Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance D 203 SUPERTECH GREEN VILLAGE PARTAPUR HAPUR BY PASS ROAD MEERUT MEERUT UTTAR PRADESH 250002 UDYAM UP 56 0008702 | MEERUT | UTTAR PRADESH | 250002 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹2,000
Closing Date
27 Dec 2019, 12:00 pmClosed
SE ETC II MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
WORK OF CONSTRUCTION OF FIRE HUT FOR FIREFIGHTING EQUIPMENT AT 132KV JALILPUR AND 132 KV S/S MORNA UNDER ELECTRICITY TRANSMISSION DIVISION, BIJNOR.
2019_UPTCL_410874_1
E-T-291/ETC-II/M/2019
Open Tender
Electrical Works
45 days
BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD AMROHA
₹2,000
6 Jan 2020
6 Dec 2019
27 Dec 2019
6 Dec 2019
27 Dec 2019
6 Dec 2019
Amount
work of construction of fire hut for firefighting equipment at 132KV Jalilpur and 132 KV S/S Morna under Electricity Transmission Division, Bijnor. Note: Material i.e. Angle will be provided by department free of cost and all other material will be arranged by contractor at his own cost.
Construction of fire hut for keeping firefighting equipment’s work involve as fabrication of 2 No, 3.0 meter long and 06 No. 2.5 mtr long vertical squire shape support from 50x50x5 mm G.I / M.S angles and welding the piece of 10 cm long 50x50x5mm in bottom for support and size of fire hut 2500x1500 mm complete frame. Excavation of pits of size 300x300x450 cm and concerting of 6 no vertical supports with ratio of 1:2:4 of cement core sand and 20 mm stone ballast in proper level and alignment. Fabrication of top structure from 50x50x5 mm or 65x65x5 mm G.I / M.S angle piece as per requirement. Welding these pieces on vertical support to make the frame of hut shape. Painting the structure of two coats of red colour good quality paint after primer. Supply and fixing of 6.0 mm thick gray colour corrugated asbestos roofing in position with MS “I” nuts & bolt including supply of required material, Labour and T&P etc. Flooring the complete hut by Its bricks work in ratio 1:4 of cement and core sand with 20 mm thick plaster in ratio 1:2 of cement and core sand including this supply of related material and labour and T&P etc. ( G.I /M.S angle of different size will be provided by UPPTCL free of cost)
132 K S/S Jalilpur
132 KV S/S Morna
TIRUPATI ELECTRICALS
JAGAT ELECTRICAL & FABRICATORS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid