| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L | L1 | Accepted-AOC as per upload |
| 2 | L2₹7.7 L+₹5,133.65 (0.67%)Rejected-Finance | ₹7.7 L+₹5,133.65 (0.67%) | L2 | Rejected-Finance AS PER UPLOAD |
| 3 | L4₹8.0 L+₹30,016.96 (3.92%)Rejected-Finance | ₹8.0 L+₹30,016.96 (3.92%) | L4 | Rejected-Finance AS PER UPLOAD |
| 4 | L5₹8.2 L+₹56,283.85 (7.36%)Rejected-Finance | ₹8.2 L+₹56,283.85 (7.36%) | L5 | Rejected-Finance AS PER UPLOAD |
| 5 | L6₹8.5 L+₹84,923.55 (11.1%)Rejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | ₹8.5 L+₹84,923.55 (11.1%) | L6 | Rejected-Finance AS PER UPLOAD |
| Sl No | Description | Qty | Unit | M/S ADITYA CONSTRUCTION COMPANY L6 | M/S SINGH CONSTRUCTION COMPANY L13 | M/S JAI CONSTRUCTION L7 | M/S BHAGWATI TRADERS L9 | devendra kumar pandey L12 | SRI RAM PRAKASH SINGH L14 | M/S RAM SHANKAR YADAV CONSTRUCTION CO. L4 | M/S SHYAM CONSTRUCTION L10 | GARIMA INFRASTRUCTURE L11 | ADYA PRASAD L1 | M/S ANIL KUMAR BARNWAL THEKEDAR L5 | OM JI SINGH CONTRACTOR L8 | M/S ONKAR NATH DWIVEDI L15 | M/S OM SAI TRADERS L2 | VATS CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantilling brick work including stacking of materials as directed by engineer -incharge within a distance of 60 M. | 60.47 | Cum | 300 ₹18,141 | 370 ₹22,373.9 | 415 ₹25,095.05 | 590 ₹35,677.3 | 250 ₹15,117.5 | 300 ₹18,141 | 285 ₹17,233.95 | 200 ₹12,094 | 60 ₹3,628.2 Lowest | 364.8 ₹22,059.46 | 400 ₹24,188 | 410.97 ₹24,851.36 | 400 ₹24,188 | 220 ₹13,303.4 | 280 ₹16,931.6 |
| 2.00 | Dismantaling reinforced cement concrete including stacking of dismantled materials as directed by engineer -incharge within a distance of 60 M. | 21.78 | Cum | 500 ₹10,890 | 500 ₹10,890 | 546 ₹11,891.88 | 698 ₹15,202.44 | 400 ₹8,712 | 500 ₹10,890 | 337 ₹7,339.86 | 400 ₹8,712 | 110 ₹2,395.8 Lowest | 480 ₹10,454.4 | 500 ₹10,890 | 540.75 ₹11,777.53 | 550 ₹11,979 | 350 ₹7,623 | 400 ₹8,712 |
| 3.00 | Earth work in digging foundation in all type of soil and refilling of trenches, proper disposal of earth upto 30 mtr lead. | 228.34 | Cum | 100 ₹22,834 | 50 ₹11,417 Lowest | 74 ₹16,897.16 | 58 ₹13,243.72 | 80 ₹18,267.2 | 85 ₹19,408.9 | 61.9 ₹14,134.25 | 60 ₹13,700.4 | 50 ₹11,417 Lowest | 65.28 ₹14,906.04 | 60 ₹13,700.4 | 73.54 ₹16,792.58 | 70 ₹15,983.8 | 75 ₹17,125.5 | 60 ₹13,700.4 |
| 4.00 | Cement concrete 1:3:6 in base for PCC work including stone ballast, coarse sand & aggregate including the cost of cement | 12.84 | Cum | 5,500 ₹70,620 | 10,000 ₹1,28,400 | 8,500 ₹1,09,140 | 5,990 ₹76,911.6 | 7,000 ₹89,880 | 9,200 ₹1,18,128 | 5,511 ₹70,761.24 | 9,000 ₹1,15,560 | 4,800 ₹61,632 Lowest | 7,603.04 ₹97,623.03 | 6,500 ₹83,460 | 8,565.3 ₹1,09,978.44 | 9,050 ₹1,16,202 | 6,800 ₹87,312 | 7,800 ₹1,00,152 |
| 5.00 | Ist class brick work in (1:4) cm with coarse sand & new bricks including the cost of all material, labour T&P etc. including the cost of cement | 68.26 | Cum | 6,000 ₹4,09,560 | 7,200 ₹4,91,472 | 5,400 ₹3,68,604 | 6,000 ₹4,09,560 | 6,150 ₹4,19,799 | 6,800 ₹4,64,168 | 4,840 ₹3,30,378.4 Lowest | 5,570 ₹3,80,208.2 | 7,200 ₹4,91,472 | 4,844.1 ₹3,30,658.27 | 5,500 ₹3,75,430 | 5,457.18 ₹3,72,507.11 | 7,100 ₹4,84,646 | 4,900 ₹3,34,474 | 5,000 ₹3,41,300 |
| 6.00 | Centering and shuttering for R.C.C work including cost of materials | 76.13 | Sqm | 400 ₹30,452 | 500 ₹38,065 | 728 ₹55,422.64 | 198 ₹15,073.74 Lowest | 500 ₹38,065 | 700 ₹53,291 | 850 ₹64,710.5 | 500 ₹38,065 | 380 ₹28,929.4 | 640 ₹48,723.2 | 500 ₹38,065 | 721 ₹54,889.73 | 425 ₹32,355.25 | 450 ₹34,258.5 | 600 ₹45,678 |
| 7.00 | Cutting, bending, binding and placing of reinfocement including cost of binding wire, steel with labour T&P etc. | 1.39 | MT | 70,000 ₹97,300 | 6,600 ₹9,174 Lowest | 54,908 ₹76,322.12 | 72,000 ₹1,00,080 | 65,000 ₹90,350 | 63,194 ₹87,839.66 | 52,994 ₹73,661.66 | 64,000 ₹88,960 | 55,000 ₹76,450 | 42,395.73 ₹58,930.06 | 60,000 ₹83,400 | 47,761.44 ₹66,388.4 | 61,000 ₹84,790 | 61,500 ₹85,485 | 50,000 ₹69,500 |
| 8.00 | Reinforced Cement concrete 1:1.5: 3 on slab including stone ballast ,coarse sand & aggregate including the cost of cement | 20.77 | Cum | 8,000 ₹1,66,160 Lowest | 11,500 ₹2,38,855 | 8,500 ₹1,76,545 | 9,000 ₹1,86,930 | 9,000 ₹1,86,930 | 9,900 ₹2,05,623 | 9,700 ₹2,01,469 | 10,000 ₹2,07,700 | 9,600 ₹1,99,392 | 8,050.01 ₹1,67,198.7 | 8,500 ₹1,76,545 | 9,068.83 ₹1,88,359.6 | 9,700 ₹2,01,469 | 8,300 ₹1,72,391 | 8,500 ₹1,76,545 |
| 9.00 | Cement pointing (1:2) (ruled or stuck )/ m2 including coarse sand including the cost of cement | 72.68 | Sqm | 100 ₹7,268 | 120 ₹8,721.6 | 150 ₹10,902 | 102 ₹7,413.36 | 100 ₹7,268 | 121 ₹8,794.28 | 160 ₹11,628.8 | 120 ₹8,721.6 | 100 ₹7,268 | 114.51 ₹8,322.5 | 130 ₹9,448.4 | 129.02 ₹9,377.32 | 110 ₹7,994.8 | 90 ₹6,541.2 Lowest | 90 ₹6,541.2 Lowest |
| 10.00 | S/F sign board | 1 | Jobs | 4,500 ₹4,500 | 5,000 ₹5,000 | 4,800 ₹4,800 | 7,000 ₹7,000 | 5,000 ₹5,000 | 4,400 ₹4,400 | 2,100 ₹2,100 | 5,000 ₹5,000 | 500 ₹500 Lowest | 4,480 ₹4,480 | 5,000 ₹5,000 | 5,047 ₹5,047 | 6,900 ₹6,900 | 4,500 ₹4,500 | 3,500 ₹3,500 |
Tender Value
₹11.8 L
EMD Value
₹24,000
Closing Date
10 Dec 2025, 12:00 pmClosed
Executive Engineer Saryu Nahar Khand-4,Basti (U.
Executive Engineer Saryu Nahar Khand-4,Basti (U.
Reconstruction of VRB on Pakadi Dy. At km. 6.800
2025_UPIDC_1095670_18
05/EE/2025-26
Open Tender
Civil Works
Item Rate
60 days
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹750
₹24,000
11 Sept 2026
4 Dec 2025
10 Dec 2025
4 Dec 2025
10 Dec 2025
4 Dec 2025
Amount
Dismantilling brick work including stacking of materials as directed by engineer -incharge within a distance of 60 M.
Dismantaling reinforced cement concrete including stacking of dismantled materials as directed by engineer -incharge within a distance of 60 M.
Earth work in digging foundation in all type of soil and refilling of trenches, proper disposal of earth upto 30 mtr lead.
Cement concrete 1:3:6 in base for PCC work including stone ballast, coarse sand & aggregate including the cost of cement
Ist class brick work in (1:4) cm with coarse sand & new bricks including the cost of all material, labour T&P etc. including the cost of cement
Centering and shuttering for R.C.C work including cost of materials
Cutting, bending, binding and placing of reinfocement including cost of binding wire, steel with labour T&P etc.
Reinforced Cement concrete 1:1.5: 3 on slab including stone ballast ,coarse sand & aggregate including the cost of cement
Cement pointing (1:2) (ruled or stuck )/ m2 including coarse sand including the cost of cement
S/F sign board
S/Fixing joint filler board 20 mm thick ( Thermacoal) /m2
S/fixing of water spout /nos
M/S OM SAI TRADERS (BID ID -5730863)
VATS CONSTRUCTION (BID ID -5727732)
M/S RAM SHANKAR YADAV CONSTRUCTION CO. (BID ID -5722210)
M/S ANIL KUMAR BARNWAL THEKEDAR (BID ID -5726677)
M/S ADITYA CONSTRUCTION COMPANY (BID ID -5729575)
M/S JAI CONSTRUCTION (BID ID -5730472)
OM JI SINGH CONTRACTOR (BID ID -5725987)
M/S BHAGWATI TRADERS (BID ID -5730611)
M/S SHYAM CONSTRUCTION (BID ID -5726519)
GARIMA INFRASTRUCTURE (BID ID -5730443)
devendra kumar pandey (BID ID -5725896)
M/S SINGH CONSTRUCTION COMPANY (BID ID -5730244)
SRI RAM PRAKASH SINGH (BID ID -5731354)
M/S ONKAR NATH DWIVEDI (BID ID -5725108)
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_2017239.xls
BOQ • 0.23 MB
BID.pdf
Tender Documents • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .