Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.9 L
EMD Value
₹21,800
Closing Date
21 Aug 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Mech and Hospital Division Doda
Office of the Executive Engineer Mechanical and Hospital Division Doda
ESTABLISHMENT INDOOR SHOOTING RANGE 4 point 57 X 16 METRE WITH 3 point 65 MTR HEIGHT IN GOVERNMENT HIGHER SECONDARY SCHOOL BOYS KISHTWAR
2024_PWDJK_256643_1
MHDD/TS/2024-25/17
Open Tender
Miscellaneous Works
Turn-key
30 days
GHSS Boys Kishtwar
As per SBD
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Mech and Hospital Division Doda
₹21,800
Yes
17 Oct 2024
12 Aug 2024
21 Aug 2024
12 Aug 2024
21 Aug 2024
12 Aug 2024
Amount
Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5mtr in width as well as 10 sq on plain including disposal of excavated earth lead up to 50 mtr and lift up to 1.5M. 1.5 x 1.5 x 2 = 4.5 x 14 = 63 cft i.e. 1.78M3
Providing and Laying of Position Cement Concrete for 14 No. columns of size 1.5 x 1.5 x 2 feet along with flooring of size 15 x 50 feet having a thickness of 03 inch along with laying of crushed stone 40mm thick and consolidation by means of road roller to give an even surface before laying of PCC along with cement plaster (1:4) 12mm thick over the floor area for a smooth surface for laying of Epoxy flooring over the floor. The cost includes material, tools and tackles, skilled labour, carriage, transportation and all taxes as applicable.
Structural steel work for column base in Single Section, Fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer. Complete job including material, tools and tackles, skilled labour, carriage, transportation, carriage and all taxes as applicable.
Steel work welded in built up section/ framed work including cutting, hosting, applying a priming coat using structural steel. In gratings, frames, guard bard, ladders, railings etc. trusses including primer and enamel paint including nut bolts, kingpost, struts etc. Column ISA Section (65 x 6 mm) = 14 x (14’-0”) = 196 rft = 29.26 m @ 5.91 kg/m = 172.92 kg MS Sq. Foundation Plate of size (300 x 300 x 10 mm) @ 07Kg per plate for 14 plates = 98 kg MS Pipe for Purlins of size 50 x 50 x 3.2 = 10 x 52 = 520 ft i.e. 158.49 mtr @ 4.56 Kg.mtr = 722.71 Kg Bracing Top of size 40 x 40 x 3.2 = 16 x 20 = 320 ft i.e. 97.53 mtr @ 3.56 Kg.mtr = 347.20 Kg Bracing Side of size 40 x 40 x 3.2 = 130 x 4 = 520 ft i.e. 158.49 mtr @ 3.56 Kg.mtr = 564.22 Kg MS Gate of Size 7 x 4 feet in MS Square Pipe 40 x 40 x 3.2 mm – 30 ft along with MS Sheet 2mm thick by means of metal welding in weight of 40Kg. The job includes cost of material, tools and tackles, skilled labour, carriage, transportation, 01 coats of metal primer and 02 coats of metal paint to the complete Structure. Total Weight – 1945.05 Kg Weight of Ms-Steel available for the Structure – 850Kg Weight after deduction - 1095.05 Kg
Cool White Linear Bay Anti Glare LED lights to be installed for the Shooting Range of reputed make suitable for Sports. All other accessories like wiring, MCB Box, Switches hooks, frames, ceiling wires also to be included. The cost includes material, tools and tackles, skilled labour, carriage, transportation and all taxes as applicable.
Providing/ Fixing of Pre-painted Galvanized Iron High Profile Sheet for the Roof top and all 04 sides of the Shooting Range having a thickness of 0.50 by means of self locking screws. The job includes material, tools and tackles, skilled labour charges, carriage, transportation, fixing of the new and taxes as applicable. Complete Job PPGI Sheet – 16 x 50 = 800 sft 50 x 12 = 600 sft x 02 sides = 1200 sft 15 x 12 = 180 sft x 02 sides = 360 sft 2360 sft i.e. 219.25 M2 CGI sheets available for the Shooting Range – 50 No i.e. 25 sft x 50 = 1250 sft i.e. 116.12 M2 Total Area for PPGI sheet – 103.13M2
Painting of the available MS-Angle and CGI sheets by means of 01 coat of Rex oxide and 02 coats of metal paint for an even shade as per the PPGI sheets. The job includes cost of material, tools and tackles, skilled labour, carriage, taxes as applicable. Complete Job
Providing and fixing false ceiling with 12 mm thick plain/ semi perforated or with design ceiling tiles of BWP type phenol formaldehyde synthetic resin bonded pressed particle board conforming to IS:3087, finished with a coat of aluminum primer on both sides & edges, including two coats of synthetic enamel paint of approved quality on exposed face, fixed to a grid made out of anodized aluminum (with 15 micron anodic coating) T- sections 35 x15x1.5 mm size main runners, cross runners 23.5 x 19 x1.5 mm fixed to main runners placed 600 mm centre to centre both ways so as to form a grid of 600 mm square. The frame work shall be suspended from ceiling by level adjusting hangers of 6 mm dia. M.S rod fixed to roof slab by means of ceiling cleats and dash fastener. The suspenders shall be placed 600 x 1200 mm centre to centre including fixing to the frame with C.P brass screws and applying a priming coat of primer and paint. Roof area = (50’-0” x 16’-0”) = 800 ft2 = 74.32 m2
Providing / Fixing of 03 Chambered Shooting Range along with fixing of manual silhouette machine 03 No for the Shooter. The job includes separate string system for the Shooting line chamber along with target goggles, noise reducing ear muffs and Pistol Stands and allied items required for the Shooting Range. The job also includes cost on account of installation of 03 No target setting machines for the Shooting Range. The job includes cost of material, tools and tackles, skilled labour, carriage, transportation and all taxes as applicable. Complete Job
ASHOK CHOWDHARY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .