Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 LAccepted-Finance | ₹2.7 L | 1 | Accepted-Finance found ok |
| 2 | 2₹3.0 L+₹28,770 (10.7%)Accepted-Finance | ₹3.0 L+₹28,770 (10.7%) | 2 | Accepted-Finance found ok |
| 3 | 3₹3.4 L+₹75,254 (28.0%)Accepted-Finance | ₹3.4 L+₹75,254 (28.0%) | 3 | Accepted-Finance found ok |
Tender Value
Refer Docs
EMD Value
₹6,175
Closing Date
24 Nov 2022, 6:00 pmClosed
Executive Engineer Civil
BSNL Civil Div, 2nd Floor, BSNL Bhawan, PanBazar Guwahati
Making available parking space by removing vegetation and levelling of area behind BSNL Bhawan, Panbazar , Guwahati.
2022_BSNL_135556_1
eNIT53/BSNL/CDGH/2022-23
Open Tender
Civil Works - Buildings
Item Rate
60 days
BSNL Bhawan Panbazar Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
AO Cash Office of GMTD BSNL Kamrup SSA Guwahati
₹6,175
26 Nov 2022
16 Nov 2022
26 Nov 2022
16 Nov 2022
24 Nov 2022
16 Nov 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
a) All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size)
b) 1:5:10 (1 cement : 5 coarse sand(zone-III) : 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for :
a) Foundations, footings, bases of columns, etc. for mass concrete.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
a) Cement mortar 1:6 (1 cement : 6 coarse sand)
15 mm cement plaster on the rough side of single or half brick wall of mix :
a) 1:6 (1 cement: 6 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
(a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Finishing walls with Acrylic Smooth exterior paint of required shade :
(a) Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
a) Two or more coats on new work.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
a)Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
a)In cement mortar
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
a)With G.I. barbed wire
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
Preparation and leveling of sub grade with mechanical excavator (JCB) after excavating earth as needed including making good the undulations etc. to required level and disposal of surplus earth if any with lead upto 50 metres.
SUDIPA MAITRA
Diganta Patowary
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .