Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC PLOT NO 5 SATHYAM GARDEN UYIRIYAL POONGA ROAD GORIMEDU SALEM 636 008 | SALEM | SALEM | TAMIL NADU | 636008 | ₹3.4 Cr Quoted ₹3.5 Cr | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹3.7 Cr+₹23.5 L (6.69%)Rejected-Finance 2 947 NELLAI NAGAR DHARMAPURI | DHARMAPURI | DHARMAPURI | TAMIL NADU | 636701 | ₹3.7 Cr+₹23.5 L (6.69%) | L2 | Rejected-Finance L2 BIDDER |
| Sl No | Description | Qty | Unit | MANICKAVASAGAM L2 | RAJ ENGINEERING CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete for foundation. In Hard gravelly soil | 999 | cum | 200 ₹1,99,800 Lowest | 300 ₹2,99,700 |
| 2.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete for foundation. In Soft Disintegrated Rock not requiring blasting | 56 | cum | 220 ₹12,320 Lowest | 300 ₹16,800 |
| 3.00 | Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation. In medium rock and dense medium rock not requiring blasting | 55 | cum | 380 ₹20,900 | 300 ₹16,500 Lowest |
| 4.00 | Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for road portion and bus coupler bay. In Hard rock requires wedging & chessling | 256 | cum | 2,000 ₹5,12,000 | 1,000 ₹2,56,000 Lowest |
| 5.00 | PCC 1:3:6, using 20mm HBG machine crushed metal for foundation padding and road work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete. | 486 | cum | 7,000 ₹34,02,000 | 5,000 ₹24,30,000 Lowest |
| 6.00 | RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for Road of 150mm thick with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete but excluding cost of steel reinforcement. | 3,820 | M2 | 3,200 ₹1,22,24,000 | 3,150 ₹1,20,33,000 Lowest |
| 7.00 | RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for Culvert bottom raft with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete but excluding cost of steel reinforcement. | 11 | Cum | 16,000 ₹1,76,000 Lowest | 16,000 ₹1,76,000 Lowest |
| 8.00 | RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for road side kerb wall and culvert side wall with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete but excluding cost of steel reinforcement. | 285 | Cum | 21,000 ₹59,85,000 Lowest | 21,000 ₹59,85,000 Lowest |
| 9.00 | RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for Culvert cast in situ slab with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete but excluding cost of steel reinforcement. | 12 | Cum | 16,000 ₹1,92,000 Lowest | 16,000 ₹1,92,000 Lowest |
| 10.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete. | 44.5 | MT | 1,00,000 ₹44,50,000 | 85,000 ₹37,82,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
26 Mar 2025, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Formation of RCC Road, transporting, erection of 2 Nos. ERS tower with stringing of 3 Nos. Panther conductor,1 No. GI earthwire, Supplying and filling gravel and allied Civil works at Sathumadurai 230 / 110 kV SS
2025_EB_532225_1
TP1-44/2024-25 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
180 days
SATHUMADURAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.9 L
Yes
18 Aug 2025
13 Mar 2025
27 Mar 2025
13 Mar 2025
26 Mar 2025
13 Mar 2025
Amount
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete for foundation. In Hard gravelly soil
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete for foundation. In Soft Disintegrated Rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation. In medium rock and dense medium rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for road portion and bus coupler bay. In Hard rock requires wedging & chessling
PCC 1:3:6, using 20mm HBG machine crushed metal for foundation padding and road work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for Road of 150mm thick with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete but excluding cost of steel reinforcement.
RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for Culvert bottom raft with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete but excluding cost of steel reinforcement.
RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for road side kerb wall and culvert side wall with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete but excluding cost of steel reinforcement.
RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for Culvert cast in situ slab with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete but excluding cost of steel reinforcement.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.
Plastering with CM 1:3, 12mm thick for culvert , Kerb wall including cost of all materials, labour, lead, lift etc., complete.
Refilling the excavated earth including cost of all materials, labour, lead, lift etc., complete.
Removal of excess earth to a distance as required including cost of all materials, labour, lead, lift etc., complete.
Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20 mm thick to full width and depth of 150 mm thick plastering with CM 1:3, 20 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification.
Supplying and filling of gravel from borrow pit including transporting by head load of 100 m inside the yard with lead of 10 Kms or from other quarry to site, watering, consolidation using plate compactor, loading and unloading and other applicable charges etc complete
Outer colour washing with two coats using ready mixed Weather Proof Exterior Emulsion (First quality - Apex or its equivalent) of approved quality and colour over a coat of exterior emulsion water based primer exterior surfaces including through scrapping, clan removal of dirt, cost of all materials, scaffolding, Labour, Lead, Lift etc., complete and including necessary crack filling paste, putty whereever required.
Labour for ERS tower erection which includes survey for location fixing, ERS material sort out at GCC store, ERS material transportation from GCC store (with in tamilnadu) to site, hire charges for crane for material loading, unloading and shifting in site working area, hire charges for JCB for surface leveling and ERS anchoring installation and un installation,safety accerries shoes helmet, hand glous belt, fall arrester rope, ERS anchoring sufficient number of stay, fuel charges for hydralic power unit (petrol, oil for hydralic power unit (hydralic oil cane), ERS material unloading at site, ERS material ground assembling charges, ERS tower erection, insulator hoisting polymer and post insulator), loading of ERS materials and transportation from site to GCC stores (with in Tamilnadu) and devolution in good condition and all supervision, transportation of labour charges etcc complete and as per the direction of TANTRANSCO engineer at site
Labour for ERS system of paying out of conductor and strining of 3 Nos of panther conductor with 1 No.of Earthwire for 3 span in each span and jumpering and dismantling charges which includes ERS tower dismantling, conductor dismantling and recoiling, as per the direction of TANTRANSCO engineer at site
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
MANICKAVASAGAM (BID ID -1277317)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .