Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical UKHRA BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | Accepted-Technical Accepted |
| 2 | Accepted-Technical FANDANESWAR BALDER PARA PASCHIM BARDHAMAN PASCHIM WEST BARDWAN BARDHAMAN 713346 WEST BENGAL INDIA | PASCHIM BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | Accepted-Technical Accepted |
| 3 | Accepted-Technical C O SIKDER P O JHANJRA JHANJRA JHANJRA 713385 WEST BENGAL INDIA | JHANJRA | PASCHIM BARDHAMAN | WEST BENGAL | 713385 | Accepted-Technical Accepted |
Tender Value
₹29.2 L
EMD Value
₹36,500
Closing Date
30 Apr 2026, 6:00 pmClosed
AREA SAFETY OFFICER, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Construction of 06 nos Sectionalisation Stoppings at different places shown in enclosed mine Plan at R V seam at MIC Unit Under JPC
2026_ECL_358431_1
ECL/GM/JNR/MIN.A/26-27/01 Dt. 16.04.2026
Open Tender
Civil Works - Others
Percentage
30 days
Jhanjra Project Colliery
PLEASE REFER TO TENDER DOCUMENTS
4 documents required · 4 mandatory
₹36,500
6 Jun 2026
17 Apr 2026
2 May 2026
17 Apr 2026
30 Apr 2026
18 Apr 2026
17 Apr 2026 - 24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Discription of work | |||||
| 1.01 | Recess cutting by hand in soft stone | 30.6 | CUM | - | - |
| 1.02 | Recess cutting by hand in coal | 48 | CUM | - | - |
| 1.03 | Stone fall cleaning & stacking in regular stack | 102.18 | CUM | - | - |
| 1.04 | Brick work in cement mortar ( cement & sand) with fly ash bricks ( Brick Work) | 234.6 | CUM | - | - |
| 1.05 | Cement plaster (1:6) , 1 m Ring plaster for roof and for sides | 373 | SQM | - | - |
| 1.06 | White washing ( Dounle coat) in UG | 217 | SQM | - | - |
| 1.07 | Loading material( Stone aggregate & Sand) into MUV and unloading at UG | 66.59 | CUM | - | - |
| 1.08 | Loading material (Cement) into MUV and unloading at UG | 15.95 | MT | - | - |
| 1.09 | Loading material (bricks) into MUV and unloading at UG | 91.96 | Per 1000 | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 0.78 MB
BOQ_371303.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .