| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance accepted | |
| 2 | L2₹1.8 L+₹2,886.13 (1.66%)Rejected-Finance | L2 | Rejected-Finance highest amount quoted |
| Sl No | Description | Qty | Unit | S DURAI L2 | T.Mutharasan L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 22 | M3 | 143.51 ₹3,157.22 | 140.93 ₹3,100.46 Lowest |
| 2.00 | Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 10 | M3 | 4,961.32 ₹49,613.2 | 4,872.11 ₹48,721.1 Lowest |
| 3.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
For footing & side wall | 48 | M3 | 315.52 ₹15,144.96 | 309.85 ₹14,872.8 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 13 | M3 | 6,321.4 ₹82,178.2 | 6,227.18 ₹80,953.34 Lowest |
| 5.00 | GST 18% | 1 | Nos | 27,016.84 ₹27,016.84 | 26,576.59 ₹26,576.59 Lowest |
Tender Value
₹9 L
Closing Date
6 Mar 2026, 3:00 pmClosed
commissioner
pernambut municipality Pernambut
construction of cement concrete road with drain at bagar hussain street in ward 19
2026_MAWS_665044_1
1702/2025/E1
Open Tender
Civil Works
Works
30 days
bagar hussain street
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Yes
13 Oct 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 22 | M3 | - | - |
| 2 | Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 10 | M3 | - | - |
| 3 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
For footing & side wall | 48 | M3 | - | - |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 13 | M3 | - | - |
| 5 | GST 18% | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_798694.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_798694.xls
BOQ • 0.30 MB
corrigendum1.pdf
PDF • 0.39 MB
corrigendum.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .