Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAdmitted-Finance 132 MG ROAD GOAL GHAR PORT BLAIR PIN 744103 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | L1 | Admitted-Finance | |
| 2 | L2₹13.3 L+₹878.60 (0.07%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹13.4 L+₹16,235.30 (1.22%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹15.0 L+₹1.7 L (12.8%)Admitted-Finance COLLINPUR SOUTH ANDAMAN | L4 | Admitted-Finance | |
| 5 | L5₹15.9 L+₹2.6 L (19.5%)Admitted-Finance GOVT CONTRACTOR STEWARTGUNJ SOUTH ANDAMAN PIN 744107 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744107 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P GANGA RAJU AND BROTHERS L3 | N H CONSTRUCTION L5 | CRESCENT CONSTRUCTION L1 | RAKESH SAHA L4 | P MOHAMMED VASEEM L2 | P VENKET RAMAN L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||||||
| 1.10 | All kinds of soil. | 151.18 | cum | 150 ₹22,677 Lowest | 350 ₹52,913 | 200 ₹30,236 | 200 ₹30,236 | 300 ₹45,354 | 350 ₹52,913 |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : | |||||||||
| 2.10 | 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 37.73 | cum | 8,000 ₹3,01,840 | 10,500 ₹3,96,165 | 8,000 ₹3,01,840 | 9,500 ₹3,58,435 | 7,000 ₹2,64,110 Lowest | 9,000 ₹3,39,570 |
| 3.00Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : | |||||||||
| 3.10 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 23.08 | cum | 10,500 ₹2,42,319 | 12,000 ₹2,76,936 | 11,500 ₹2,65,397 | 11,500 ₹2,65,397 | 9,500 ₹2,19,241 Lowest | 15,000 ₹3,46,170 |
| 4.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||||||
| 4.10 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 7.73 | cum | 10,500 ₹81,165 | 12,500 ₹96,625 | 12,000 ₹92,760 | 11,500 ₹88,895 | 10,000 ₹77,300 Lowest | 15,000 ₹1,15,950 |
| 5.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 12.68 | cum | 11,500 ₹1,45,820 | 13,000 ₹1,64,840 | 11,500 ₹1,45,820 | 11,500 ₹1,45,820 | 10,000 ₹1,26,800 Lowest | 15,000 ₹1,90,200 |
| 6.00Centring and shuttering including strutting, propping etc. and removal of form for : | |||||||||
Tender Value
₹18.6 L
EMD Value
₹37,140
Closing Date
14 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Sri Vijaya Puram, South Andaman
Construction of Footbridge near Harsith Biswas house at Shoal Bay-14 under Shoal Bay Gram Panchayat.
2025_RDPRI_20134_1
EE/PRI/SAD-I/RR/2025-26/95
Open Tender
Civil Works - Bridges
Works
365 days
Shoal Bay
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, GPPS
₹37,140
17 Oct 2025
6 Oct 2025
15 Oct 2025
7 Oct 2025
14 Oct 2025
7 Oct 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
Centring and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete.
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access platform
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
P MOHAMMED VASEEM (BID ID -59414)
P GANGA RAJU AND BROTHERS (BID ID -59408)
RAKESH SAHA (BID ID -59368)
N H CONSTRUCTION (BID ID -59431)
P VENKET RAMAN (BID ID -59404)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .