Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance GOVT CONTRACTOR 1 32 MOHAMMED HOUSE 23 JIRGATANG SOUTH ANDAMAN PIN 744206 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744206 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.0 L
Closing Date
31 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Deputy Conservator of Forests
Office of The Deputy Conservator of Forests Wildlife Division Haddo
Construction of Ring well (1.50 mtr Dia)
2022_DCFWL_4955_1
WL/G-8/1(A)/Vol.I/2077
Open Tender
Construction Works
Works
30 days
pongibalu under Wandoor Range
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
1 Feb 2022
13 Jan 2022
1 Feb 2022
13 Jan 2022
31 Jan 2022
13 Jan 2022
90 days
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand
Providing and laying CC surface drain 1:4:8 of size 23x23cm.
Stone boulder filling all around the well
Transportation charges
Haneefa Constructions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .