Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.9 L+₹42,268.08 (3.68%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RMDCONSTRUCTIONS L2 | T. RAJMOHAN L1 |
|---|---|---|---|---|---|
| 1.00Name of Work: Providing BT Road to Keelambi Colony in Keelambi Panchayat in Kancheepuram Panchayat Union Under ITPHDS / 2025-26 Estimate Amount : 21.00 Lakhs | |||||
| 2.00 | Clearing the light jungle including all labour charges for burrying and burning etc., complete. | 491.04 | Sqm | 15.9 ₹7,807.54 | 5.9 ₹2,897.14 Lowest |
| 3.00 | Picking the existing Worn out B.T Surface including all labour charges etc,. Complete. | 341 | Sqm | 31 ₹10,571 | 21 ₹7,161 Lowest |
| 4.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A ( Compaction using Power Roller ) | 184.14 | Cum | 141 ₹25,963.74 | 131 ₹24,122.34 Lowest |
| 5.00 | Providing WMM to required thickness including cost and conveyance of all materials from approved Quarry and consolidation by Power roller asper Clause 401 of MoRTH Specifications. | 153.45 | Cum | 2,312 ₹3,54,776.4 | 2,302 ₹3,53,241.9 Lowest |
| 6.00 | Applying Prime coat over Un primed WMM surface at 7Kg / 10 sq.m area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges etc,. complete. | 1,023 | Sqm | 87.5 ₹89,512.5 | 77.5 ₹79,282.5 Lowest |
| 7.00 | Applying Tack coat over Primed WMM surface at 2.50 Kg / 10 sq.m area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,023 | Sqm | 27.6 ₹28,234.8 | 17.6 ₹18,004.8 Lowest |
| 8.00 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
per clause 507 of MORTH Rev-5 | 30.69 | Cum | 11,339 ₹3,47,993.91 | 11,329 ₹3,47,687.01 Lowest |
| 9.00 | Supply and fixing of H.M Stones | 2 | Each | 584 ₹1,168 | 574 ₹1,148 Lowest |
| 10.00 | Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface | 68.2 | Sqm | 900 ₹61,380 | 890 ₹60,698 Lowest |
Tender Value
₹21 L
EMD Value
₹11,810
Closing Date
11 Jun 2025, 3:00 pmClosed
BLock Development Officer BP Kancheepuram
BLock Development Office Kancheepuram
Providing BT Road to Keelambi Colony in Keelambi Panchayat in Kancheepuram Panchayat Union Under ITPHDS / 2025-26 Estimate Amount.21.00 Lakhs
2025_RDTN_564419_1
RC.No.3091784/2025/A15 Dt.23.05.2025
Open Tender
Civil Works - Roads
Lump-sum
90 days
Kancheepuram Union
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹11,810
9 Oct 2025
3 Jun 2025
11 Jun 2025
3 Jun 2025
11 Jun 2025
3 Jun 2025
Amount
Clearing the light jungle including all labour charges for burrying and burning etc., complete.
Picking the existing Worn out B.T Surface including all labour charges etc,. Complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A ( Compaction using Power Roller )
Providing WMM to required thickness including cost and conveyance of all materials from approved Quarry and consolidation by Power roller asper Clause 401 of MoRTH Specifications.
Applying Prime coat over Un primed WMM surface at 7Kg / 10 sq.m area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges etc,. complete.
Applying Tack coat over Primed WMM surface at 2.50 Kg / 10 sq.m area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and fixing of H.M Stones
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Providing and Laying carted earth filling to 100mm compacted thick including cost & conveyance of carted earth from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Cost of reflectors
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RMDCONSTRUCTIONS (BID ID -1364338)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .