Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical 0 SATGACHIA BAZAR MEMARI ROAD SATGACHIA BAZAR PURAB BURDWAN WEST BENGAL 713422 | PURBA BARDHAMAN | WEST BENGAL | 713422 | Rejected-Technical NQ Due to less machinery and non-submission of bar chart |
| 2 | Rejected-Technical | Rejected-Technical NQ Due to less turnover and less bank credit facility certificate |
| 3 | Rejected-Technical 47B CANAL EAST ROAD 2ND FLOOR KOLKATA 700011 | KOLKATA | KOLKATA | WEST BENGAL | 700011 | Rejected-Technical NQ Due to improper affidavit and less technical manpower and less laboratory |
Tender Value
₹10.8 Cr
EMD Value
₹10 L
Closing Date
3 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, Presidency Circle-II
Office of the Superintending Engineer, Presidency Circle - II, Panchayats and Rural Development Department Government of West Bengal, Joint Administrative Building, Sector III, Salt Lake, Kolkata 700106
Strengthening of Road from Mallikpole Kamalachak to Basudevpur Narullapara Katra More under Uluberia-II Block
2026_PRD_5022293_4
28/SRDA/N-1/2026-27/09
Open Tender
CIVIL WORKS
Percentage
365 days
Howrah
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10 L
Yes
Office of the S E, Presidency Circle- II
4 Nov 2026
4 Sept 2026
5 Oct 2026
4 Sept 2026
3 Oct 2026
4 Sept 2026
11 Sept 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION WORK | |||||
| 1.1 | TOTAL COST FOR PAVEMENT WORK | 1 | Nos | 7,84,19,011.88 | ₹7,84,19,011.88 |
| 1.2 | TOTAL COST FOR PROTECTION WORK | 1 | Nos | 82,16,690.1 | ₹82,16,690.1 |
| 1.3 | TOTAL COST FOR SIDE DRAIN WORK | 1 | Nos | 13,65,638.77 | ₹13,65,638.77 |
| 1.4 | TOTAL COST FOR INFORMATORY BOARD AND TRAFFIC SAFTY MEASURES WORK | 1 | Nos | 15,96,296.91 | ₹15,96,296.91 |
| 1.5 | COST FOR LABOUR WELFARE CESS @ 1% ON CONSTRUCTION COST | 1 | Nos | 8,95,976.38 | ₹8,95,976.38 |
| 1.6 | COST FOR GST @18% ON CONSTRUCTION COST | 1 | Nos | 1,62,88,850.53 | ₹1,62,88,850.53 |
| 2ROUTINE MAINTENANCE WORK | |||||
| 2.1 | TOTAL COST FOR 1st YEAR ROUTINE MAINTENANCE WORK | 1 | Nos | 1,56,485.64 | ₹1,56,485.64 |
| 2.2 | TOTAL COST FOR 2nd YEAR ROUTINE MAINTENANCE WORK | 1 | Nos | 1,92,940.08 | ₹1,92,940.08 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_5103194.xls
BOQ • 0.31 MB
soq4.pdf
Tender Documents • 3.92 MB
Corri2nit28.pdf
PDF • 0.67 MB
Corri1nit28.pdf
PDF • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .