Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | -32.00% | ₹1.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | -32.00% | ₹1.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -30.51% | ₹1.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -20.51% | ₹1.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | +4.00% | ₹2.5 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.4 L
EMD Value
₹4,825
Closing Date
20 Aug 2026, 6:00 pmClosed
EE WR Division Karauli
EE WR Division Karauli
Emergent and urjent work of rajoli dam sub division hindaun city section todabhim year 2026 27
2026_WRDAS_588530_1
NIT 04/2026-27
Open Tender
Civil Works
Percentage
30 days
under jurisdiction of EE Karauli Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
as per nit
₹4,825
Yes
21 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | UNSKILLED Beldar/ Coolie / Chowkidar / Water man / Earth- dresser | 180 | Per Day | 300 | ₹54,000 |
| 2 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 29,250 | Sqm | 1.45 | ₹42,412.5 |
| 3 | Supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complete. Plastic bag | 1,000 | Each | 16 | ₹16,000 |
| 4 | Labour charges for making coffer dam/ring bund (under flowing / stagnate water pool) by loading transporting earth filled cement bags dropping at required locations in water including lead up to 3 km and lift up to 8 meter from NSL complete (excluding cost of earth filled cement bags). | 1,000 | bag | 26 | ₹26,000 |
| 5 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m ( Km) Deduct in item no 16 (a) to (d) above if Standard Proctor s density to be achived is at least 90% | 794.14 | Cum | 97.5 | ₹77,428.65 |
| 6 | Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor) | 794.14 | Cum | 21 | ₹16,676.94 |
| 7 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 794.14 | Cum | 11 | ₹8,735.54 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_1045101.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].