Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹38.4 L
EMD Value
₹76,800
Closing Date
4 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
SNT/C/SDAH
13 conditions · 1 needing a document upload
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. Note:- The above technical eligibility criteria shall be applicable for the instant tender work.
Similar Nature of Work - Any Telecom work involving provision of MIS/LAN / WAN / Helpline / UTS/ PRS / FOIS/ value added enquiry system / video enquiry system/ Data connectivity / Datacom equipment/ video conferencing / wireless communication/secured communication/Wi-Fi J Telecom work involving computer-based enquiry system.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
1 condition
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Telecom work in Construction office at Bhagalpur for improving connectivity and providing telecom infrastructure in connection with various doubling and new line projects in Malda Division of Eastern Railway.
SANDT-CON-04-2026-SDAH~ER
SANDT-CON-04-2026-SDAH
Open
Works - General
6 Months
Kolkata, West Bengal
₹0
₹76,800
12 Oct 2026
12 Oct 2026
21 Oct 2026
137 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 38,37,993.9 | ||
| — | 20.00 | — | — | ||
| Supply of 1 x 16(126/0.3) Sq.mm. multi strand copper power wire as per RDSO Spec. No. IRS:S-76/89 (Amdt.3) or latest. The color of the wire which is required will be specified by the Engineer in charge.Inspection: RDSO. | — | — | — | 3,460 | |
| — | 20.00 | — | — | ||
| Supply of 1 x 25 (196/0.4) Sq.mm. multi strand copper power wire as per RDSO Spec. No. IRS:S-76/89 (Amdt.3) or latest. The color of the wire which is required will be specified by the Engineer in charge.Inspection: RDSO | — | — | — | 6,840 | |
| — | 20.00 | — | — | ||
| Supply of 1 x 35 (276/0.4) Sq.mm. multi strand copper power wire as per RDSO Spec .No. IRS:S-76/89 (Amdt.3) or latest. The color of the wire which is required will be specified by the Engineer in charge.Inspection: RDSO. | — | — | — | 4,280 | |
| — | 4.00 | — | — | ||
| Supply of Carrier Rails for above 35 mm. x 7.5 mm., 1 mm./0.039 in thickness un- slotted type as per site requirement. Inspection: Consignee. | — | — | — | 512 | |
| — | 60.00 | — | — | ||
| Supply of Disconnect Terminal Block, Screw less type, 2-wire front entry (One input & One output) as per RDSO Spec. No. RDSO/SPN/189/2004 with latest amendments. The color will be decided by the Engineer - in - Charge. (Preferably In Blue, Red & Grey Colors in the ratio of 1:2:3). Inspection: RDSO. | — | — | — | 3,120 | |
| — | 1.00 | — | — | ||
| Casting, concreting and curing of concrete foundation (in ratio 1:3:6), erection and installation of full size apparatus case as per Drg. No. S&T/C-6/98(NKG). This includes the cost of all materials required for fixing holding down bolts, casting, concreting. Note: Bolts, nuts and washers, bitumen compound to be supplied by contractor and bitumen compound to be used in between apparatus case and foundation. This also includes the bottom of apparatus cases filled with sand and the outside covered with masonry work and neat cement plastering. Note: Painting the apparatus case inside and outside with one coat of red oxide, two coats of aluminium paints outside and white paint inside. | — | — | — | 13,705 | |
| — | 1.00 | — | — | ||
| Fixing by slotted angle, wiring of terminal strips, hylam strip, relays, fuses with base, fixing of HDHMR shelves for full size apparatus case with Termination & Earthing of cables and wiring with lettering both inside and outside as required including supply of slotted angles, ferrules for marking and miscellaneous materials per location to be supplied by contractor (all materials except Wires, relay, terminal strips, Bakelite strip, fuses with base and HDHMR shelves to be supplied by the contractor). It includes letter painting both inside and outside as per ER practice. NB- Multi strand cables and power cable to be terminated with proper lugs and required buss bar etc. to be supplied by the contractor. Inspection: Consignee. | — | — | — | 6,089 | |
| — | 1.00 | — | — | ||
| Supply of Phenolic laminated Sheet/Hylam sheet, grade P3 in standard size of 1220 X 1220 x 10 mm. as per Spec. No. IS 2036 of 1995 or latest. Test report of manufacture to be supplied.Inspection: RITES/Consignee. | — | — | — | 5,552 | |
| — | 12.00 | — | — | ||
| Supply of Light class GI pipes 50 mm. dia. (thickness 2.9 mm) as per IS 1239 (Part1):2004 or Latest with socket & coupling.Inspection : RITES/Consignee. | — | — | — | 7,656 | |
| — | 12.00 | — | — | ||
| Laying & Fixing of GI pipes 50 mm./100 mm. as per IS 1239 (Part1):2004 with socket & coupling on culverts and bridges. It includes installation of all material required for fixing arrangement. The contractor will install a flexible/corrugated HDPE pipe at the end of the GI pipe along with any masonry work (if required) to protect the cables from sharp edges and sudden bends. | — | — | — | 4,320 | |
| — | 3.00 | — | — | ||
| Supply of 40 mm. dia. permanently lubricated HDPE telecom: ducts (with chord) as per RDSO Spec. No. RDSO/SPN/TC/45/2013 Rev.2.0 with latest amendments or Latest in length of 1000 mtrs./roll For each km. of HDPE duct following items are to be supplied (a) end plugs-2 nos. (b) cable sealing plugs - 2 nos. (c) plastic couplers slip fit/push fit type-2 nos. (d) end plugs to be provided along with drum 2 nos. Color to be specified by Railways. Inspection : RITES/Consignee. | — | — | — | 2,38,788 | |
| — | 3.00 | — | — | ||
| Laying of HDPE/DWC/GI Pipes. | — | — | — | 22,770 | |
| — | 3.00 | — | — | ||
| Blowing of armoured optic fiber cable (OFC Cable supplied by Railways) into the HDPE duct by using a blowing machine and associated works. 10% of OFC length to be blown extra on both ends of Duct i.e. total 20% of Duct length. Before blowing the duct integrity shall be tested. The payment shall be made after ensuring duct integrity and corrective action wherever required at his own cost. Payment will be made as per the length of Duct from which OFC is Blown. | — | — | — | 41,850 | |
| — | 900.00 | — | — | ||
| Arranging of HDD machine with accessories including handling/laying of Pipes and preparation of site and boring (boring size upto 175 mm.) at track crossing/ pucca road crossing, boring trench shall be minimum 01(one) meter below the track/road/pucca road crossing area. Required pipes shall be supplied by Railways. Payment shall be made after laying of required cables & sealing/plugging of vacant pipes. | — | — | — | 17,51,400 | |
| — | 30.00 | — | — | ||
| Breaking of metal/tar road and refilling after laying the cables. Repair of pucca roads to original state in level crossing area after cable laying. | — | — | — | 8,850 | |
| — | 2.00 | — | — | ||
| Excavation of trench at a of Depth of 1200 mm. and width of 300 mm., including marking of cable alignment, clearing of jungle, roots of trees, bushes, refilling with excavated soil, ramming and consolidation after laying of cables complete to the finished item of work in all type of Soil. NOTE: In case 1.2 m. depth of the trench is not achievable due to site conditions approval of officer in charge is to be obtained and payment shall be made on a prorate basis. | — | — | — | 1,95,644 | |
| — | 30.00 | — | — | ||
| Trenching under Rails for crossing the track (Track Crossing) and refilling of trenches. The track crossing shall be done at right angles. The depth of the cable trench shall be 1.2 meter below the rail flange. The ballast shall be stacked separately while making the trench and the earth soil shall be stacked separately. While re-filling the trench, the earth soil has to be filled first to the ground level and the ballast has to be properly put in the track. This work has to be done under supervision of the supervisor of S&T. | — | — | — | 33,840 | |
| — | 200.00 | — | — | ||
| Cutting of platform surface (tile/slab/concrete) for a depth of 20 cm. & width of 10 cm.& refilling /reconditioning/ repairing the platform after laying pipe & cable. Cutting should be done with marble cutting machine in proper manner & restore the same as before in such a manner that the aesthetic of PF is not disturbed. | — | — | — | 87,400 | |
| — | 2000.00 | — | — | ||
| Laying of S&T Cables of various cores/pairs/quads in trenches/GI pipes/RCC pipes/DWC pipes/Trunking. | — | — | — | 14,000 | |
| — | 2.00 | — | — | ||
| Testing of insulation/Meggering of cable laid, before and after laying (before closing of trench), per cable. | — | — | — | 632 | |
| — | 6.00 | — | — | ||
| Testing of insulation/Meggering of cable after termination, per cable. | — | — | — | 504 | |
| — | 15.00 | — | — | ||
| Cement concrete work for miscellaneous items in the ratio 1:3:6. Items include ramming, curing and plastering with cement & sand mixture (aggregate not exceeding 3.8 cm.) (Aggregate cement & sand to be supplied by the contractor). | — | — | — | 67,995 | |
| — | 10.00 | — | — | ||
| Breaking of Hard rock by Hydraulic excavator/manual means over areas (exceeding 30 cm. in depth, 1.5 m. in width as well as 10 Sq. m. on plan) including getting out and disposal of excavated earth lead up to 50 m. and lift up to 1.5 m., as directed by Engineer-in charge | — | — | — | 8,050 | |
| — | 4.00 | — | — | ||
| Supply of Tinned Copper LUGs for fitting in Cable Size : 16 Sq.mm., Barrel Inner Dia: 6.4 mm., Barrel Outer Dia 8.0 mm., Barrel Length: 12.2 mm., Stud Hole Center Dia: 10 mm., Palm Width: 12.6 mm., Thickness: 1.8 mm., Lug Length: 28-30 mm., Thimble Type: Ring.Inspection: Consignee. | — | — | — | 64 | |
| — | 4.00 | — | — | ||
| Supply of Tinned Copper LUGs for fitting in Cable Size : 35 sq. mm., Barrel Inner Dia :13 mm., Barrel Outer Dia: 17 mm., Barrel Length: 12.2 mm., Stud Hole Center Dia: 10 mm., Palm Width: 12.6 mm., Thickness: 1.8 mm., Lug Length: 28-30 mm., Thimble Type: Ring.Inspection: Consignee. | — | — | — | 140 | |
| — | 2.00 | — | — | ||
| Supply of Copper bonded steel electrode of 3.0 m. long, 17.2 mm. dia. with copper bonding thickness of minimum macrons and UL listed as per RDSO Spec. No RDSO/SPN/197 Ver.1.0 or latest and conforming to RDSO Drg. No. SDO/RDSO/E&B/001 or Latest. Necessary testing certificate of UL, IEC to be produced.Inspection: RDSO. | — | — | — | 9,716 | |
| — | 2.00 | — | — | ||
| Supply of Copper Strip 25 X 6 mm. Inspection: RDSO. | — | — | — | 1,746 | |
| — | 2.00 | — | — | ||
| Supply of Copper tape for BRC(25 X 2) mm.Inspection: RDSO. | — | — | — | 634 | |
| — | 60.00 | — | — | ||
| Supply of Earth Enhancement material for treatment of earth pits as per Specification No. RDSO/SPN/197/2016 Ver.1.0 or latest.Inspection: RDSO. | — | — | — | 8,820 | |
| — | 2.00 | — | — | ||
| Installation of Unit Maintenance Free Earth. It includes (i) Digging the earth in normal soil to the required depth.(ii) Insertion of electrode. (iii) Filling of earth enhancing compounds (Approx.30 Kg.) (iv) This also includes supply of CC cover 1.5 ft. x 1.5 ft. 1 ft. wall thickness 2 inch with cover 3 inch thickness. | — | — | — | 7,522 | |
| — | 50.00 | — | — | ||
| Supply of 50 mm. x 6 mm. GI tape for interconnecting earth electrodes. Inspection: RDSO. | — | — | — | 27,050 | |
| — | 2.00 | — | — | ||
| Supply and Execution of Exothermic Welds for more than 16 sq. mm. wire. This includes a Welding Kit, Welding Powder, Mould and other necessary materials.Note - No. in unit column indicates per welding.Inspection: RDSO. | — | — | — | 996 | |
| — | 4.00 | — | — | ||
| Installation of MEEB/SEEB/BRC with the insulators (As per the instruction of Site Engineer). Fitting materials & Insulator (Dough Moulding Compound Conical type of different Size) as per the site requirement to be supplied by the contractor.Note: 'No' in the unit column indicates 'per insulator'. | — | — | — | 128 | |
| — | 4.00 | — | — | ||
| Supply of Nut Bolts, Washer (Stainless Steel) as per the site requirement (One set consists of 1 Nut, 1Bolt, 2 washer & 2 spring washer)Note: Hex Nuts, bolts and washers of size 5/16".Inspection: Consignee. | — | — | — | 108 | |
| — | 2.00 | — | — | ||
| Fixing of earth electrode including laying and installation of MS flat of size 35 mm. x 6 mm. with length 5 mtr. or as per extant practice of Eastern Railway. As per PCSTE/ER's Drg. No. SI/TYP/0097 dated 25.03.2025 or latest. For apparatus cases, signal post & other equipment as per instruction of site engineer. Provision for fixing MS flat at apparatus cases/ signal post/other equipment should be made by the firm at site. Where required necessary holes to be drilled on the MS Flat. Full threaded bolts of 10 mm. dia. and length 40 mm should be welded in the apparatus cases in such a way that the MS flat at the apparatus case end can be fixed from outside or from inside (bolts of 10 mm. dia. and length 40 mm. should be supplied by the contractor). Welding arrangement with accessories and welding materials should be arranged by the contractor for fixing of bolts at equipment end where required as per instruction of site engineer. All hardware and other miscellaneous materials required for installation to be supplied by the contractor except earth electrodes and MS flat. Sig. Cable as provided by Railway is also to be laid and terminated on Earth Electrode and to GI Wire/GI Flat in Location Box. | — | — | — | 2,928 | |
| — | 4.00 | — | — | ||
| Provision of cement concrete enclosure for earth electrodes as per CSTE/ERs (Drg. No. SI/TYP/0097 dated 25.03.25).Inspection: Consignee. | — | — | — | 2,880 | |
| — | 2.00 | — | — | ||
| Earthing and soldering of cable armour (PER CABLE). | — | — | — | 62 | |
| — | 500.00 | — | — | ||
| Supply of OFC single mode 6 fiber armoured cable, conforming to TEC Spec. No. GR / OFC02 / 03.SEP.2003 or Latest. Inspection: RITES/Consignee. | — | — | — | 16,000 | |
| — | 3.00 | — | — | ||
| Supply of 24 Fiber Armoured Optical Fiber Cable as per Specification No. SPN/TC/110/2020 Rev.0 or latest.Inspection: RDSO/Consignee. | — | — | — | 2,58,198 | |
| — | 15.00 | — | — | ||
| Supply of OFC SC/SC Patch Cord 5 m Length. Inspection: Consignee. | — | — | — | 3,045 | |
| — | 10.00 | — | — | ||
| Supply of SC-LC patch cord 5 m. Inspection: Consignee. | — | — | — | 2,050 | |
| — | 10.00 | — | — | ||
| Supply of LC-LC patch cord 5 m. Inspection: Consignee. | — | — | — | 2,040 | |
| — | 20.00 | — | — | ||
| Supply of RJ-45 Connector for CAT-6 cable.Inspection: Consignee. | — | — | — | 160 | |
| — | 5.00 | — | — | ||
| Supply of Fiber Distribution Management System (FDMS-6F) 06 port, Single Mode, Simplex Fiber Optic Patch Panels, 19 inch 1 U Rack Mountable with SC connector with all accessories, Make: Syrotech/Drone Edge/Digisol or similar. Model: SY-LIU-6-XXX/similar. Inspection: RITES/Consignee. | — | — | — | 43,825 | |
| — | 2.00 | — | — | ||
| Supply of Fiber Distribution Management system (FDMS)/LIU for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. GR/FDM/01/02 April '2007 or latest. This includes supply of installation accessories as per technical specification.Inspection: RITES/Consignee. | — | — | — | 7,272 | |
| — | 2.00 | — | — | ||
| Installation, splicing and commissioning of Fiber Distribution Management system (FDMS) for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. with the latest amendment. The sundry material if required any to be supplied by the contractor. | — | — | — | 26,284 | |
| — | 5.00 | — | — | ||
| Jointing, terminating and Splicing of 6 Fiber Optical Fiber Cable and fixing of termination box/FDF/placing of joint closures in pit required at various location including transportation of all the jointing & amp; terminating materials from railway store to the works site and returning left over materials to the railway store. The rate should include all jointing materials. | — | — | — | 11,665 | |
| — | 2.00 | — | — | ||
| Supply of 24 fiber optical fiber cable straight joint enclosure (SJC) complete with all accessories along with enclosures with heat shrinkable splice protection sleeve as per RDSO Spec. RDSO/SPN/TC68/2014 Revision 1.0, Amdt.1.0 or latest. Splice losses in no case should be more than 0.1 db.Inspection: RITES/Consignee. | — | — | — | 11,010.9 | |
| — | 2.00 | — | — | ||
| Jointing, terminating & splicing of 24 fiber optic fiber cable and fixing of termination box/FDF/placing of joint closures in the pit required at various locations including transportation of all the jointing & terminating materials from railway store to the work site and returning leftover materials to the railway store. | — | — | — | 21,454 | |
| — | 5.00 | — | — | ||
| Supply Installation & Commissioning of Layer 2 Manageable, 24 Port POE, 24 GE10/100/1000 Base X Ethernet port with POE+ support and 4x1GE SFP Port for uplink with 4 no of 1GE SFP modules loaded, with all accessories as per RDSO/SPN/TC/83/2020, Rev.2.0 or latest. Inspection: RDSO/Consignee. | — | — | — | 1,43,830 | |
| — | 10.00 | — | — | ||
| Supply of SFP Cu 1G 10/100/1000 Base T Copper Ethernet Transceiver SFP Module with all accessories.Inspection : RDSO/Consignee. | — | — | — | 75,980 | |
| — | 6.00 | — | — | ||
| Supply & installation of Rack 19" wall mount 6U/500MM D with front glass door and lock and key including the following:1. I U Cable manager - I No.2. 1 U Cantilever tray - I No.3. AC distribution box 5X5 amps - I No.4. Front panel H/W PKT of 10 Sets - I No.5. Cooling fan of 230V AC operated.Inspection : Consignee. | — | — | — | 41,034 | |
| — | 630.00 | — | — | ||
| Supply of FR CAT-6 UTP Cable suitable for 10BASE-T/100BASETX/and 1000BASE- T(Gigabit Ethernet). Make: DLINK/AMP/Avaya/Krone/Bestnet/Aambernet. Inspection: RITES/Consignee. | — | — | — | 15,750 | |
| — | 10.00 | — | — | ||
| Supply and installation of Input/Output Box for termination of CAT-6 Cable.Inspection: RITES/Consignee. | — | — | — | 2,970 | |
| — | 2.00 | — | — | ||
| Supply and installation of Gigabit Media converter.Inspection: RITES/Consignee. | — | — | — | 24,948 | |
| — | 10.00 | — | — | ||
| Supply of RJ-45 CAT-6 Patch cord 2M length.Inspection: RITES/Consignee. | — | — | — | 2,410 | |
| — | 610.00 | — | — | ||
| Laying of STP/UTP CAT-6/Power Cable/LS cable through flexible PVC Conduit Pipe/GI Pipe/HDPE Pipe (where necessary) as per direction of the Rly. Representative, including any fixing of cables/PVC pipe/PVC Casing on wall/shed with suitable clamps (the clamps and screws should be made of Stainless steel). All the fixing materials including Collar, bend, junction etc. shall be supplied by the contractor. This also includes transportation of cable, PVC Pipe, GI Pipe, HDPE Pipe etc. to the site. | — | — | — | 11,590 | |
| — | 2.00 | — | — | ||
| Supply & Installation of Wi-Fi Access Point with controller. Specification: as per RCIL's documents as referred to by RB's letter No. 2018/Transcell/Health/HMIS dated 26.10.2020.Inspection: RITES/Consignee. | — | — | — | 76,048 | |
| — | 10.00 | — | — | ||
| Supply of single line RJ-11 Rosette box.Inspection: Consignee. | — | — | — | 320 | |
| — | 10.00 | — | — | ||
| Push button corded auto telephone with Caller ID facility of Beetel, Panasonic or Binatone make.Inspection: Consignee. | — | — | — | 26,420 | |
| — | 4.00 | — | — | ||
| Supply of Digital Clock suitable for Office Complex with GPS Synchronization in standalone mode as per Clause 6 of RDSO SPN TC 62/2008, (Rev.3.0) Amdt.2 or latest.Inspection: RDSO/Consignee. | — | — | — | 53,368 | |
| — | 100.00 | — | — | ||
| Supply of power cable 3 core 2.5 Sq. mm. multi strand (36/0.3 mm. dia.) cable as per IS 694:1990 reaffirmed 1995 or latest suitable for railway electrification area shall be of reputed make like Delton, LAPP, Finolex, or Similar. Inspection: Consignee. | — | — | — | 7,700 | |
| — | 300.00 | — | — | ||
| Supply and fixing of different sizes of PVC casing /Pipes as required by Railway at site by fixing/clamping to the wall for indoor wiring purposes. All the material required for fixing PVC casing/Pipes are to be supplied by the contractor.Inspection : Consignee. | — | — | — | 14,700 | |
| — | 4.00 | — | — | ||
| Supply of LaserJet Mono Printer for A4 Paper Size as per following specifications. Connectivity USB & Wi-Fi, monochrome, Mobile Printing Capability through smart app, Print Speed Black - Up to 21 ppm., Duty Cycle monthly - Up to 10,000 pages, function type - print only. Make: HP/Canon/Epson or better.Inspection: RITES/Consignee. | — | — | — | 55,556 | |
| — | 5.00 | — | — | ||
| Supply of desktop/All in one PC as per following specifications: Intel i3, 12th generation or better, RAM - 8 GB, SSD - minimum 256 GB, display - 21.5 inch, Window-10 or higher, graphics Type - integrated, Keyboard and mouse - wireless. Make: HP/Lenovo/Dell or better. Inspection: RITES/Consignee. | — | — | — | 2,53,965 | |
| — | 500.00 | Vehicle Km | — | ||
| Transportation of materials from any Stores to Site and vice-versa including loading and unloading.(A) Lead up to 50 Kms. | — | — | — | 5,500 | |
| — | 500.00 | Vehicle Km | — | ||
| Transportation of materials from any Stores to Site and vice-versa including loading and unloading.(B) Lead above 50 Kms. | — | — | — | 3,500 | |
| — | 50.00 | Man-Days | — | ||
| Arranging unskilled labour at S&T Stores for loading/ unloading/stacking of departmental materials. | — | — | — | 29,350 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022_1.pdf
ATTACHMENT
GCCACS1.pdf
ATTACHMENT
GCCACS-3_1.pdf
ATTACHMENT
GCCACS-4.pdf
ATTACHMENT
GCCACS-5.pdf
ATTACHMENT
GCCACS-6.pdf
ATTACHMENT
GCCACS-7.pdf
ATTACHMENT
GCCACS-8.pdf
ATTACHMENT
GCCACS-9.pdf
ATTACHMENT
GCCACS-10.pdf
ATTACHMENT
Guidelinemicrotunnelingwork.pdf Micro tunnelling guide line
ATTACHMENT
TechnicalCirculears.pdf
ATTACHMENT
TenderDocument.pdf
ATTACHMENT
Guidelinemicrotunnelingwork.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .