and all required acessories complete as per TS (For pole mounted station transformer) Set 0 0 0 0 0 0
3.00 Lightening Arrestor 0 0 0 0
i. 30kV, 10kA, 1-ph, Station Class No. 6 5,339 32,037 60,434 6 0 0 6
ii 30kV, 10kA, 1-ph, Station Class with polymer housing for transformer No. 0 10,072 0 0 0 0 0 0
iii 9kV, 10kA, 1-ph, Station Class No. 0 10,072 0 0 0 0 0 0
iv 9kV, 10kA, 1-ph, Station Class with polymer housing for transformer No. 0 10,072 0 0 0 0 0 0
4.00 Current Transformer (CT) dead tank type including Junction Box ( one junction box for 3 nos. of CTs ) 0 0 0 0
5.00 Potential Transformer (PT) including junction box (one JB for 3 single phase PT and one JB for three phase PT) 0 0 0 0
ii 12 kV, 3-ph, 11kV/110 volt set 0 0 0 0 0 0 0
6.00 Indoor type Control & Relay Panel (C&R) 0 0 0 0
i 33kV C&R Panel for 0 0 0 0
a Feeder VCB with TVM Energy Meter set 2 167,604 335,209 228,158 2 2
b Transformer VCB with TVM Energy Meter set 0 31,150 0 0 0 0 0 0
ii. 11kV C&R Panel for 0 31,150 0 0 0
a Transformer VCB without TVM Energy Meter set 0 31,150 0 0 0 0 0 0
b Feeder VCB with TVM Energy Meter set 0 31,150 0 0 0 0 0 0
8.00 33kV, 400A, 1-ph Horn Gap Fuse ( 1 Set for 3 poles) Set 0 31,150 0 0 0 0 0
9.00 Battery , Battery Charger with 24V DCDB & 415V ACDB 0 31,150 0 0 0
i. 24V, 80AH, Lead-ACid type Battery Set at 10 Hr Discharge having float level indicators, terminal connectors, required quantity of electrolyte, distilled water,connectors and all other accessories complete. set 0 31,150 0 0 0 0 0
ii. 24V, Float-Cum-Boost Battery Charger with full wave, full control rectification, 50Hz Input Voltage for charging 24V, 80AH Battery alongwith inbuit DCDB, connectors etc. complete and conection with 24 V 80AH Battery Set and Three phase AC input supply set 0 31,150 0 0 0 0 0
iii. 415V AC Distribution board/panel of sheet steel enclosed cubical floor mounting type for catering auxialiary power supply of the substation etc. complete. set 0 31,150 0 0 0 0 0
7.00 Bay Marshelling Kiosk ( AC cum DC Panel ) complete. No. 2 44,952 89,904 73,815 2 0 0 2 0
8.00 Substation Auxilaries 0 0 0 0
i. 1.1KV grade PVC Insulated steel armoured single strand Al/Copper conductor power & control Cables 0 0 0 0
A Power Cable(Aluminium Conductor) 0 0 0 0
B Control Cable(Copper Conductor) 0 0 0 0
ii Clamps & Connectors as per Approved Electrical Layout 0 0 0 0
a T-Clamps, Through Clamp, Connectors, P.G.Clamps Bimetallic Connectors etc. suitable for connection to ACSR Wolf Conductor, various 33KV & 11KV Eqipments such as Power Transformer, CB,CT, PT etc complete as per requirement. Set per Substation for 1x5MVA new s/s 0 0 0 0 0
b T-Clamps, Through Clamp, Connectors, P.G.Clamps Bimetallic Connectors etc. suitable for connection to ACSR Wolf Conductor, various 33KV & 11KV Eqipments such as Power Transformer, CB,CT, PT etc complete as per requirement. Set per Substation for 2x5MVA new s/s 0 0 0 0 0
c T-Clamps, Through Clamp, Connectors, P.G.Clamps etc. suitable for connection to ACSR Wolf Conductor, various 33KV & 11KV Eqipments such as Power Transformer, CB,CT, PT etc complete as per requirement. Set per Substation for Transformer Aug. 0 0 0 0 0
a T-Clamps, Through Clamp, Connectors, P.G.Clamps etc. suitable for connection to ACSR Wolf Conductor, various 33KV & 11KV Eqipments such as Power Transformer, CB,CT, PT etc complete as per requirement. Set per substation for 33kV . 2 276,809 553,617 553,617 2 2
iii ACSR Conductor 0 0 0 0
a ACSR Wolf Conductor Km 1 108,612 65,167 65,167 0.6 0 0 1 0
iv Earthing & Grounding conductor 0 0 0 0
a 40 mm dia 3000mm long GI pipe earth electrodes with fixing arrangement for Treated earth pits. Set 10 3,211 32,108 23,633 10 0 0 10 0
b 20mm dia, 3000mm long GI rod with fixing arrangement Set 10 4,013 40,132 18,183 10 0 0 10 0
c 50mm x 6mm Galvanised Steel flat MT 0 75,752 30,301 30,301 0 0 0 0 0
d 25 mmx 6 mm Galvanised Steel flat MT 0 75,752 15,150 15,150 0.2 0 0 0 0
e 32 mm dia MS round rod MT 1 42,421 42,421 42,421 1 0 0 1 0
v 33kV & 11kV Insulator along with Hardware & Accessories 0 0 0 0
a 70 kN Electro Mechanical Strength Disc insulator string having 1200 mm min. creepage distance (consisting of 4 nos. of 11kV, 70KN EMS disc insulators having 300mm min. creepage) Set 24 3,083 73,985 47,513 24 0 0 24 0
b Hardware & accessories for item (a) above Set 24 0 0 4,006 24 0 0 24 0
c 11kV, 45 kN Electro Mechanical Strength Disc insulator string having 600 mm min. creepage distance (consisting of 2 nos. of 11kV, 45KN EMS disc insulators having 300mm min. creepage) Set 0 0 0 0 0 0 0
d Hardware & accessories for item (c)above Set 0 0 0 0 0 0 0
e 33kV Bus Post Insulator Set 0 0 0 0 0 0 0
f 11kV Bus Post Insulator Set 0 0 0 0 0 0 0
vi Galavanised Structure 0 0 0 0
A. Galvanised MS lattice structure for 33 kV and 11kV Switch yard i.e. Tower Beam, lighting tower, equipment support structure including Nuts, bolts, foundation bolts, washers and other accessories complete. MT 8 90,619 761,202 836,785 8.4 0 0 8 0
ix Station Lighting System : Switchyard & Building lighting/ illumination 0 0 0 0
a) Lighting System complete for switchyard including maingate & subtation boundary Set per Substation 0 0 0 0 0 0
b) Lighting System complete for Control room building. Set per Substation 0 0 0 0 0 0
x Testing Equipment 0 0 0 0
a Megger(Hand operated), 1000V No. 0 0 0 0 0 0
xi Tools & Plants 0 0 0 0 0
a Crimping Tools Machine (Hydraulic type) No. 0 0 0 0 0
b Multi Meter No. 0 0 0 0 0 0
c Max-pully(5 Ton) No. 0 0 0 0 0 0
d Chain Pully Block(5Ton - 10 Ton) No. 0 0 0 0 0 0
xii Safety Equipment 0 0 0 0 0
A Portable Fire Extinguisher 0 0 0 0
a Dry Chemical Powder Type(5 Kg) for C/R No. 0 0 0 0 0 0
b CO2 Type Trolly mounted of 22.5Kg Capacity for S/Y No. 0 0 0 0 0 0
c CO2 Type of 4.5Kg Capacity for C/R No. 0 0 0 0 0 0
B Electrical Resistance Hand Gloves conforming IS:4770-1968 No. 0 0 0 0 0 0
C Rubber Mat 1M wide 12.5mm thick No. 0 0 0 0 0 0
D Safety Belt with theigh stracs confirming IS:2925 with ISI mark No. 0 0 0 0 0 0
SUB -TOTAL - PART -II 33KV BAY EXTN 3,469,270
II Materials for 33kV HT Lines as per TS. Total line length 23km ( 33 kv line for termination at Jainagar-1km and Sitamarhi-Susand line -22km )
A 3 Phase with ACSR conductor 0 0 0 0 16.66666667
Panther Conductor. * Km. 0 149,749 0 0 60 59.994 0 no of span 20 nos
2 Pole/Support Structure 4 3.96
2b 13 mtr RS Joist 150x150mm No. 464 463.8
3 M.S.Galvanised Items 0 0 0 0 0
3a Fabrication and Supply of M.S. Galvanised items- Pole Top Bracket, V-Cross arm, Gaurding cross arm, Back Clamps for V-Cross arm and Gaurd cross arm, D P Channel, D P Channel clamp, Stay clamps angle, Stay clamps side, D P cross bracing & clamps etc. complete as required. MT 23 93,524 2,151,043 1,799,480 0
3b Galvanised M.S. Fasteners of different type/Sizes as per requirement suitable for above 0 0 0 27 27 0
3b(ii) Washers (plain and spring) Kg 78 102 7,958 6,482 516 516 0
4 33kV Pin Insulators 79 79.32 0
4a Pins(10kN) with nuts and washers complete suitable for insulator assembly Set 1380 1,325 1,828,820 433,783 0
4b Porcelain pin Insulator (900 mm creepage) Set 1380 0 0 993,879 1296 1296 0
5 33kV Disc insulator assembly 1296 1296 0
5a 33kV, 70 kN Electro Mechanical Strength Disc insulator string having 900 mm min. creepage distance ( 1 string consists of 3 insulators of 300mm creepage) Set 276 3,181 878,090 476,663 0
5b Hardware fittings suitable for the above complete with cross arm strap, ball eye socket eye, strain clamp, cotter pin etc. Set 276 0 0 173,513 310 309.6 0
6 AL alloy Preformed insulator bindings for 33 kV pin insulator Set 1380 0 0 51,522 310 309.6 0
7 33kV stay set assembly (excluding stay clamp & fasteners) 1296 1296 0
7b Set of 2 nos Guy Strain Insulators designation 'C' Set 92 67 6,134 11,523 3731 3730.8 0
7c Hardware Fittings (Anchor plate, Anchor rod, Turnbuckle, Thimbles, Guy grips, fastners to attatch Anchor Plate to Anchor Rod, etc) to complete 33 kV stay set Set 92 812 74,681 60,165 444 444 0
8 Earthing 444 444 0
20mm dia 2500 mm long GI Rod together with fixing arrangement(excluding GI wire required for earthing). Set 460 878 404,072 269,245 0
9 Guarding and Lacing 0 0 0 444 444 0
9a 8 SWG GI wire for guarding & earthing kg 259 86 22,315 18,404 0
9b 10 SWG wire for lacings kg 57 86 4,911 3,913 223 223.20144 0
10 Material for 33kV railway crossing 0 0 49 49.104 0
a 33kV 3Cx300 sq.mm aluminium, armoured XLPE cable mtr 600 0 0 2,169,278 0
b 33kV Termination Kit suitable for 33kV 3Cx300 sq.mm XLPE cable Set 4 0 0 80,605 0
c 33kV, 400Amp AB switch Nos. 2 0 0 105,070 0
3 33kV river crossing on 132 kV tower 0 0
1 D/C D type tower material with 25 mtr extension* MT 58,943 0 0
2 132 kV 90kN EMS strength porcelain insulators string (consisting of 8 nos disc with 300mm creepage of each disc) alongwith all hardware and accesoories suitable for Panther conductor Set for River Crossing 0 0 Approved Estimate
Insulator (90 KN Standard) * Nos 497 0 0
ii) Hardware Fitting
Single Tension Fittings* Nos 9,419 0 0
Double Tension Fittings* Nos 11,470 0 0
iii) Earthwire (G.S. 7/3.15 mm) * Km 41,559 0 0
iv) E'wire Accessories
Flexible Copper Bond for earthwire * Nos 362 0 0
Vibration Damper for Earthwire * Nos 413 0 0
Earthwire Tension Clamps * Nos 686 0 0
SUB -TOTAL - PART -II 33KV HT LINES 29,220,907 32772321 1424884
III Materials for 33kV underground line Lines as per TS. Total line length 300 mtr ( 33 kv underground line from Raxaul (old )to raxaul (new)) 0 0 1424883.501
a 33kV 3Cx300 sq.mm aluminium, armoured XLPE cable mtr 325 3,615 1,175,025 1,175,025 0 0
b 33kV Termination Kit suitable for 33kV 3Cx300 sq.mm XLPE cable Set 2 20,151 40,302 40,302 0 0
d Structutre for 33kV gantry for termination of cable MT 2.6 99,617 259,005 259,005
SUB -TOTAL - 33KV UNDERGROUND LINES 1,579,403 1926087 5926
IV Materials for Energy meter and CT for 132KV & 33 KV Lines 0 0
1 132 kV Energy meter alongwith CT as per TS * set 6 741,348 4,448,091 4,448,091
2 33 kV Energy meter alongwith CT as per TS * set 16 363,573 5,817,168 6,544,314
V Materials for 33kV capacitor bank - 3 nos ( at Jaleswar (Nepal), Janakpur (Nepal) and Bhaiwahawa (Nepal) 0 0
v Capcitor bank at Jaleswar (Nepal) (12MVAR at 33kV level) Set 1 1,608,137 1,608,137 1,608,137
TOTAL SUPPLY PORTION 49,222,240 48,825,589
Freight & Insurance Charges @ 6% 2,625,046
ENTRY TAX @ 8% 4,147,783
GRAND TOTAL - SUPPLY PORTION INCLUDING TAXES & DUTIES 55,995,069
* NOTE : UNIT RATES FOR THESE ITEMS ARE TAKEN FROM SCHEDULE OF RATES 3Q 2011 PRICE LEVEL
# Note: Quantity including Spares
COST BREAK UP OF TRANSMISSION LINES AND SUBSTATIONS ANNEXURE - 1.2.1
ANNEXURE - 1.2 (B)
ERECTION PORTION (Rs. in Lakhs)
PROJ: PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID.
Quantity Breakup
Sl. No. Description of Items Unit Quantity # Unit Erection Rate (Rs.) Total Amount in Rupees Check Qty. 11kV Trunk 11kV Branch 11kV Spur LT Line DT 16kVA DT 25kVA Service Connections Recond 11kV New 33kV Line New 33/11kV S/s 1x5MVA New 33/11kV S/s 2x5MVA 33kV Bay Aug. Trans. Aug. Recon 33kV Line
I Erection of 11kV HT Lines as per TS. Total line length 6km ( Janinagar-Nepal border)
A. 3 Phase With ACSR Rabbit Conductor
1 Route survey and pole spotting of 11KV line Km. 6 1,180 7,081 6 6 0
2 Erection of PSC Poles 0 0
2a 9 mts. 300 kg working load PSC Pole including backfilling the pit with excavated/borrowed earth & Jhama(broken brick bating) and compaction complete in all respects. Nos 54 1,394 75,260 22 22 0 0
2b 9 mts. 300 kg working load PSC Pole including concreting of the pole (including supply of foundation material) in all respects. Nos 54 2,004 108,218 22 22 0 0 0 0
2c Double pole structure using 9 mtr 300kg working load PSC poles including backfilling the pit with excavated/borrowed earth & Jhama(broken brick bating) and compaction complete in all respects. Nos 0 2,505 0 0 0
2d Double pole structure using 9 mtr 300kg working load PSC poles including concreting of the pole (including supply of foundation material) in all respects. Nos 9 3,007 27,060 3 3 0
3 Erection of 13 mtr rail pole 0 0 0
3a 13 mtr rail pole including concreting of the rail pole (including supply of foundation material) in all respects. Nos 23 5,670 130,403 53 53 0
3b Double pole structure using 13 mtr rail pole including concreting of the rail pole (including supply of foundation material) in all respects. Nos 0 7,015 0 5 5 0
3c Triple pole structure using 13 mtr RAIL POLE including concreting of the joist (including supply of foundation material) in all respects. Nos 0 3,007 0 0 0
3b Four pole structure using 13 mtr rail poles including concreting of the rail pole (including supply of foundation material) in all respects. Nos 0 13,077 0 6 6 0
4 Stringing of conductor 0 0
4a Stringing of 3- ph 3-wire ACSR Rabbit conductor including installation of insulators, hardware fittings, fixing of all galvanised items i.e.cross arm, guarding cross arm, pole top bracket, clamps etc., conductor accessories, jumpering arrangement at tension pole, stringing of guard wires (as required), GI earthwire etc. as per requirement complete in all respect. (This shall also include supply and installation of PG clamps at tension locations, danger plates and anticlimbing devices on DP, Triple pole and Four pole structures and connectors and preformed jointing & repair sleeves and any other material required but not included in supply portion of BPS as per requirements. ) Km 6.0 18,673 112,040 5 5
4b Stringing of 3- ph 3-wire AAAC equivalent to ACSR Weasel conductor including installation of insulators, hardware fittings, fixing of all galvanised items i.e.cross arm, guarding cross arm, pole top bracket, clamps etc., conductor accessories, jumpering arrangement at tension pole, stringing of guard wires (as required), GI earthwire etc. as per requirement complete in all respect. (This shall also include supply and installation of PG clamps at tension locations, danger plates and anticlimbing devices on DP, Triple pole and Four pole structures and connectors and preformed jointing & repair sleeves and any other material required but not included in supply portion of BPS as per requirements. ) 0 0 0
4b(i) Branch Line km 0 0 0 0
4b(ii) Spur line km 0 0 0
5 11 kV Stay set complete in all respect. Set 24 1,824 43,765 132 132 0 0 0 0
6 Earthing 0 0 0
i Untreated Rod type earthing. Set 120 215 25,789 132 132 0 0 0
ii Treated pipe type earthing as per TS Nos. 0 0 0 0 0
7 Erection of 11KV Railway crossing including supply of 2 nos GI pipe of 1.5 times the dia of XLPE cable, clamps & connectors etc as per TS Set 1 53,622 53,622
II. ERECTION OF LT line as per TS 0 0 0
1 Route survey and pole spotting of LT line CKm. 0 0 0 0
2 Erection of PSC Poles 0 0 0
2a 8 mts. 200 kg working load PSC Pole including backfilling the pit with excavated/borrowed earth & Jhama(broken brick bating) and compaction complete in all respects. Nos 0 0 0 0
2b 8 mts. 200 kg PSC Pole including concreting of the pole (including supply of foundation material) in all respects. Nos 0 0 0 0
3 Stringing of Aerial Bunched Cable 0 0 0
3a Stringing of 1 phase Aerial Bunched Cable (ABC) including installation of eyehooks & eyehook clamps, all accessories as per TS. This would include supply & installation of jointing kits, termination kits, end caps, connectors for ABC to ABC tapping and all other items required for completion of works but not included in supply portion of BPS Km 0 0 0 0
4 LT Stay set complete in all respect. Set 0 0 0 0
III Replacement of old Conductor with Rabbit/Weasel on existing 11kV HT Lines as per TS 0 0 0
1 Route survey and pole spotting of 11KV line as per TS Km. 0 0 0 0
2 Dismantling of conductor and other compnent of lines including damaged poles. The contractor shall stack, account for dismantled conductor and steel poles (rail pole/RS Joist/steel tubular poles), transport it to the designated store of DISCOM and deposit the same there. All balance items shall be disposed off by the contractor at his own cost. Km. 0 0 0 0
4 Stringing of Conductor as per TS. 0 0 0
4a Laying out and Sagging of AAAC Rabbit Conductor , Mid point jointing , binding of conductor with pin insulator including jumpering etc.(this shall include supply and instalation of PG clamp danger plate and anticlimbing device as per actual site requirement). Km 0 0 0 0
4b Laying out and Sagging of guard wire including lacing complete along the line and at crossings (Road, drain/nalla, etc.) kg 0 0 0 0
4c Fixing & fitting of Top Bracket / A-clamp, V cross arm, Top channel, Cross bracing, back clamp, support clamp, Guard Bracket, Earth clamp, back clamp, etc., including straightening of tilted pole, including dismantling of existing items and disposing off (Payment shall be made based on the tonnage of the new structure material installed.) MT 0 0 0 0
4d Fixing & fitting of Disc insulator assembly with hard ware fitting on DP wherever necessary including dismantling of existing insulators and disposing off as per technical specification(Payment shall be made based on the sets of new Insulator installed) Set 0 0 0 0
4e Fixing & fitting of Pin insulator with pin including dismantling of existing insulators and disposing off (Payment shall be made based on the sets of new Insulator installed) Set 0 0 0 0
III ERECTION OF POLE MOUNTED DISTRIBUTION TRANSFORMERS as per TS 0 0 0
1 Installation testing & commissioning of 1-Phase, (11/0.23 kV) Distribution Transformer along with all associated equipment , accessories and mounting arrangement viz M.S.galvanised items- channel & Clamps for supporting transformer, DO fuse, LA, transformer belting & belting support, if required, angle for LT distribution box, LTDB, PVC cables , DT Energy meter , GI Earthwire etc as per TS.This includes supply and fixing of danger plate, RGGVY board (300mm(L)x300mm(W), 1.6mm thickness(min.)), anticlimbing device etc. 0 0 0
1a 1 phase, 25 KVA No. 0 0 0 0
1b 1 phase, 16 KVA No. 0 0 0 0
IV ERECTION AND COMMISSIONING OF SERVICE CONNECTIONS AS PER TS 0 0 0
1 Providing service connection for BPL consumers . This includes supply of all remaining items required for service connection(rewirable kitkat fuse, DP switch, wooden meter board with earthing terminal, 14W CFL lamp with lamp holder, and a 5Amp switch on a seprate wooden board etc.)as per TS, except PVC cable, piercing connector and energy meter which have been considered separately as supply items. No. 0 0 0 0
V Other Items as per TS 0 0 0
1.00 Erection and commissioning of 11kV Line sectionliser Tilted type, 3 pole 400 Amp. 10kA. Set 0 0 0 0
2.00 Supply(including supply of angle, all other acessary and founndation material for angle etc.) and erection of RGGVY board (made of Iron sheet) of size 3feetx 4feet and thickness 1.6mm near office of Sarpanch/Gram Panchayat or any other prominent location of the village. Set 0 0 0 0
3.00 Erection 11kV railway crossing including supply of 2 nos. GI Pipes of 1.5 times the dia of XLPE cable, clamp & connctors etc. as per TS No. 0 0 0 0
3.00 Erection 11kV line on 132 kV D/C tower for 1 nos of river crossing (600 mtr Span each) - total 2 nos of tower 0
Erection of Tower 0
a Foundation of lattice structure tower including design of foundation form box, template for stub setting, supply of all materials required for foundation, excavation in all type of soil, backfilling etc 0
i Earthwork,excavation of foundation, trenches or drain (Not exceeding 1.5mts. Width 0.6 mts depth) including dressing of sides, ramming of bottoms lift upto 1.5 mts. Including stacking out the excavated soil, disposing of surplus materials within lead of all type of laterite rock (blasting prohibited including counterpoise earthing for 2 nos of river crossing tower. Cu.m 287 0 383 #VALUE! 0 #VALUE! Approved Estimate
ii Providing and laying cement concrete 1:1.5:3 (1: cement, 1.5: sand, 3: granite) excluding cost of cantering & shuttering in foundation and plinth(for soft rock) for 2 nos of river crossing tower. Cu.m 6,033 0 7,659 #VALUE! 0 #VALUE! Approved Estimate
iii Providing and laying lean cement concrete 1:3:6 (1: cement, 3: sand, 6: granite) at bottom for 2 nos of river crossing tower. Cu.m 4,980 0
iv High yield strength reinforcement to IS-1788 of 1966 for RCC work including bending, binding, placing in posision in all floorsfor 2 nos of river crossing tower.. MT 76,273 0 68,933 #VALUE! 0 #VALUE! Approved Estimate
b Erection of galvanised steel structural tower materials as per approved drawing and technical specification for 2 nos of river crossing tower. MT 5,379 0 7,659 #VALUE! 0 #VALUE! Approved Estimate
c Stringing of panther conductor including fixing of double tension and single tension hardware for, insulators, conductor, earthwire and conductor and earthwire accessories complete in all respectas to make D/C line operational as per TS Route km 71,378 0 153 #VALUE! 0 #VALUE! Approved Estimate
PART - II 0 0 0
I Erection of equipments for new 33kV Bay Extn. - 2 nos.(At Jainagar and Sitamarhi) as per TS (including all accessories). 0 0
1.00 5 MVA, 33/11kV Power Transformer with OLTC(Excluding foundation). No. 0 0 0 0 0 0
2.00 100 KVA, 33/0.433 kV, Station Transformers (Excluding foundation). No. 0 0 0 0 0
1.00 3-ph, Outdoor type, Vacuum Circuit breaker along with support structure (Excluding foundation). 0 0 0
ii. 12kV, 630/600A, 25kA, 3-ph VCB set 0 0 0 0 0 0
2.00 Isolator/AB switch 0
a 3-ph, 3 Pin type, Horizontal Mounting type, Isolator without Earth Switch(Excluding foundation). 0 0 0
i 36kV, 630A, 25kA, 3-ph Isolator Set 4 19,303 77,214 4 0 0 4 0
ii 12kV, 400A, 25kA, 3-ph Isolator Set 0 0 0 0 0 0
3b 36kV 400A 25KA, 3 ph 9 post insulator, AB isolator, Gang operated along with support insulator operating mechanism Base channel down pipe and all required acessories complete as per TS (For pole mounted station transformer) Set 0 0 0 0 0
3.00 Lightning Arrestor 0 0 0
i. 30kV, 10kA, 1-ph, Station Class No. 6 2,145 12,872 6 0 0 6 0
ii 30kV, 10kA, 1-ph, Station Class with polymer housing for transformer No. 0 0 0 0 0 0
iii 9kV, 10kA, 1-ph, Station Class No. 0 0 0 0 0 0
iv 9kV, 10kA, 1-ph, Station Class with polymer housing for transformer No. 0 0 0 0 0 0
4.00 Outdoor type Single Phase Current Transformer (CT) including JB (excluding foundation) 0 0 0
5.00 Outdoor type Potential Transformer (PT) including JB (excluding foundation) 0 0 0
6.00 Indoor type Control & Relay Panel (including foundation). 0 0 0
i. 33kV C&R Panel for 0 0 0
a 33kV Feeder VCB with TVM Energy Meter set 2 17,159 34,319 2 0 0 2 0
b 33/11kV Trf VCB with TVM Energy Meter set 0 0 0 0 0 0
ii. 11kV C&R Panel for 0 0 0
a 33/11kV Trf VCB without TVM Energy Meter set 0 0 0 0 0 0
b 11kV Feeder VCB with TVM Energy Meter set 0 0 0 0 0 0
8.00 33kV, 400A, 1-ph Horn Gap Fuse complete with Support Insulators, Hardware, Base Channel, terminal connectors etc. complete for installation, testing & commissioning.( 1 Set for 3 poles) Set 0 0 0 0 0
9.00 Battery , Battery Charger with 30V DCDB & 415V ACDB 0 0 0
i. 24V, 80AH, Lead-ACid type Battery Set at 10 Hr Discharge Rate consisting of 12 Nos., each of 2.2V Cell having float level indicators, terminal connectors, required quantity of electrolyte, distilled water,connectors and all other accessories complete. set 0 0 0 0 0
ii. 24V, Float-Cum-Boost Battery Charger with full wave, full control rectification, 50Hz Input Voltage for charging 24V, 80AH Battery alongwith inbuit DCDB, connectors etc. complete and conection with 24 V 80AH Battery Set and Three phase AC input supply set 0 0 0 0 0
iii. 415V AC Distribution board/panel of sheet steel enclosed cubical floor mounting type for catering auxialiary power supply of the substation etc. complete. set 0 0 0 0 0
7.00 Bay Marshelling Kiosk ( AC cum DC Panel ) complete including foundation. No. 2 0 0 2 0 0 2 0
8.00 Substation Auxilaries 0 0 0
A 1.1KV grade PVC insulated steel armoured power & control cables laying including termination of cable, supply & installation of all accessories (as per requirement) like double compression type cable glands, ferules, lugging etc. for following cables as per approved cable schedule. 0 0 0
i Power Cable (Aluminium Conductor) 0 0 0
c 3.5cx95 Sq.mm Mtr. 0 0 0 0 0
B Control Cable(Copper Conductor) 0 0 0
9.00 Erection of Structures 0 0 0
Erection of Galvanised MS lattice structure for 33 kV and 11kV Switch yard i.e. Tower Beam, lighting tower, equipment support structure including Nuts, bolts, foundation bolts, washers and other accessories complete. MT 8 7,506 63,054 8 0 0 8 0
10.00 Stringing 0 0 0
i Erection of Bus bar, installation of all droppers, jumpers and inter connetion with all outdoor equipments using ACSR wolf conductor, including all assoicated conductor, insulator, hardware, clamps, connector for 33kV and 11kV bus bar and line gantry and equipment etc. for construction of new 33/11kV sub-station with one no. 33kV feeder, 2nos.of 33/11kV transformer bay & 4 nos. of 11kV outgoing feeder Set per new sub-station 1x5MVA 0 0 0 0 0
ii Erection of Bus bar, installation of all droppers, jumpers and inter connetion with all outdoor equipments using ACSR wolf conductor, including all assoicated conductor, insulator, hardware, clamps, connector for 33kV and 11kV bus bar and line gantry and equipment etc. for construction of new 33/11kV sub-station with one no. 33kV feeder, 2nos.of 33/11kV transformer bay & 4 nos. of 11kV outgoing feeder Set per new sub-station 2x5MVA 0 0 0 0
iii Erection of Bus bar,installation of all droppers, jumpers and inter connetion with all outdoor equipments using ACSR wolf conductor, including all assoicated conductor, insulator, hardware, clamps, connector for 33kV and 11kV bus bar and line gantry and equipment etc. for construction of augmentation of existing 33/11kV sub-station with one no. of 33/11kV transformer bay & 2 nos. of 11kV outgoing feeder Set per sub-station for augmentation work 0 0 0 0
i Erection of Bus bar,installation of all droppers, jumpers and inter connetion with all outdoor equipments using ACSR wolf conductor, including all assoicated conductor, insulator, hardware, clamps, connector for 33kV and 11kV bus bar and line gantry and equipment etc. for 33kV Bay extension. Set per 33kV bay Extn. 2 10,020 20,040 2 2
11.00 Erection of Earthing 0 0 0
i Laying 32 mm dia MS round rod for earth mat and connection of earthmat with all the substation equipment and structure including gantries with riser of size 50x6 and 25x6 Galvanised Steel. MT 1 2,145 2,145 1 0 0 1 0
ii 40 mm dia 3000mm long pipe earth electrodes with test links, RCC pits,CI cover hinged to CI frame,Charcoal, Salt (Alternatively Calcium Bentonite clay & black soil as per TS) and other accessories required for connection with earth mat ( including supply of all materials required for treated earth pit except supply itmes like 40 mm dia GI pipe with fixing arrangement) Set 10 5,362 53,625 10 0 0 10 0
iii 20mm dia, 3000mm long GI Rod as earth electrodes and other accessories etc. ( Untreated) to be burried below ground and other accessories required for connection with earth mat ( including supply of all materials required for untreated earth pit except supply itmes like 20 mm dia GI rod with fixing arrangement) Set 10 7,506 75,065 10 0 0 10 0
iv 33kV & 11kV Insulator along with Hardware & Accessories as per approved drawings & TS 0 0 0
c 33kV Bus Post Insulator (Excluding foundation) Set 0 0 0 0 0 0
d 11kV Bus Post Insulator (Excluding foundation) Set 0 0 0 0 0 0
v Station Lighting System : Switchyard & Building lighting/ illumination as per TS and approved design & drawing. 0 0 0
a) Lighting System complete for switchyard including maingate & subtation boundary Set per Substation 0 0 0 0 0
b) Lighting System complete for Control room building. Set per Substation 0 0 0 0 0
B Civil Work 0 0 0
1.00 Equipment Foundation 0 0 0
Design, engineering, supply of labour, material, T&P and construction of RCC foundation as per approved design & drawings for following equipments 0 0 0
i 33 KV Circuit Breaker No. 2 34,318 68,635 2 0 0 2 0
ii 33/11 KV, 5 MVA, Power Transformer No. 0 24,712 0 0 0 0 0
ii 33 kV LA (Single foundaion for set of 3 single phase LAs) No. 2 24,712 49,425 0 0 0 0 0
iii 33 KV Isolator No. 4 21,449 85,795 4 0 0 4 0
vii 33 kV Post Insulator (Single foundaion for set of 3 BPIs) No. 0 0 0 0 0 0
iv Foundations for 33 kV Bus Gantry (Tower) No. 4 64,345 257,379 4 0 0 4 0
v Foundations for 33 kV Line Gantry (Tower) No. 2 64,345 128,690 2 0 0 2
x 33kV, 400A, 1-ph Horn Gap Fuse ( 1 Set for 3 poles) Nos 0 0 0 0 0
xi 11 KV Circuit Breaker No. 0 0 0 0 0 0
xii 11 kV LA (Single foundaion for set of 3 single phase LAs) No. 0 0 0 0 0 0
xiii 11 KV Isolator No. 0 0 0 0 0 0
xvi 11 kV Post Insulator (Single foundaion for set of 3 BPIs) No. 0 0 0 0 0 0
xvii Foundations for 11 kV Bus Gantry (Tower) No. 0 0 0 0 0 0
xviii Foundations for 11 kV Line Gantry (Tower) No. 0 0 0 0 0 0
xix Double pole foundation for mounting 33/0.433 kV, 100kVA Station Transformers No. 0 0 0 0 0
3.00 Soil Investigation & Contour Survey of Substation area (New Sub-station) Per Substation 0 0 0 0 0
4.00 Earth Filling & Site Levelling 0 0 0
i. Earth work in PSS site with ordinary soil (vide classification of soil item - A) obtained from borrow pits free from logs,stumps,roots,rubbish or any other ingradients likely to detoriate or affect the stability of the site surface including breaking the clods maximum to 60 mm cubes,placing the earth in layers not exceeding 225 mm in loose thickness,rough dreesing including cost of cutting and removing shurbs , roots falling in borrow area all complete as per approved design ( Mode of measurement: sectional measurement after required compaction) CUM 0 0 0 0 0
5.00 Gravel filling in switchyard area excluding road, trenches etc. CUM 0 0 0 0 0
6.00 Construction of Boundary Wall including Barbed Wire Fencing on MS angle over the Boundary Wall & Main Gate including Supply, Fabrication, Fixing, Painting all complete as per approved Drawing. Mtrs 0 0 0 0 0
7.00 Security fencing with toe wall alongwith one switchyard gate as per approved drawings. Mtrs 0 0 0 0 0
8.00 Design, engineering and construction of Control Room Building including form work, excavation etc. all complete as per approved Drawing (Estimated size of control romm shall be 120 sq mtr.) including cable trench alongwith chequered plate (6 mm thick) cover inside the control room building. Sq.Mtr. 0 0 0 0 0
9.00 Design, engineering and construction of Cable Trench alongwith precast RCC Trench Cover, Brick Work wherever required all complete as approved Drawing outside the control room building. 0 0 0
i) 0.5 Mtrs wide Trench ( 500 mm deep) Mtrs 60 4,880 292,795 60 0 0 60 0
ii) 0.75 Mtrs wide main Trench ( 600 mm deep) Mtrs 60 8,043 482,586 60 0 0 60 0
10.00 Construction of Drainage System in the Substation premises all complete as approved Drawing. Mtrs 0 0 0 0 0
11.00 Construction of RCC Approach Road all complete as per approved Drawing. Mtrs 0 0 0 0 0
12.00 Sinking of Tubewell and installation of motor operated submersible pump of suitable capacity and reputed make (Make to be approved by POWERGRID) Nos 0 0 0 0 0
I Erection of 33kV HT Lines as per TS. Total line length 23km ( 33 kv line for termination at Jainagar-1km and Sitamarhi-Susand line -22km ) 0 0 0
A. 3 Phase With AAA Dog Conductor 0 0 0
1 Route survey and pole spotting of 33KV line Km. 23.0 1,445 33,224 20 20 0
2 Erection of PSC Poles 0 0 0
2a 9 mts. 400 kg working load PSC Pole including backfilling the pit with excavated/borrowed earth & Jhama(broken brick bating) and compaction complete in all respects. Nos 0 0 0
2b 9 mts. 400 kg working load PSC Pole including concreting of the pole (including supply of foundation material) in all respects. Nos 0 0 0
2c Double pole structure using 9 mtr 400kg working load PSC poles including backfilling the pit with excavated/borrowed earth & Jhama(broken brick bating) and compaction complete in all respects. Nos 0 0 0
2d Double pole structure using 9 mtr 400kg working load PSC poles including concreting of the pole (including supply of foundation material) in all respects. Nos 0 0 0
3 Erection of 13 mtr rail pole 0 0 0
3a 13 mtr RAIL POLE including concreting of the joist (including supply of foundation material) in all respects. Nos 391 5,535 2,164,312 17205336 17205336 0
3b Double pole structure using 13 mtr RAIL POLE including concreting of the joist (including supply of foundation material) in all respects. Nos 46 11,063 508,882 40 40
3c Triple pole structure using 13 mtr RAIL POLE including concreting of the joist (including supply of foundation material) in all respects. Nos 0 16,597 0 0 0
3b Four pole structure using 13 mtr RAIL POLE poles including concreting of the joist (including supply of foundation material) in all respects. Nos 0 22,071 0 12 12 0
4 Stringing of 3- ph 3-wire AAAC equivalent to ACSR Dog conductor including installation of insulators, hardware fittings, fixing of all galvanised items i.e.cross arm, guarding cross arm, pole top bracket, clamps etc., conductor accessories, jumpering arrangement at tension pole, stringing of guard wires (as required), GI earthwire etc. as per requirement complete in all respect. (This shall also include supply and installation of PG clamps at tension locations, danger plates and anticlimbing devices on DP, Triple pole and Four pole structures and connectors and preformed jointing & repair sleeves and any other material required but not included in supply portion of BPS as per requirements. ) Km 23.0 21,341 490,843 19.8 19.8 0
5 33 kV Stay set complete in all respect. Set 92 1,890 173,881 444 444 0
6 Untreated Rod type earthing. Set 460 223 102,464 444 444 0
II Replacement of old Conductor with AAA Dog on existing 33kV HT Lines as per TS 0 0 0
1 Route survey and pole spotting of 11KV line as per TS Km. 0 0 0 0
2 Dismantling of conductor and other compnent of lines including damaged poles. The contractor shall stack, account for dismantled conductor and steel poles (rail pole/RS Joist/steel tubular poles), transport it to the designated store of DISCOM and deposit the same there. All balance items shall be disposed off by the contractor at his own cost. Km. 0 0 0 0
4 Stringing of Conductor as per TS. 0 0 0
4a Laying out and Sagging of 3- ph 3-wire AAAC equivalent to ACSR Dog Conductor , Mid point jointing , binding of conductor with pin insulator including jumpering etc.(this shall include supply and instalation of PG clamp danger plate and anticlimbing device as per actual site requirement). Km 0 0 0 0
4b Laying out and Sagging of guard wire including lacing complete along the line and at crossings (Road, drain/nalla, etc.) kg 0 0 0 0
4c Fixing & fitting of Top Bracket / A-clamp, V cross arm, Top channel, Cross bracing, back clamp, support clamp, Guard Bracket, Earth clamp, back clamp, etc., including straightening of tilted pole, including dismantling of existing items and disposing off (Payment shall be made based on the tonnage of the new structure material installed.) MT 0 0 0.0 0.0
4d Fixing & fitting of Disc insulator assembly with hard ware fitting on DP wherever necessary including dismantling of existing insulators and disposing off as per technical specification(Payment shall be made based on the sets of new Insulator installed) Set 0 0 0 0
4e Fixing & fitting of Pin insulator with pin including dismantling of existing insulators and disposing off (Payment shall be made based on the sets of new Insulator installed) Set 0 0 0 0
III Erection 33kV railway crossing including supply of 2 nos. GI Pipes of 1.5 times the dia of XLPE cable, clamp & connctors etc. as per TS Set 1 77,808 77,808 0
3.00 Erection 33kV line on 132 kV D/C tower for 2 nos of river crossing (600 mtr Span each) - total 4 nos of tower 0
Erection of Tower 0
a Foundation of lattice structure tower including design of foundation form box, template for stub setting, supply of all materials required for foundation, excavation in all type of soil, backfilling etc 0
i *Earthwork,excavation of foundation, trenches or drain (Not exceeding 1.5mts. Width 0.6 mts depth) including dressing of sides, ramming of bottoms lift upto 1.5 mts. Including stacking out the excavated soil, disposing of surplus materials within lead of all type of laterite rock (blasting prohibited including counterpoise earthing for 4 nos of river crossing tower. Cu.m 287 0 383 #VALUE! 0 #VALUE! Approved Estimate
ii *Providing and laying cement concrete 1:1.5:3 (1: cement, 1.5: sand, 3: granite) excluding cost of cantering & shuttering in foundation and plinth(for soft rock) for 4 nos of river crossing tower. Cu.m 6,033 0 7,659 #VALUE! 0 #VALUE! Approved Estimate
iii *Providing and laying lean cement concrete 1:3:6 (1: cement, 3: sand, 6: granite) at bottom for 4 nos of river crossing tower. Cu.m 4,980 0
iv *High yield strength reinforcement to IS-1788 of 1966 for RCC work including bending, binding, placing in posision in all floorsfor 4 nos of river crossing tower.. MT 76,273 0 68,933 #VALUE! 0 #VALUE! Approved Estimate
b *Erection of galvanised steel structural tower materials as per approved drawing and technical specification for 4 nos of river crossing tower. MT 5,379 0 7,659 #VALUE! 0 #VALUE! Approved Estimate
c *Stringing of panther conductor including fixing of double tension and single tension hardware for, insulators, conductor, earthwire and conductor and earthwire accessories complete in all respectas to make D/C line operational as per TS Route km 71,378 0 153 #VALUE! 0 #VALUE! Approved Estimate
III Erection of 33kV underground line Lines as per TS. Total line length 300 mtr ( 33 kv underground line from Raxaul (old )to raxaul (new)) 0
a Erection 33kV under ground cable including supply of 2 nos. GI Pipes of 1.5 times the dia of XLPE cable, erection of terminating gantry and termination of cable including instalation of ab switch. LS 1 346,685 346,685 #REF! #REF!
IV Materials for Energy meter and CT for 132KV & 33 KV Lines 0
1 Erection of 132 kV Energy meter alongwith CT as per TS * set 6 16,443 98,658
1 Erection of 33 kV Energy meter alongwith CT as per TS * set 16 16,443 263,088
V Erection of 33kV capacitor bank - 3 nos ( at Jaleswar (Nepal), Janakpur (Nepal) and Bhaiwahawa (Nepal) 0
V Erection of Capcitor bank at Jaleswar (Nepal) (12MVAR at 33kV level) Set 1 37,974 37,974
TOTAL - ERECTION PORTION 6,768,556
PROJECT TOTAL - SUPPLY + ERECTION 62,763,625
BASE DATE LATEST Sep-11 ESC FACTOR
1 PV FOR AREVA August-08 Sep-11
2 PV FOR ICOMM May-08
3 rail pole February-11
3 CAPACITOR BANK February-05
ABSTRACT COST ESTIMATE
TRANSMISSION LINES
PROJ: #REF! NR-I
TRANSMISSION LINE SUMMARY
SIPAT - NORTH KARANPURA 765KV S/C TRANS.LINE SIPAT-SEONI 765KV S/C LINE (CKT- III) NORTH KARANPURA - SASARAM 765KV S/C LINE (PART- I: WZ 2 Portion) NORTH KARANPURA - SASARAM 765KV S/C LINE (PART- II: WZ 4 Portion) SASARAM -FATEHPUR 765KV S/C LINE FATEHPUR - AGRA 765KV S/C LINE NORTH KARANPURA- RANCHI 400KV D/C (QUAD) TRANS. LINE 400KV D/C SASARAM - BALIA (QUAD) TRANS. LINE AGRA - GURGAON 400KV D/C TRANS. LINE LILO OF 400KV S/C SINGRAULI - KANPUR TRANS. LINE AT FATEHPUR LILO OF 400KV S/C ALLAHABAD - KANPUR TRANS. LINE AT FATEHPUR
S.NO. DESCRIPTION TOTAL
436 KM 375 KM 175 KM 49 KM 342 KM 325 KM 109.43 KM 135 KM 220 KM 2.5 KM 1.0 KM 4q04 diff
1 Tower Steel #REF! 4283.56 #REF! #REF! #REF! 4044.96 #REF! #REF! #REF! #REF! #REF! #REF! 12522.97 #REF!
2 Conductor #REF! 16208.61 #REF! #REF! #REF! 4275.20 #REF! #REF! #REF! #REF! #REF! #REF! 9782.10 #REF!
3 Earthwire #REF! 330.88 #REF! #REF! #REF! 88.01 #REF! #REF! #REF! #REF! #REF! #REF! 238.21 #REF!
4 Insulator #REF! 3651.82 #REF! #REF! #REF! 845.33 #REF! #REF! #REF! #REF! #REF! #REF! 2384.25 #REF!
5 Hardware Fittings #REF! 2092.81 #REF! #REF! #REF! 464.54 #REF! #REF! #REF! #REF! #REF! #REF! 886.54 #REF!
6 Conductor & E'wire Accessories #REF! 740.72 #REF! #REF! #REF! 194.60 #REF! #REF! #REF! #REF! #REF! #REF! 627.98 #REF!
Sub-Total - Supply Cost #REF! 27308.39 #REF! #REF! #REF! 9912.64 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 26442.05 #REF!
7 Freight, Insurance & CST #REF! 2052.26 #REF! #REF! #REF! 611.54 #REF! #REF! #REF! #REF! #REF! #REF! 2840.64 #REF!
ED Service Tax #REF! 0.00 #REF! #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF!
9 Entry Tax #REF! 0.00 #REF! #REF! #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! 162.44 #REF!
10 Erection #REF! 230.21 #REF! #REF! #REF! 230.21 #REF! #REF! #REF! #REF! #REF! #REF! 986.29 #REF!
11 Stringing #REF! 889.03 #REF! #REF! #REF! 234.70 #REF! #REF! #REF! #REF! #REF! #REF! 675.80 #REF!
12 Civil Works #REF! 4033.86 #REF! #REF! #REF! 1050.97 #REF! #REF! #REF! #REF! #REF! #REF! 5304.04 #REF!
Sub-Total #REF! 34513.75 #REF! #REF! #REF! 12040.06 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 36411.27 #REF!
Equipment Cost per Km #REF! 92.04 #REF! #REF! #REF! 121.62 #REF! #REF! #REF! #REF! #REF!
13 River Crossings/ Aviation Signal/ Wind measuring equipment #REF! 0.00 #REF! #REF! #REF! 11.55 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 844.23 #REF!
Total Equipment Cost #REF! 34513.75 #REF! #REF! #REF! 12051.61 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 37255.50 #REF!
Cost per Km #REF! 92.04 #REF! #REF! #REF! 121.73 #REF! #REF! #REF! #REF! #REF!
Preliminary & Gen. Civil Works #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 2114.86 #REF!
Total Cost #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 39370.36 #REF!
Total Cost per Km #REF! 94.59 #REF! #REF! #REF! 124.21 #REF! #REF! #REF! #REF! #REF!
BASIS:Average of 400kV:1. SITANAGARAM - GAJUWAKA 400KV D/C TL 2 .TALA- SILIGURI 400KV D/C TL 3. PALANPUR - CHANDRAPUR 40KV D/C TL and 4. RIHAND -II and TALCHER-II (for few rates)
765kV: TEHRI TRANSMISSION SYSTEM
CONDUCTOR PACKAGE #REF! 17504.78 #REF! #REF! #REF! 4549.93 #REF! #REF! #REF! #REF! #REF! #REF!
INSULATOR PACKAGE #REF! 3941.44 #REF! #REF! #REF! 897.69 #REF! #REF! #REF! #REF! #REF! #REF!
TOWER PACKAGE #REF! 13067.53 #REF! #REF! #REF! 6603.99 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 34526.41 #REF! #REF! #REF! 12084.59 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! -12.66 #REF! #REF! #REF! -32.98 #REF! #REF! #REF! #REF! #REF!
DETAILED PROJECT REPORT
DETAILED PROJECT REPORT
STRENGTHENING OF INDIA – NEPAL ELECTRICAL INTERCONNECTION – SHORT TERM
DPR Prepared by
POWER GRID CORPORATION
OF INDIA LIMITED
(A Government of India Enterprise)
NEPAL ELECTRICITY AUTHORITY
MODIFIED COST ESTIMATE
PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID.
(CONSULTANCY SERVICES TO MeSEB -
DEPOSIT WORK ON COST PLUS BASIS)
TRANSMISSION LINES Length (Km)
1.0 11 KV HT LINES 6.0
Nepal Snow Portion
2.0 West Seti - Bareilly 400 KV D/C 0
Nepal Hilly Portion
1.0 400 KV D/C Karcham Wangtoo - Abdullapur 230
(Quad) Transmission Line
2.0 LILO of 400 KV D/C (ACSR Triple Snowbird) 4
Baspa - N. Jhakri TL at Karcham Wangtoo - Snow Portion
4.0 LILO of 400 KV D/C Nalagarh - Kaithal 0
(Triple Snowbird) TL at Patiala
2.0 Bareilly 400/220 KV (Extn) S/S (UPPCL)
2.0 KARCHAM WANGTOO GEN SWITCHYARD (Extn) (JHPL)
Client Cost Estimate prepared by:
M/S. MeSEB POWER GRID CORPORATION OF INDIA LTD.
(A. Govt. of India Enterprise)
ANNEXURE - 1.2.5(a)
GANGA RIVER CROSSING LOCATION : UNCHAHAR E+25 M TOWERS
BOQ FOR PILE FOUNDATIONS (TWO LOCATIONS)
SL. U N I T R A T E S (LOA) LOA (ESCALATED)U N I T R A T E S QTY/ TOWER LOC T O T A L C O S T Nos. of TOTAL
NO. DESCRIPTION UNIT REF. UNIT RATES TOWER COST
EX-WORKS CIVIL ERECTION EX-WORKS CIVIL ERECTION EX-WORKS LOC. CIVIL
1 PILE FOUNDATION
a) 1500mm dia. bored piles in all types of soil
excluding soft rock, shale etc:
i) Upto 45 M depth from cut-off level M 15,162 1,380 2 41,847,120
(b) Extra over item 1(a) for boring including socketing M 1,679 160 2 537,280
in weathered rock, fissured rock , soft rock shale
weathered rock limited to maximun depth of 5.0m
2.0 Excavation of all types of soil Cu. M. 78 3 187 30 2 11,220 106902948
3.0 Backfilling with excavated earth Cu. M. 36 3 134 5 2 1,340
5.0 R.C.C M20 Grade (Concrete for piles not covered but Cu. M. 2457 3 7,820 430 2 6,725,200
concrete in pile caps and foundation mats, pedestals,
tie beams etc. included)
1.7 i) Reinforcement Steel for piles only MT 17700 3 0 0
7.0 i) Reinforcement Steel for pile, pile cap, pedestal etc MT 17700 4 51,795 456 2 47,237,040
ii) Reinforcement Steel for pile caps, pedestals, tie-beams etc. MT 22,711 0
8.0 Mild Steel Liner supporting the Piles MT 30000 * 67,877 72.0 2 9,774,288
9.0 Conducting Standard Penetration Test (SPT) at various Nos. 210 3 1,273 70 2 178,220
elevation in Pile Borehole
10.0 Conducting Integrity Test on Pile Nos. 210 3 5,435 32 2 347,840
1.10 Mobilising one piling Rig for each tower Location Lum-sum 1395000 3 0
11.0 Design & Construction of suitable temperory working platform in mid-stream location for installation / construction of piles Nos 1395000 3 8,122,751 1 2 16,245,502
T O T A L TOTAL SUB-TOTAL 123,496,290
ANNEXURE - 1.2.5(b)
GANGA RIVER CROSSING LOCATION : ALLAHABAD E+25 M TOWERS
BOQ FOR PILE FOUNDATIONS (TWO LOCATIONS)
SL. U N I T R A T E S (LOA) LOA (ESCALATED)U N I T R A T E S QTY/ TOWER LOC T O T A L C O S T Nos. of TOTAL
NO. DESCRIPTION UNIT REF. UNIT RATES TOWER COST
EX-WORKS CIVIL ERECTION EX-WORKS CIVIL ERECTION EX-WORKS LOC. CIVIL
1 PILE FOUNDATION
a) 1500mm dia. bored piles in all types of soil
excluding soft rock, shale etc:
i) Upto 30 M depth from cut-off level M 15,162 1,520 2 46,092,480
(b) Extra over item 1(a) for boring including socketing M 1,679 160 2 537,280
in weathered rock, fissured rock , soft rock shale
weathered rock limited to maximun depth of 5.0m
2.0 Excavation of all types of soil Cu. M. 78 3 187 30 2 11,220 145436598
3.0 Backfilling with excavated earth Cu. M. 36 3 134 5 2 1,340
5.0 R.C.C M20 Grade (Concrete for piles not covered but Cu. M. 2457 3 7,820 430 2 6,725,200
concrete in pile caps and foundation mats, pedestals,
tie beams etc. included)
1.7 i) Reinforcement Steel for piles only MT 17700 3 0 0
7.0 i) Reinforcement Steel for pile, pile cap, pedestal etc MT 17700 4 51,795 787 2 81,525,330
ii) Reinforcement Steel for pile caps, pedestals, tie-beams etc. MT 22,711 0
8.0 Mild Steel Liner supporting the Piles MT 30000 * 67,877 72.0 2 9,774,288
9.0 Conducting Standard Penetration Test (SPT) at various Nos. 210 3 1,273 70 2 178,220
elevation in Pile Borehole
10.0 Conducting Integrity Test on Pile Nos. 210 3 5,435 32 2 347,840
1.10 Mobilising one piling Rig for each tower Location Lum-sum 1395000 3 0
11.0 Design & Construction of suitable temperory working platform in mid-stream location for installation / construction of piles Nos 1395000 3 8,122,751 1 2 16,245,502
T O T A L TOTAL SUB-TOTAL 162,029,940
ANNEXURE - 1.2.6(a)
TRANSMISSION LINE : 765KV S/C RANCHI-SIPAT TRANS LINE( Ckt-I,ER Portion)
YAMUNA RIVER CROSSING LOCATION : AGRA
BOQ FOR PILE FOUNDATIONS (TWO LOCATIONS)
SL. U N I T R A T E S (LOA) LOA (ESCALATED)U N I T R A T E S QTY/ TOWER LOC T O T A L C O S T Nos. of TOTAL
NO. DESCRIPTION UNIT REF. UNIT RATES TOWER COST
EX-WORKS CIVIL ERECTION EX-WORKS CIVIL ERECTION EX-WORKS LOC. CIVIL
1 PILE FOUNDATION
a) 1200mm dia. bored piles in all types of soil
excluding soft rock, shale etc:
i) Upto 30 M depth from cut-off level M 12,137 410 2 9,952,340 5232
(b) Extra over item 1(a) for boring including socketing M 3,882 80 2 621,120
in weathered rock, fissured rock , soft rock shale
weathered rock limited to maximun depth of 5.0m
2.0 Excavation of all types of soil Cu. M. 78 3 187 10 2 3,740 24477406
3.0 Backfilling with excavated earth Cu. M. 36 3 134 5 2 1,340
5.0 R.C.C M20 Grade (Concrete for piles not covered but Cu. M. 2457 3 7,820 110 2 1,720,400
concrete in pile caps and foundation mats, pedestals,
tie beams etc. included)
1.7 i) Reinforcement Steel for piles only MT 17700 3 0 0
7.0 i) Reinforcement Steel for pile, pile cap, pedestal etc MT 17700 4 51,795 76 2 7,872,840
ii) Reinforcement Steel for pile caps, pedestals, tie-beams etc. MT 22,711 0
8.0 Mild Steel Liner supporting the Piles MT 30000 * 67,877 29 2 3,936,866
9.0 Conducting Standard Penetration Test (SPT) at various Nos. 210 3 1,273 40 2 101,840
elevation in Pile Borehole
10.0 Conducting Integrity Test on Pile Nos. 210 3 5,435 16 2 173,920
11.0 Design & Construction of suitable temperory working platform in mid-stream location for installation / construction of piles Nos 1395000 3 8,122,751 1 2 16,245,502
T O T A L TOTAL SUB-TOTAL 40,896,828
ABSTRACT COST ESTIMATE
SUBSTATION SUMMARY
SL. DESCRIPTION 400/220 KV 400/220 KV 400/200 KV 400/220 KV 765/400 KV 765/400KV 400/220 KV 765/400KV TOTAL
NO. FATEHPUR GURGAON GIS AGRA BALIA SEONI SIPAT RANCHI SASARAM
NEW SUBSTATION EXTENSION SUBSTATION EXTENSION SUBSTATION EXTENSION SUBSTATION EXTENSION SUBSTATION EXTENSION SUBSTATION EXTENSION SUBSTATION EXTENSION SUBSTATION
1.1 500 MVA, 765/sqrt3/400/sqrt3/33 KV, 1PH Auto Transformer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF! #REF!
1.2 315 MVA, 400/220 KV 3PH Trfmr. #REF! 0.00 0.00 0.00 #REF! #REF! 0.00 #REF! #REF!
1.3 110MVAR, 765 KV Line Reactor 0.00 0.00 0.00 0.00 #REF! #REF! 0.00 0.00 #REF!
1.4 80MVAR, 765 KV Line Reactor 0.00 0.00 0.00 0.00 #REF! #REF! 0.00 0.00 #REF!
1.6 110 MVAR, 765KV Bus Reactor 0.00 0.00 0.00 0.00 0.00 #REF! 0.00 #REF! #REF!
1.7 80MVAR, 400 KV Line Reactor #REF! 0.00 #REF! 0.00 0.00 0.00 0.00 #REF! #REF!
1.8 50MVAR, 400 KV Line Reactor #REF! 0.00 #REF! 0.00 0.00 0.00 0.00 0.00 #REF!
Sub-Total 1.0 #REF! 0.00 #REF! 0.00 #REF! #REF! 0.00 #REF! #REF! #REF!
2 765 KV EQUIPMENT
Circuit Breaker 0.00 0.00 0.00 0.00 #REF! #REF! 0.00 #REF! #REF!
Isolator 0.00 0.00 0.00 0.00 #REF! #REF! 0.00 #REF! #REF!
Current Transformer 0.00 0.00 0.00 0.00 #REF! #REF! 0.00 #REF! #REF!
Capacitive Voltage Transformer 0.00 0.00 0.00 0.00 #REF! #REF! 0.00 #REF! #REF!
Lightning Arrestor 0.00 0.00 0.00 0.00 #REF! #REF! 0.00 #REF! #REF!
Sub-Total 2.0 0.00 0.00 0.00 0.00 #REF! #REF! 0.00 #REF! #REF! #REF! verified
400 KV EQUIPMENT
Circuit Breaker #REF! #REF! #REF! #REF! 0.00 0.00 #REF! #REF! #REF!
Isolator #REF! #REF! #REF! #REF! 0.00 0.00 #REF! #REF! #REF!
Current Transformer #REF! #REF! #REF! #REF! 0.00 0.00 #REF! #REF! #REF!
Capacitive Voltage Transformer #REF! #REF! #REF! #REF! 0.00 0.00 #REF! #REF! #REF!
Lightning Arrestor #REF! #REF! #REF! #REF! 0.00 0.00 #REF! #REF! #REF!
Sub-Total 3.0 #REF! #REF! #REF! #REF! 0.00 0.00 #REF! #REF! #REF! #REF! verified
220 KV EQUIPMENT
Circuit Breaker #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!
Current Transformer #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!
Capacitive Voltage Transformer #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!
Lightning Arrestor #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!
Sub-Total 4.0 #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF! #REF! verified
4 132 KV EQUIPMENT
Circuit Breaker 0.00
Current Transformer 0.00
Capacitive Voltage Transformer 0.00
Lightning Arrestor 0.00
Sub-Total 4 0.00 0.00 verified
7 FIXED SERIES COMPENSATION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
7 Control & Relay Panels #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8 PLCC Equipment #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10 Remote Terminal Unit (RTU) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 #REF! #REF!
9 SWITCHYARD ERECTION
Equipment Structure #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Other Equipment (Busbar matls.) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equipment Civil Works #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Erection #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Sub-Total 9 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! verified
10 SUBSTATION AUXILIARIES #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 Overhead payable to SEB 0.00 0.00 0.00 #REF! 0.00 0.00 0.00 0.00 #REF! #REF!
Total Equipment Cost #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Preliminary & Gen. Civil Works #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total Cost #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! verified
TRANSFORMER PACKAGE #REF! 0.00 0.00 0.00 #REF! #REF! 0.00 #REF! #REF!
REACTORS PACKAGE #REF! 0.00 #REF! 0.00 #REF! #REF! 0.00 #REF! #REF!
SUB-STN EQUIPMENTS PKG #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PROVISION OF TWO NOS. 220 kV BAYS FOR N.C.RAILWAY AT 765/400/220 KV FATEHPUR S/S OF POWERGRID.
ACTIVITY SCHEDULE for Qualifying Requirements for Provision of two nos. 220 kV Line Bays at 765kV Fatehpur Substation
S. NO. DESCRPTION OF ACTIVITIES DAYS
1 SITE MOBLIZATION
2 S0URCE APPROVAL, STORE CONSTRUCTION, STATUTARY COMPLIANCE SUCH AS LABOUR LICENCE , WCP, CAR POLICY ETC , LAYOUT MARKING, APPROVAL OF VENDOR
3 SITE LEVELLING
5 Submission of Drawings and documents
b OGA and Electrical Plan and Section Layouts
c Foundation and cable trench layout
d EKD, clearance and Earth Mat layout
f Control and Protection system drawings
g Power and control cable schedules
h Equipment drawings
6 Supply of Items at site (Including vendor finalization, Inspection, testing, delivery at site)
a. Circuit Breaker, CT, CVT, Isolator, Wave trap, Surge arresstor
b Control and Protection Panels
c Telecom Equipments
d Erection Hardware Items
f Power and control cables
g Towers and structures
8 COMPLETION OF EQUIPMENT FOUNDATION
9 COMPLETION OF SPR CIVIL WORK ,
a. Circuit Breaker, CT, CVT, Isolator, Wave trap, Surge arresstor
b Control and Protection Panels
c Telecom Equipments
d Erection Hardware Items
f Power and control cables
11 Commissioning
12 COMPLETION OF ROAD AND DRAIN
13 COMPLETION OF SECURITY GATE AND BOUNDARY WALL WORK and all associated work.
14 FINAL CLEANING AND HANDING OVER
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Standard_Field_Quality_Plan.pdf
pdf • 2.44 MB
474001-220kv 2BPI(SH.1 OF 1).pdf
pdf • 0.49 MB
474002-220kv 2WT(SH.1 OF 1).pdf
pdf • 0.61 MB
474003-220kv 2CVT(SH.1 OF 1).pdf
pdf • 0.45 MB
474004-220kv 2LA(SH.1 OF 1).PDF
pdf • 0.43 MB
474005-220kv 2ISO(SH.1 OF 1).pdf
pdf • 0.56 MB
474006-220kv 2CT(SH.1 OF 1).pdf
pdf • 0.57 MB
CABLE TRENCH & CROSSING DETAILS.pdf
pdf • 0.63 MB
GA Drawing.pdf
pdf • 0.33 MB
SLD.pdf
pdf • 0.20 MB
27_0 Specific Requirement_Rev 04_with Annexures.pdf
pdf • 8.80 MB
Annexure-III of section Project List of mandatory spares.pdf
pdf • 0.08 MB
Appendix-II for SAS_Rev04_STANDARD FACTORY SIMULATION TEST PLAN.pdf
pdf • 0.54 MB
LT Switchgear R5.pdf
pdf • 0.16 MB
Section - Project.pdf
pdf • 0.31 MB
Section-Sub-station Automation_Rev04.pdf
pdf • 0.98 MB
Section-Switchgear-CB_Rev11.pdf
pdf • 0.61 MB
Section-Switchgear-INST_rev11.pdf
pdf • 1.00 MB
Section-Switchgear-ISO_Rev11B.pdf
pdf • 0.11 MB
Section-Switchgear-SA_Rev12.pdf
pdf • 0.30 MB
Telecommunication equipment Rev-02.pdf
pdf • 1.76 MB
10_Air conditioning R4.pdf
pdf • 0.04 MB
11_Section_Switchyard Erection_Rev-10.pdf
pdf • 5.99 MB
12_Section Structure Rev 6.pdf
pdf • 0.10 MB
13_Civil Works Rev 11A.pdf
pdf • 2.00 MB
14_sec- CRP Rev 09.pdf
pdf • 0.37 MB
16_PLCC R5.pdf
pdf • 0.07 MB
1_0 GTR Rev 15 .pdf
pdf • 7.03 MB
7_Power & Control Cable Rev R6.pdf
pdf • 0.26 MB
8_Lighting Specification Rev.07.pdf
pdf • 4.29 MB
9_Fire Protection Rev 6.pdf
pdf • 1.97 MB
~$- (Optional) Attachment 25.docx
docx • 0.00 MB
~$- (Optional) Attachment 26.docx
docx • 0.00 MB
~$-(Optional) Attachment 26.docx
docx • 0.00 MB
0-(Mandatory) Schedule - QR.doc
doc • 0.10 MB
1-(Mandatory) First Envelope- Bid Form & Attachments.xlsx
xlsx • 1.02 MB
10 - (Mandatory) Attachment 14 - Integrity Pact.pdf
pdf • 0.20 MB
11-(Mandatory) Attachment 25 Bid Securing Declaration.docx
docx • 0.02 MB
2-Attachment-8_First Envelope.doc
doc • 0.03 MB
3-(Mandatory) Attachment 19 - Declaration by Key Managerial Person & PoA Holder.docx
docx • 0.02 MB
4-(Mandatory) Attachment 20- Affidavit for self-certification.DOCX
docx • 0.02 MB
5-(Not Applicable) Attachment 21- Certificate by Auditor.docx
docx • 0.02 MB
6-(Mandatory) Attachment 22- Compliance to eRA process.doc
doc • 0.03 MB
8-(Mandatory) Attachment 23-Declaration regarding events encountered pursuant to ITB Clause 2.1.docx
docx • 0.03 MB
9-(Mandatory) Attachment 24- Certificate by bidder.docx
docx • 0.02 MB
BOQ.XLSX
xlsx • 0.49 MB
Check List before Uploading bids.docx
docx • 0.02 MB
FINAL ACTIVITY SCHEDULE.xlsx
xlsx • 0.01 MB
~$-Annexure - A (BDS) QR Vol-I.doc
doc • 0.00 MB
~$-Annexure-I to Section-V (SCC).docx
docx • 0.00 MB
~$-Section - I IFB SSTE Vol-I.doc
doc • 0.00 MB
~$-Section - II ITB SSTE SI_SRM_March 2016.doc
doc • 0.00 MB
~$-Section - III BDS SSTE Vol -I.docx
docx • 0.00 MB
~$-Section - V SCC SSTE Vol-I.doc
doc • 0.00 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.05 MB
02-Section - II ITB SSTE SI - Sep 2018.pdf
pdf • 0.43 MB
03-Section - III BDS SSTE Vol -I.docx
docx • 0.07 MB
04-Annexure - A (BDS) QR Vol-I.doc
doc • 0.05 MB
05-Annexure - B (BDS) eRA.docx
docx • 0.02 MB
06-Annexure - C (BDS) Make in India.docx
docx • 0.02 MB
07-Annexure - D (BDS) Sample Format for eRA.docx
docx • 0.03 MB
08-Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
09-Section - V SCC SSTE Vol-I.doc
doc • 0.10 MB
10-Appendix-I to SCC.doc
doc • 0.17 MB
11-Annexure-I to Section-V (SCC).docx
docx • 0.02 MB
12-Section - VI Forms and Procedures Vol-I.doc
doc • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .