| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹87,000
Closing Date
10 Aug 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer NH Division Bengaluru
O/O Executive Engineer NH Division Bengaluru
Patching of potholes with DBM BC maintenance of earthen shoulders NH-234 of Madhugiri Mulbagal Section from KM 343 800 to km 400 330 in the State of Karnataka
2021_MoRTH_641612_1
NIT 02/2021-22 dated 03.08.2021
Open Tender
Civil Works - Roads
Item Rate
60 days
Chikkaballapura
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
As per NIT
₹87,000
11 Aug 2021
3 Aug 2021
11 Aug 2021
3 Aug 2021
10 Aug 2021
3 Aug 2021
135 days
Amount
Providing and applying Tack Coat as per Table 500-5 on prepared surface using VG-10 grade pavaing Bitumen complying with IS 73-2013 and as per IRC -22 of approved quality and make including cleaning of road surface by Mechanical Broom & dusting by Air compressor, and spraying by Bitumen Pressure Distributor, including cost of all materials, labour, hire charges of machinery, loading, unloading stacking, etc complete, except lead for Bitumen, including cost of all materials, labour, hire charges of machinery, lead, loading, unloading stacking,with all other incidental charges etc complete and as per the direction of the Engineer-In-Charge for successful completion of work. On black topped surface at minimum 2.0kg/10 sqm.
Providing and laying Dense Graded Bituminous Macadam using crushed aggregates as per table 500-10 of specified graded aggregates and filler (Cement) @ 2% by weight of aggregates, premixed with minimum bituminous binder VG-30 Grade Paving Bitumen(as per clause 504.2.1) complyimg with IS 73 in Hot mix plant , loading of aggregates with F.E. loader, transported to site in tipper to paver, laid over a previously prepared surface with Mechanical Paver Finisher to the required grade, level, alignment, rolling with Smooth wheeled roller 8-10 tonnes, vibratory roller 8 tonnes, smooth wheeled tandem roller 6-8 tonnes as per clauses 501.6 and 501.7 to achieve the desired compaction, including cost of all materials, labour, hire charges of machinery, lead, lifts, loading, unloading, stacking, transporting with lead of mixed material and all other incidental charges etc complete and as per the direction of the Engineer-In-Charge for successful completion of work . (Compacted thickness-50 mm). Using 40-60 TPH HMP. (Grading-2) with 4.50% Bitumen.
Providing and laying Bituminous Concrete using crushed stone aggregates as per table 500-17 of specified graded aggregates and filler (Cement) @ 2% by weight of aggregates premixed with minimum bituminous binder VG-30 grade Paving Bitumen(60/70 Grade) as per clause 504.2.1) complying with IS 73/IS15462(IRS SP53) in hot mix plant, loading of aggregates with F.E. loader, transported to site in tipper to paver, laid over a previously prepared surface with Mechanical Paver Finisher to the required grade, level, alignment, rolling with Smooth wheeled roller 8-10 tonnes, vibratory roller 8 tonnes, smooth wheeled tandem roller 6-8 tonnes as per clauses 501.6 and 501.7 to achieve the desired compaction, including cost of all materials, labour, hire charges of machinery, lead, lifts, loading, unloading, stacking, transporting with a lead of mixed material and all other incidental charges etc complete and as per the direction of the Engineer-In-Charge for successful completion of work (Compacted thickness-30mm). Using 40-60 TPH HMP, Grading-2 with 5.4% Bitumen Using VG-30 grade Paving Bitumen (60/70 grade)
Stripping excess soil from the shoulder surface upto 75 mm to achieve the approved level and compacting with plate compactor, The erath slipped from earthen shoulders to be dumped on the side slopes locally for disposal.including,cost of all labour hire charges of machinery, loading,unloading ,lead lift, disposal of earth etc, as per the direction of the Engineer-In-Charge for successful completion of work.
Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil upto 150mm excavated by excavator, carriage by tipper and compacting it with plate compactor to the desired field density including cost of all materials, labour, loading, unloading, lead, lift, transporting with all other incidental charges etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work.
Bidder Name
M/s. SRI EKADANTHA
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .