Loading…
Loading…
Tender Value
₹3.3 Cr
EMD Value
₹1.8 L
Closing Date
16 Jul 2026, 3:30 pm
superintending engineer
SIPCOT Head office Egmore Chennai
Formation of 4th cross roads 7.50m wide ) with RCC Drains , culverts and street lights at SIPCOT Medical Device Park, Oragadam-Phase-II
2026_SIPCT_683359_1
NIT.No.02/CD/T.No.02/2026-27
Open Tender
Civil Works
SIPCOT Medical Device Park, Oragadam
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹1.8 L
SIPCOT Head office
1 Jul 2026
1 Jul 2026
17 Jul 2026
1 Jul 2026
16 Jul 2026
9 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road works | |||||
| 1.01 | Clearing Light jungle and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc., complete complying with standard specification and as directed by SIPCOT Officers. | 2,100 | cum | - | - |
| 1.02 | Supplying and laying of 600 mm dia. RCC non pressure spun pipes with socket and spigot ends - NP 3 class as per IS 458/2003 manufactured with sulphate resistance cement with 12mm Hi - alumina lining with rubber rings including labour charges for laying at proper levels and locations, transportation cost, jointing materials etc.,complete complying with standard specification and as directed by SIPCOT Officers. | 11 | Rm | - | - |
| 1.03 | Forming embankment using Carted earth having minimum CBR of 8% with a lead of 20 Km which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 250 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 95% proctor density for the soil below the top of 0.5 meter height of subgrade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 95% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification . (Forming Embankment at 95% Compaction) etc., complete complying with standard specification and as directed by SIPCOT Officers. | 2,200 | cum | - | - |
| 1.04 | Forming Subgrade using Carted earth having minimum CBR of 8% ( with a lead of 20 Km )which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification. (Forming Subgrade at 97% Compaction) etc., complete complying with standard specification and as directed by SIPCOT Officers. | 1,750 | cum | - | - |
| 1.05 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 etc., complete complete complying with standard specification and as directed by SIPCOT Officers. | 950 | cum | - | - |
| 1.06 | Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 150mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 etc., complete complying with standard specification and as directed by SIPCOT Officers. | 675 | cum | - | - |
| 1.07 | Providing and laying Prime coat over wet mix macadam surface using 7.00 Kg bitumen emulsion for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 502 of MORT & H specifications.etc., complete complete complying with standard specification and as directed by SIPCOT Officers. | 2,575 | Sqm | - | - |
| 1.08 | Providing and laying Tack coat over treated wet mix macadam surface using 2.50 Kg bitumen emulsion to cut back for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 503 of MORT & H specifications.etc., complete complete complying with standard specification and as directed by SIPCOT Officers. | 2,575 | Sqm | - | - |
| 1.09 | Providing, laying 120mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG40 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5. and as per directed SIPCOT Officers.(Grade I) etc., complete complete complying with standard specification and as directed by SIPCOT Officers. | 310 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
ANNEXUREII.pdf
Tender Documents • 1.18 MB
ANNEXUREI.pdf
Tender Documents • 0.59 MB
BOQ_821424.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid