Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹33,100
Closing Date
26 May 2023, 1:00 pmClosed
EE (SDW) VII
NSTP Coronation Pillar Delhi 110009
Repair Renovation of Upadhya make Sluice valves are installed at Narela SPS
2023_DJB_241352_3
NIT No 4 (2023-24)
Open Tender
Miscellaneous Works
Works
120 days
NSTP Coronation Pillar
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Online
₹33,100
3 Jun 2023
19 May 2023
26 May 2023
19 May 2023
26 May 2023
19 May 2023
Repair/Servicing of Upadhaya Make delivery Sluice Valve of size 400mm Dia. of Pump set no -3 & 6 at Narela SPS by carrying out the following works:- Safety equipment’s & Scaffolding equipment’s have to be arranged for the workers as the work has to be done up to the height of Sluice Valve from the ground level. The same includes loading, unloading & cartage charges etc.
Removing of wheel along from the sluice valve stem, Opening/cutting of all nut bolts/studs of upper dome (Bonnet) of sluice valve body, Yoke and Gland Plate bolts.
Lifting of Yoke & bonnet with the help of Electric chain hoist & manual labour arrangement to take it to safer place in the pump house as per site requirement.
Taking out complete wedge from the Sluice Valve body by lifting with the help of Electric chain hoist & manual labour arrangement. Cleaning of body seat rings of Sluice Valve from inside by chemical solution and polishing by manual arrangement. Cleaning of Sluice Valve wedge facing rings by chemical solution, emery paper etc. and polishing as required.
Repairing of side grooves of the sluice valve body and side ribs of wedge for smooth functioning of wedge in up and down movement
Closing of Sluice valve from top by providing & fixing of blank flange on the top of sluice valve.
Repairing of Spindle holder seat on the wedge by cutting of worn out seat and machining and making of new collar seat on the wedge.
Renovation of Yoke Sleeve collar seat by cutting of all worn out seat and making of new collar seat on the yoke of sluice valve body.
Supply of T bolts. (C.S)
Supply of Gasket for bonnet. (Rubber IS :638 Type-B)
Supply of Gasket for Yoke. (Rubber IS :638 Type-B)
Supply of Gland Packing
Supply of Yoke sleeve bush nut.
Supply of nut bolts
Cleaning & repairing of SS spindle threads as required by the job.
Cleaning & repairing of Yoke sleeve threads by matching with SS spindle threads for smooth movement of spindle on load.
Fixing of complete wedge in Sluice valve body with proper matching of both the seat rings of body & wedge rings, fixing of Yoke Sleeve along with stem, fixing of bonnet after replacing of gasket & damaged nut bolts/studs, fixing of yoke with the help of lifting arrangement & manual labour etc. & tightening of nut bolts with spanner, fixing of Gland packing and Gland Plate etc. with the help of manual labour arrangement etc. as required by job.
Complete equipment transportation charges to & fro for T&P items , men & material at site & their handling etc.
Repair/Servicing of Upadhaya Make suction Sluice Valve of size 500mm Dia. of Pump set no -3 & 6 at Narela SPS by carrying out the following works:- Safety equipments & Scaffolding equipments have to be arranged for the workers as the work has to be done up to the height of Sluice Valve from the ground level. The same includes loading, unloading & cartage charges etc.
Removing of wheel along with complete gear box from the sluice valve stem, Opening/cutting of all nut bolts/studs of upper dome (Bonnet) of sluice valve body, Yoke and Gland Plate bolts.
Lifting of bonnet with the help of Electric chain hoist & manual labour arrangement to take it to safer place in the pump house as per site requirement.
Taking out complete wedge from the Sluice Valve body by lifting with the help of Electric chain hoist & manual labour arrangement. Cleaning of body seat rings of Sluice Valve from inside by chemical solution and polishing by manual arrangement. Cleaning of Sluice Valve wedge facing rings by chemical solution, emery paper etc. and polishing as required.
Repairing of side grooves of the sluice valve body and side ribs of wedge for smooth functioning of wedge in up and down movement
Closing of Sluice valve from top by providing & fixing of blank flange on the top of sluice valve.
Repairing of Spindle holder seat on the wedge by cutting of worn out seat and machining and making of new collar seat on the wedge.
Renovation of Yoke Sleeve collar seat by cutting of all worn out seat and making of new collar seat on the yoke of sluice valve body.
Supply of T bolts. (C.S).
Supply of Gasket for bonnet. (Rubber IS :638 Type-B)
Supply of Gasket for Yoke. (Rubber IS :638 Type-B)
Supply of Gland Packing.
Supply of Yoke sleeve bush nut.
Supply of nut bolts.
Cleaning & repairing of SS spindle threads as required by the job.
Cleaning & repairing of Yoke sleeve threads by matching with SS spindle threads for smooth movement of spindle on load.
Fixing of complete wedge in Sluice valve body with proper matching of both the seat rings of body & wedge rings, fixing of Yoke Sleeve along with stem, fixing of bonnet after replacing of gasket & damaged nut bolts/studs, fixing of yoke with the help of lifting arrangement & manual labour etc. & tightening of nut bolts with spanner, fixing of Gland packing and Gland Plate etc. with the help of manual labour arrangement etc. as required by job.
Overhauling of complete gear box of the sluice valve including cleaning, greasing and fixing the same on the sluice valve and taking trial run of sluice valve as required by deptt.
Complete equipment transportation charges to & fro for T&P items , men & material at site & their handling etc.
Repair/Servicing of Upadhaya Make delivery Sluice Valve of size 600mm Dia. of Pump set no -2 & 4 at Narela SPS by carrying out the following works:- Safety equipments & Scaffolding equipments have to be arranged for the workers as the work has to be done up to the height of Sluice Valve from the ground level. The same includes loading, unloading & cartage charges etc.
Removing of wheel along with complete gear box from the sluice valve stem, Opening/cutting of all nut bolts/studs of upper dome (Bonnet) of sluice valve body, Yoke and Gland Plate bolts.
Lifting of bonnet with the help of Electric chain hoist & manual labour arrangement to take it to safer place in the pump house as per site requirement.
Taking out complete wedge from the Sluice Valve body by lifting with the help of Electric chain hoist & manual labour arrangement. Cleaning of body seat rings of Sluice Valve from inside by chemical solution and polishing by manual arrangement. Cleaning of Sluice Valve wedge facing rings by chemical solution, emery paper etc. and polishing as required.
Repairing of side grooves of the sluice valve body and side ribs of wedge for smooth functioning of wedge in up and down movement
Closing of Sluice valve from top by providing & fixing of blank flange on the top of sluice valve.
Repairing of Spindle holder seat on the wedge by cutting of worn out seat and machining and making of new collar seat on the wedge.
Supply of T bolts. (C.S)
Supply of Gasket for bonnet. (Rubber IS :638 Type-B)
Supply of Gasket for Yoke. (Rubber IS :638 Type-B)
Supply of Gland Packing
Supply of Yoke sleeve bush nut.
Supply of nut bolts
Cleaning & repairing of SS spindle threads as required by the job.
Cleaning & repairing of Yoke sleeve threads by matching with SS spindle threads for smooth movement of spindle on load.
Fixing of complete wedge in Sluice valve body with proper matching of both the seat rings of body & wedge rings, fixing of Yoke Sleeve along with stem, fixing of bonnet after replacing of gasket & damaged nut bolts/studs, fixing of yoke with the help of lifting arrangement & manual labour etc. & tightening of nut bolts with spanner, fixing of Gland packing and Gland Plate etc. with the help of manual labour arrangement etc. as required by job.
Overhauling of complete gear box of the sluice valve including cleaning, greasing and fixing the same on the sluice valve and taking trial run of sluice valve as required by deptt.
Complete equipment transportation charges to & fro for T&P items , men & material at site & their handling etc.
Repair/Servicing of Upadhaya Make suction Sluice Valve of size 700mm Dia. of Pump set no -2 & 4 at Narela SPS by carrying out the following works:- Safety equipments & Scaffolding equipments have to be arranged for the workers as the work has to be done up to the height of Sluice Valve from the ground level. The same includes loading, unloading & cartage charges etc.
Removing of wheel along with complete gear box from the sluice valve stem, Opening/cutting of all nut bolts/studs of upper dome (Bonnet) of sluice valve body, Yoke and Gland Plate bolts.
Lifting of bonnet with the help of Electric chain hoist & manual labour arrangement to take it to safer place in the pump house as per site requirement.
Taking out complete wedge from the Sluice Valve body by lifting with the help of Electric chain hoist & manual labour arrangement. Cleaning of body seat rings of Sluice Valve from inside by chemical solution and polishing by manual arrangement. Cleaning of Sluice Valve wedge facing rings by chemical solution, emery paper etc. and polishing as required.
Repairing of side grooves of the sluice valve body and side ribs of wedge for smooth functioning of wedge in up and down movement
Closing of Sluice valve from top by providing & fixing of blank flange on the top of sluice valve.
Repairing of Spindle holder seat on the wedge by cutting of worn out seat and machining and making of new collar seat on the wedge.
Supply of T bolts. (C.S)
Supply of Gasket for bonnet. (Rubber IS :638 Type-B)
Supply of Gasket for Yoke. (Rubber IS :638 Type-B)
Supply of Gland Packing
Supply of Yoke sleeve bush nut.
Supply of nut bolts
Cleaning & repairing of SS spindle threads as required by the job.
Cleaning & repairing of Yoke sleeve threads by matching with SS spindle threads for smooth movement of spindle on load.
Fixing of complete wedge in Sluice valve body with proper matching of both the seat rings of body & wedge rings, fixing of Yoke Sleeve along with stem, fixing of bonnet after replacing of gasket & damaged nut bolts/studs, fixing of yoke with the help of lifting arrangement & manual labour etc. & tightening of nut bolts with spanner, fixing of Gland packing and Gland Plate etc. with the help of manual labour arrangement etc. as required by job.
Overhauling of complete gear box of the sluice valve including cleaning, greasing and fixing the same on the sluice valve and taking trial run of sluice valve as required by deptt.
Complete equipment transportation charges to & fro for T&P items , men & material at site & their handling etc.
M G Traders and Engineers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .