Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹5.5 L
EMD Value
₹11,096
Closing Date
13 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive Officer
Chief Executive Officer, South Goa Zilla Panchayat, Old Collectorate Bldg., 3rd Floor, Margao-Goa
Construction of shed near Shree Mallikarjun Temple in V.P. Cundaim of Veling Priol Constituency
2026_ZP_32551_1
3/6/SGZP/2026-27/TN-193/L16
Open Tender
Civil Works - Buildings
Percentage
120 days
V.P. Cundaim
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹11,096
17 Nov 2026
22 Oct 2026
16 Nov 2026
22 Oct 2026
13 Nov 2026
22 Oct 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 4.46 | Cum | 1,136 | ₹5,066.56 |
| 2 | Dismantling G.I. sheets roofing including ridges, hips valleys and gutters etc. and stacking the material within 50 meters lead. | 27 | sqm | 78 | ₹2,106 |
| 3 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a)All kinds of soil | 24.04 | M3 | 291 | ₹6,995.64 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 8.65 | M3 | 2,211 | ₹19,125.15 |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :a) All works upto plinth level | 12.08 | M3 | 6,635 | ₹80,150.8 |
| 6 | Providing & laying cement concrete 1:2:4 (1
cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level | 7.74 | Cum | 6,810 | ₹52,709.4 |
| 7 | Centering and shuttering including struttings, propping etc. and removal of formwork for :ii)vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 24 | sqm | 479 | ₹11,496 |
| 8 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge b) 75 mm dia | 5.6 | M | 185 | ₹1,036 |
| 9 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 1.2 | M3 | 245 | ₹294 |
| 10 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 16.51 | Cum | 5,186 | ₹85,620.86 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 9.05 MB
Tendernotice_3.pdf
PDF • 1.03 MB
BOQ_32933.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .