| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-Finance 35 238 VOC NAGAR THANGAMAPURATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹5.9 L+₹4,760 (0.81%)Accepted-Finance 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | 2 | Accepted-Finance Satisfied |
Tender Value
₹8.3 L
EMD Value
₹8,300
Closing Date
13 Jan 2020, 2:00 pmClosed
Additional Chief Engineer /Mechanical-I/MTPS-I
Office of the Additional Chief Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM UNIT I Gasket renewing of 600 500 350 300 250 200 150 mm Valves Gasket renewing of 350 300 200 150 mm cooling line orifice plates Flanges in Unit I during bearing high vibration problem rectification work
2020_EB_152248_1
ACE / M-I / MTPS-I / TM / OT. 456 / 2019-20
Open Tender
Power/Energy Projects/Products
Works
25 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹8,300
Yes
18 Jan 2020
7 Jan 2020
14 Jan 2020
7 Jan 2020
13 Jan 2020
7 Jan 2020
Amount
Gasket renewing for 400/500/600 mm valve, This work involves removing the valve from line, Cleaning the flange surface on both sides, Preparation of gaskets for both ends, positioning the valve in the line with gaskets and tightening the flange bolts & nuts. (Tag No: ES- 13 & 14- 2 Nos and MC-1 &2-2Nos Total=4Nos)
Gasket renewing for 250/300/350 mm valve, This work involves Removing the valve from line, Cleaning the flange surface on both sides, Preparation of gaskets for both ends, positioning the valve in the Line with gaskets and tightening the flange bolts & nuts. (Tag No: MC-18,20,22,23,29,30,31,33, 34,35,36,37,38, 39,40,41,55,56,57 &58,ES-9 &12, BFP Suction -2A, 2B&2C, Deaerator NRV-1No -Total= 26 Nos)
Gasket renewal works of BFP to Deaerator 100 mm RC line Orifice flanges 3Nos at deareator floor GV,GLV 100mm/40 ATA in MC lines. This work involves dismantling the flange bolts and nuts,removing the orifice platecleaning the flange surface, preparing the 2Nos of gaskets, positioning the flanges & gaskets and tightening the flange bolts and nuts. (Tag No– MC-3,32 49,50 & RC line Orifice flanges-2A, 2B & 2C= 7 Nos)
Gasket renewing for 250/300/350 mm valve, This work involves Removing the valve from line, Cleaning the flange surface on both sides, Preparation of gaskets for both ends, positioning the valve in the Line with gaskets and tightening the flange bolts & nuts. (Tag No: ,AS-58, CA-1 & 2- 3 Nos , Main CW LOCPB I/L & O/L header valves from tunnel - 2 Nos, H2CWBP I/L & O/L header valves from tunnel - 2 Nos, TLOCBP I/L & O/L valves=4 Nos,H2CPB I/L & O/L valves-4Nos, Total-15 Nos.
Gasket renewing for 150/200 mm valve, This work involves Removing the valve from line, Cleaning The flange surface on both sides, Preparation of gaskets for both ends, positioning the valve in the Line with gaskets and tightening the flange bolts & nuts. (TagNo HD-16,17,22,23,24,25,26,27,28, 29,31,32,35, 38,39,40,41,42,43,46,47,48, 49,51,52,58,60 –27 Nos, ACW to TLOCBP inlet & outlet header interconnection line valves-2 Nos, CA-03,04,05,06 –4 Nos, AS-1,2,3,4, 5,6 & 31–7 Nos, VHCS-52, 53, 54, 58, 57,120,121-7Nos and Deaerator pressure control valve Total–48 Nos)
Gasket renewing for 50 mm /40ATA/ 800 class valve. This work involves Removing the valve from line, Cleaning The flange surface on both sides, Preparation of gaskets for both ends, positioning the valve in the Line with gaskets and tightening the flange bolts & nuts. Tag No- AS 21 to 30 = Total=10Nos
Gasket renewal works in 350 / 300 mm Cooling water lineorificeplate flanges This work involves dismantling the flange bolts and nuts, removing the orifice plate and differential pressure line flanges, cleaning the flange surfaces, preparing the 2 sets (1 set = 2 Nos) of gaskets, positioning the flanges & gaskets and tightening the flange bolts & nuts. (Tag.No.TLOCBP and H2CBP O/L header each 1 No – Total =2 Nos)
Gasket renewal works in 200 / 150 mm Cooling water line orifice plate flanges This work involves dismantling the flange bolts and nuts, removing the orifice plate and differential pressure line flanges, cleaning the flange surfaces, preparing the 2 sets of gaskets, positioning the flanges & gaskets and tightening the flange bolts & nuts. (Tag.No. TLOC A, B & C O/L – 3 Nos, Seal oil cooler –A & B outlet – 2 Nos, ACW main outlet A, B, C – 3 Nos, WOC outlet A, B, C- 3 Nos, SWC A & B Outlet-2 Nos and H2 Cooler outlet- 4 Nos- Total = 17 Nos)
SRI VAITHEESWARA CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .