| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.0 LRejected-Finance | ₹10.0 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S M.S. TRADERS L2 | OM CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of RCC Works stacking of dismantled material within 60M in drain bed including all cost of labour, material, T&P etc. required for proper completion of the work. | 1.8 | Cum. | 350 ₹630 | 10,000 ₹18,000 |
| 2.00 | Dismantling of bricks Works stacking of dismantled material within 60M in drain bed including all cost of labour, material, T&P etc. required for proper completion of the work. | 7.5 | Cum. | 360 ₹2,700 | 2,000 ₹15,000 |
| 3.00 | Dewatering by 7.50 H.P deisel pump including fuel and pump operating staff material/HP/Hour depreceation of boring set for E.W in foundation laying R.C.C in foundation and brick work | 2,145 | KWH | 46 ₹98,670 | 10 ₹21,450 |
| 4.00 | Earth work excavation in foundation including all lead & lift cost of labour, material, T&P etc. required for proper completion of the work. | 130 | Cum. | 78.5 ₹10,205 | 100 ₹13,000 |
| 5.00 | Laying C.C 1:3:6 in foundation with stone ballast 20-40 mm size including all cost of labour, material, T&P etc. required for proper completion of the work. | 29 | Cum. | 4,000 ₹1.2 L | 6,000 ₹1.7 L |
| 6.00 | Ist class Brick work in 1:4 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 130 | Cum. | 4,250 ₹5.5 L | 4,100 ₹5.3 L |
| 7.00 | Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work. | 55 | Sqm. | 588 ₹32,340 | 350 ₹19,250 |
| 8.00 | Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work. | 1.1 | M.T | 50,000 ₹55,000 | 6,000 ₹6,600 |
| 9.00 | R.C.C 1:1.5:3 including all cost of labour, material, T&P etc. required for proper completion of the work. | 26 | Cum. | 4,000 ₹1.0 L | 6,000 ₹1.6 L |
| 10.00 | Struck cement pointing in 1:2 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 145 | Sqm. | 135 ₹19,575 | 120 ₹17,400 |
Tender Value
₹12.7 L
EMD Value
₹26,000
Closing Date
5 Mar 2026, 3:00 pmClosed
Exectutive Engineer
EE, Drainage Dn-1, Meerut
As pet NIT
2026_UPIDC_1120733_1
03/EE/2025-26
Open Tender
Civil Works - Canal
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹26,000
25 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
Dismantling of RCC Works stacking of dismantled material within 60M in drain bed including all cost of labour, material, T&P etc. required for proper completion of the work.
Dismantling of bricks Works stacking of dismantled material within 60M in drain bed including all cost of labour, material, T&P etc. required for proper completion of the work.
Dewatering by 7.50 H.P deisel pump including fuel and pump operating staff material/HP/Hour depreceation of boring set for E.W in foundation laying R.C.C in foundation and brick work
Earth work excavation in foundation including all lead & lift cost of labour, material, T&P etc. required for proper completion of the work.
Laying C.C 1:3:6 in foundation with stone ballast 20-40 mm size including all cost of labour, material, T&P etc. required for proper completion of the work.
Ist class Brick work in 1:4 C.M including all cost of labour, material, T&P etc. required for proper completion of the work.
Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work.
Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work.
R.C.C 1:1.5:3 including all cost of labour, material, T&P etc. required for proper completion of the work.
Struck cement pointing in 1:2 C.M including all cost of labour, material, T&P etc. required for proper completion of the work.
Supplying and fixing PVC pipe 75mm dia and for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work.
Supplying and fixing marble plate 300x300 mm size on VRB including all cost of labour, material, T&P etc. required for proper completion of the work.
Disposal all dismantled material in Drain Bed/Chakraod Ramp with T & P etc. complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.43 MB
TD.pdf
Tender Documents • 1.56 MB
BOQ_2084870.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid