| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mrs.Sornagandhi Arulnathan L1 |
|---|---|---|---|---|
| 1.01 | Dismantling of old Damaged Plastaring removed carefully away from the site including all labour charges etc complete | 84 | cum | 9 ₹756 Lowest |
| 1.02 | Dismantling and clearing away old damaged one course P.Tiles inculuding all labour charges etc., complete.(SD 33/38) | 90.92 | cum | 27 ₹2,454.84 Lowest |
| 1.03 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. | 6.82 | cum | 3,500 ₹23,870 Lowest |
| 1.04 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officersFinishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 90.92 | cum | 970 ₹88,192.4 Lowest |
| 1.05 | Plastering with Cement Mortar 1:3 (One Cement and Three Plastering M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 84 | sqm | 300 ₹25,200 Lowest |
| 1.06 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. | 95.35 | sqm | 250 ₹23,837.5 Lowest |
| 1.07 | Chipping of concrete and roughening the surface | 28.8 | sqm | 40 ₹1,152 Lowest |
| 1.08 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 29.9 | no | 143 ₹4,275.7 Lowest |
| 1.09 | Repair and maintenance of Steel door including cost of material and labour charges etc complete | 2 | no | 1,500 ₹3,000 Lowest |
| 1.10 | Repair and maintenance of Steel window including cost of material and labour charges etc complete | 4 | sqm | 500 ₹2,000 Lowest |
Tender Value
₹3.7 L
EMD Value
₹3,710
Closing Date
3 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer BP, Kammapuram
Panchayat Union Office, Kammapuram
REpairs to 2 class room school builing at Seduthankuppam in Iruppu panchayat
2026_RDTN_717135_12
A2/808/2026
Open Tender
Civil Works - Buildings
Item Rate
90 days
Panchayat Union Office, Kammapuram
As per tedner
8 documents required · 8 mandatory
₹0
₹3,710
Panchayat Union Office, Kammapuram
4 Nov 2026
26 Oct 2026
3 Nov 2026
26 Oct 2026
3 Nov 2026
26 Oct 2026
27 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of old Damaged Plastaring removed carefully away from the site including all labour charges etc complete | 84 | cum | 246.52 | ₹20,707.68 |
| 1.02 | Dismantling and clearing away old damaged one course P.Tiles inculuding all labour charges etc., complete.(SD 33/38) | 90.92 | cum | 1,897.8 | ₹1,72,547.98 |
| 1.03 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. | 6.82 | cum | 1,897.8 | ₹12,943 |
| 1.04 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officersFinishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 90.92 | cum | 1,897.8 | ₹1,72,547.98 |
| 1.05 | Plastering with Cement Mortar 1:3 (One Cement and Three Plastering M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 84 | sqm | 1,897.8 | ₹1,59,415.2 |
| 1.06 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. | 95.35 | sqm | 1,897.8 | ₹1,80,955.23 |
| 1.07 | Chipping of concrete and roughening the surface | 28.8 | sqm | 1,897.8 | ₹54,656.64 |
| 1.08 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 29.9 | no | 1,897.8 | ₹56,744.22 |
| 1.09 | Repair and maintenance of Steel door including cost of material and labour charges etc complete | 2 | no | 1,897.8 | ₹3,795.6 |
| 1.1 | Repair and maintenance of Steel window including cost of material and labour charges etc complete | 4 | sqm | 1,897.8 | ₹7,591.2 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
IruppuFinancialbid.pdf
Tender Documents • 0.68 MB
BOQ_862423.xls
BOQ • 0.39 MB
IruppuTechnicalbid.pdf
Tender Documents • 1.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .