Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹1.5 Cr+₹2,812.40 (0.02%)Rejected-Finance | L2 | Rejected-Finance High | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD, Tender Fee & Technical Documents not submitted. |
| Sl No | Description | Qty | Unit | Ms AKIN ENTERPRISE L1 | M/s B. T. G. Enterprise L2 |
|---|---|---|---|---|---|
| 1.01SH:- Formation Cutting | |||||
| 1.02 | Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1) | 1,654.7 | Cum | 450 ₹7,44,615 Lowest | 450 ₹7,44,615 Lowest |
| 1.03 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 3,309.39 | Cum | 360 ₹11,91,380.4 Lowest | 360 ₹11,91,380.4 Lowest |
| 1.04 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 3,309.39 | Cum | 373 ₹12,34,402.47 Lowest | 373 ₹12,34,402.47 Lowest |
| 1.05Deduction | |||||
| 1.06 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 2,482.04 | Cum | 2 ₹-4,964.08 Lowest | 2 ₹-4,964.08 Lowest |
| 1.07 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock) | 1,654.7 | Cum | 2 ₹-3,309.4 Lowest | 2 ₹-3,309.4 Lowest |
| 2.00SH:CC Pavement 3.75m width | |||||
| 2.01 | Preparation of sub grade: Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | 2,805.37 | Sqm | 350 ₹9,81,879.5 Lowest | 350 ₹9,81,879.5 Lowest |
| 2.02 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. | 2,805.37 | Sqm | 6.46 ₹18,122.69 Lowest | 6.46 ₹18,122.69 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
23 Mar 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, Doimukh Division, APPWD, Doimukh
O/o the EE, Doimukh Division, APPWD, Doimukh
C/o Link road from PMGSY Bello-III to Community Farming Bello-III, Kimin District Papum Pare.
2026_PWDAP_3144_1
DD/2025-26/21
Open Tender
Civil Works
Works
730 days
Kimin
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE PWD DOimukh
₹1.5 L
28 Oct 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | SH:- Formation Cutting | - | - | - | - |
| 1.02 | Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1) | 1,654.7 | Cum | - | - |
| 1.03 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 3,309.39 | Cum | - | - |
| 1.04 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 3,309.39 | Cum | - | - |
| 1.05 | Deduction | - | - | - | - |
| 1.06 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 2,482.04 | Cum | - | - |
| 1.07 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock) | 1,654.7 | Cum | - | - |
| 2SH:CC Pavement 3.75m width | |||||
| 2.01 | Preparation of sub grade: Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | 2,805.37 | Sqm | - | - |
| 2.02 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. | 2,805.37 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_3338.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
SBD.pdf
Tender Documents • 1.51 MB
BOQ_3338.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .