Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹1.7 LAccepted-Finance | Ist | Accepted-Finance OK | |
| 2 | IInd₹1.9 LAccepted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | IInd | Accepted-Finance OK | |
| 3 | IIIrd₹1.9 LAccepted-Finance | IIIrd | Accepted-Finance OK | |
| 4 | IVth₹2.2 LAccepted-Finance | IVth | Accepted-Finance OK | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.9 L
EMD Value
₹4,000
Closing Date
26 Oct 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ETD-II Agra
Near Amar Ujala Press Sikandra Agra
Replacement of Gas Kit on 63 MVA Transformer at 132 KV S/S Agra Cantt Agra
2021_UPTCL_614566_2
ET-08/ETD-II(A)/21-22
Open Tender
Electrical Works
Lump-sum
120 days
132 KV S/S Agra Cantt
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD-II Agra
₹4,000
27 Oct 2021
16 Oct 2021
26 Oct 2021
16 Oct 2021
26 Oct 2021
16 Oct 2021
90 days
Following work are required to be carried out for replacement of gasket of top cover of 132/33 KV, 63 MVA T/F AREVA T&D INDIA LTD Make installed at 132 Kv S/S Cantt, Agra
Draining the T/F oil from existing 63 MVA T/F AREVA T&D INDIA LTD Make T/F into empty oil drum upto suitable level required for lifting top cover of T/F.
Dismantling of all necessary accessories of 63 MVA T/F required for liftting top cover of T/F. to replace gasket ( Like HV,LV bushing, oil pipe and other).
Attending oil leakage AREVA T&D INDIA LTD Make 132/33 KV 63 MVA T/F by replacement of gasket of good quality rubberized cork sheet of KONIKA/TRABROZE or standred make of the following
HV Side bushing (Top & bottom portion) of R,Y & B Phase.
LV/Netural bushing (Top & bottom portion)
Main tank top cover gasket involving the work of opening nut & bolts of the top cover plate from its present level, cleaning the oil and removing the old damaged gasket by scraping and cleaning the top surface, fabrication of top cover gasket made from cork sheet, joining and punching holes, fitting on top surface, refitting the top cover plate and tightening the nut & bolts for proper completion of the work.
Opening & fixing of all HV & LV side jumpers and HV & LV side neutral bushing.
Erection of all dismentling of accessories of 63 MVA T/F.
Filling of T/F oil into T/F from oil drums/tank.
Centrifuging of oil in the T/F taking the BDV/PPM value of period of 4 HRS as per norms of T/F manufacture fill the desired value are attend. (Approx 26 KL) Centrifuging machine shall be arranged by the contractor at his own cost.
SHIVAM ENTERPRISES
M/S JAI SHREE ENTERPRISES
SHIVAM ENGINEERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .