Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹84,000
Closing Date
9 Nov 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Neha Sinha
POWER GRID CORPORATION OF INDIA LTD PLOT NO.4, UNIT-41, NILADRI VIHAR, CHANDRASHEKHARPUR, BHUBANESWAR-751021.
Removal of RCC breaking old pile capes and open cast stubs of 220 kV D/C Pandiabili-Samagra line of OPTCL. ODP/BB/C and M-2932/I-2262/RFx-5006003819/22-23
ODP/BB/CandM-2932/I-2262/RFx-5006003819/22-23
Limited
Civil Works - Others
Works
Pandiabili
₹84,000
25 Oct 2022
25 Oct 2022
9 Nov 2022
25 Oct 2022
9 Nov 2022
25 Oct 2022
Demolishing R.C.C work manually/by mechanical means upto depth 1 mtr below GL and disposal of unserviceable material upto 2.05 km lead as per direction of Engineer In Charge. The dismantling is for transmission line foundation consisting of pile, pile cap, Beam and open cast foundation chimney as per site. The Work is including necessary excavation required for breaking / dismantling of RCC and filling the area including the excavated portion and dismantled concrete portion with available/excavated earth
Dismantling of existing tower stub height/length upto 1 mtr below ground level embedded in RCC of TL foundation including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and loading inloading stacking and carraige to 220 KV Samagra Sub station. (Concrete dismentling to be paid separately as per BOQ item no. 1) (Note: The unit rate is for each location consisting of 04 nos of tower legs)
Hire charges of pump set of capacity 4000 litres/hours for discharge the ground water including diesel charges. (Note: The unit rate is for each location consisting of 04 nos of tower legs)
: Civil Works Package - :
2 or More
JV (Joint Venture)
Six (06) Months
Average annual turnover (in INR)
Details of Contract & Date
Tentative Completed date
Qualification
Ref/ Page No.
Ref/ Page No.
Ref/ Page No.
Ref/ Page No.
POWER GRID CORPORATION OF INDIA LIMITED,
Section
Clause No./ Page No.
Ref. and Page No.
Ref. and Page No.
Period in weeks (from the effective date of LOA)
Date of Retirement/ resignation from POWERGRID
Date of Retirement/ resignation from POWERGRID
Date of Retirement/ resignation from POWERGRID
Six (06) Months
Name of the published index
Wholesale Price Index Number for ‘High Speed Diesel’ (Individual commodity) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Wholesale Price Index Number for ‘Ferrous Metals’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Wholesale Price Index Number for High Speed Diesel’ (Individual commodity) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Wholesale Price Index Number for ‘Cement & Lime’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Wholesale Price Index Number for ‘Structural Clay Products’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
JV (Joint Venture)
FALSE
We have enclosed a Bid Guarantee in original and one copy in the form of Bank Guarantee (Bank Guarantee No.-, dated DD-MM-YYYY issued from ) for a sum of Rupees /-, Valid for a period of Seven [07] calendar months from the date of opening of bids i.e. upto and inclusive of DD-MM-YYYY.
EMD DETAIL FORM
Bank Guarantee No.
Name of Issuing Bank :
Clause No 13.0, ITB, Section -II and cl. 3.0 SCC, Section-IV, Volume-I
Clause No.64.0, Conditions of Contract (GCC) & Clause 11.0, SCC
Clause No.14,Section GCC, Vol.-I ,Conditions of Contract & Clause 12.0 of SCC, Section-IV, Vol-I & Clause 33.0 of ITB, Volume-I
Clause No 10.0 of SCC, Volume-I
Clause No 11.0 of ITB,
Cl.No.45.0 & 46.0 Section. GCC, Vol. I, Conditions of Contract & Clause 8.0 of SCC, Volume- I
Clause No. 9.0 of SCC, Volume -I
Banks certified Cheque
Bank Guarantee
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Attachment 20- Affidavit for self-certification.DOCX
docx • 0.02 MB
Attachment-26 Declaration regarding events encountered pursuant to ITB Clause 2-1.docx
docx • 0.03 MB
Attachment-27 Land Border Restrictions.doc
doc • 0.04 MB
Bill of Material.xlsx
xlsx • 0.07 MB
First Envelope and Bid Forms.xlsx
xlsx • 0.65 MB
Open Cast Tesla Drawing.pdf
pdf • 1.43 MB
OPTCL Pile foundations Drawing.pdf
pdf • 8.47 MB
Pile Foundation Tower OC+15.pdf
pdf • 0.18 MB
Pile foundation UR+5.pdf
pdf • 1.08 MB
SFQP.pdf
pdf • 2.18 MB
Technical Specification Civil.pdf
pdf • 2.30 MB
UR Pile Drawing.pdf
pdf • 1.08 MB
01 Invitation for Bids (IFB)-Section-I.docx
docx • 0.17 MB
02 Instructions to bidders(ITB)-Section-II.docx
docx • 0.12 MB
03 Bid Data Sheets (BDS)-Section-III.doc
doc • 0.23 MB
03A ANNEX-D(BDS)-Undertaking for Authenticity.DOC
doc • 0.05 MB
04 Conditions of Contract Civil Works.pdf
pdf • 0.39 MB
04A GCC Civil Amendments I - IX.pdf
pdf • 1.46 MB
05 SCC-Section-V.docx
docx • 0.11 MB
06 ANNEXURE-I, II ,III & IV of SCC.docx
docx • 0.04 MB
07 ANNEX-D (SCC) SA 8000 2008.pdf
pdf • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .