Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹3.1 Laccepted-aoc | ₹3.1 L | accepted-aoc |
Tender Value
₹2.9 L
EMD Value
₹2,934
Closing Date
16 Jul 2026, 11:00 amClosed
Executive Engineer, Irrigation Division-4, Doultha
O/o Executive Engineer, Irrigation Division-4, Doulthabad
FDR- Permanent Restoration of Dubba Kunta, Rampur(V), Alladurg(M), Medak District
715450
No.05/2026-27
OPEN
Civil Engineering Works
MEDAK
4 documents required · 4 mandatory
₹104
₹2,934
24 Jul 2026
8 Jul 2026
9 Jul 2026
IRR-CCDW-1-2 Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
IRR-CCDW-2-5 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
IRR-CCDW-2-11 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, labour, machinery,mixing ,placing, vibarating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
IRR-CCDW-2-10 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size aggregates for wearing coat including cost of all materials, machinery, labour, mixing, placing, vibrating, finishing, curing, etc., complete for plain concrete works with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
IRR-CAW-7-5 Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.soft annealed steel wire, welding wherever required including cost of all materials, machinery,labour etc., complete with initial lead upto 50 and all lifts.
IRR-PMW-3-17 and IRR-PMW-3-19 Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as compacting to density control of not less than 90 percent or as stipulated using 2T roller etc., complete with initial lead upto 1 km and all lifts.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Dubbakunta Tender Document.doc
TENDER_DOCUMENT • 0.85 MB
BOQ Dubbakunta.xls
TENDER_DOCUMENT • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .