| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹3.0 LRejected-AOC 319 A MEERAPUR PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹3.0 L | L2 | Rejected-AOC IInd Lowest |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | R.S.ASSOCIATE L2 | M/s Tanishk Enterprises L1 |
|---|---|---|---|---|---|
| 1.00Revetment of foundation of H Pole location No. 5 of 132 KV Rewaroad - Shankargarh S/C Line Under ETD-III,Prayagraj. The job includes the following works:- | |||||
| 1.01 | Cost of Excavation of earth including all earth work,backfilling and levelling. | 11.4 | Cum | 110 ₹1,254 | 80 ₹912 |
| 1.02 | Cost of Concrete with 40mm alone ballast, coarse sand and cement mortar in ratio 1:4:8 in foundation under floor including the cost of all material labour and T&P etc.required for proper completion of work satisfactorily. | 4.56 | Cum | 4,000 ₹18,240 | 3,400 ₹15,504 |
| 1.03 | Cost of concreting for CC top cover on retaining wall of tower including cost of cement etc. with 1:2:4 concrete. | 1.14 | Cum | 7,500 ₹8,550 | 6,500 ₹7,410 |
| 1.04 | 1st class brick work for the construction of retaining wall in 1:4 ratio cement, mortar including the cost of all material, labour and T&P etc. required for proper completion of work satisfactorily. | 50.16 | Cum | 4,500 ₹2.3 L | 4,170 ₹2.1 L |
| 1.05 | Earth filling under floor and in area between tower foundation and retaining wall including the cost of of soil to obtained by the contractor from out side including watering, ramming and dressing of earth etc.complete including the cost of earth, royalty, taxes etc.and cost of material, labour and T&P required for proper completion of work satisfactorily. | 51.48 | Cum | 150 ₹7,722 | 115 ₹5,920.20 |
| 1.06 | 12 mm plaster work on the wall cement and sand in ratio 1:4 including the cost of material, labour and T&P etc.required for proper completion of work satisfactorily | 62.7 | M2 | 100 ₹6,270 | 80 ₹5,016 |
| 1.07 | Making weep holes providing plastic pipe of length 30mtr (cost including the cost of plastic pipe including cutting in accordance size and fitting them in two layers at the span of 2.0mtr at depth of 0.5mtr, 1.25mtr and 2.0mtr respectively from the top of the revettement wall). | 1 | Job. | 2,200 ₹2,200 | 1,700 ₹1,700 |
| 1.08 | Soling of Ist class brick on edge floor including preparation of base to proper slope including cost of all material, labour & T&P etc. required for proper completion of job satisfactorily. | 39 | M2 | 700 ₹27,300 | 800 ₹31,200 |
Tender Value
₹3.7 L
EMD Value
₹4,000
Closing Date
21 Apr 2025, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
Revetment of Tower foundation of H Pole Location No. 5 of 132 KV SC Rewa Road-Shankergarh Line under ETD-III, Prayagraj.
2025_UPTCL_1028368_1
02/ETC-II(P)/2025-2026
Open Tender
Electrical Works
60 days
132 KV S/S SHANKERGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer Electy. Trans. Div. Naini Alld.
₹4,000
7 Mar 2026
16 Apr 2025
22 Apr 2025
16 Apr 2025
21 Apr 2025
16 Apr 2025
Amount
Revetment of foundation of H Pole location No. 5 of 132 KV Rewaroad - Shankargarh S/C Line Under ETD-III,Prayagraj. The job includes the following works:-
Cost of Excavation of earth including all earth work,backfilling and levelling.
Cost of Concrete with 40mm alone ballast, coarse sand and cement mortar in ratio 1:4:8 in foundation under floor including the cost of all material labour and T&P etc.required for proper completion of work satisfactorily.
Cost of concreting for CC top cover on retaining wall of tower including cost of cement etc. with 1:2:4 concrete.
1st class brick work for the construction of retaining wall in 1:4 ratio cement, mortar including the cost of all material, labour and T&P etc. required for proper completion of work satisfactorily.
Earth filling under floor and in area between tower foundation and retaining wall including the cost of of soil to obtained by the contractor from out side including watering, ramming and dressing of earth etc.complete including the cost of earth, royalty, taxes etc.and cost of material, labour and T&P required for proper completion of work satisfactorily.
12 mm plaster work on the wall cement and sand in ratio 1:4 including the cost of material, labour and T&P etc.required for proper completion of work satisfactorily
Making weep holes providing plastic pipe of length 30mtr (cost including the cost of plastic pipe including cutting in accordance size and fitting them in two layers at the span of 2.0mtr at depth of 0.5mtr, 1.25mtr and 2.0mtr respectively from the top of the revettement wall).
Soling of Ist class brick on edge floor including preparation of base to proper slope including cost of all material, labour & T&P etc. required for proper completion of job satisfactorily.
R.S.ASSOCIATE (BID ID -5135548)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf