Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC 0 AHAMADPUR AHAMADPUR AHAMADPUR JAUNPUR UTTAR PRADESH 222180 | JAUNPUR | UTTAR PRADESH | 222180 | ₹21.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹23.1 LRejected-AOC | ₹23.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹27.9 LRejected-AOC | ₹27.9 L | L3 | Rejected-AOC L3 |
| 4 | L4₹27.9 LRejected-AOC | ₹27.9 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | M/S RAM ASAREY PATEL L4 | M/S SAI CONSTRUCTION L1 | M/S AWADH CONSTRUCTION L2 | ARUN SINGH L3 |
|---|---|---|---|---|---|---|---|
| 1.00Vertical brick lining of Devra pump canal from 0.500 km to 0.800 km including cost of all materials labour T&P etc. as per drawing and direction of Engineer in charge for proper completion of work with maintaining proper water level. | |||||||
| 1.01 | E/W in excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc. | 336 | m3 | 81 ₹27,216 | 61 ₹20,496 | 82 ₹27,552 | 80 ₹26,880 |
| 1.02 | Supply and laying local sand below in foundation C.C including cost of all materials labour T&p etc. | 96 | m3 | 1,540 ₹1.5 L | 502 ₹48,192 | 1,640 ₹1.6 L | 1,540 ₹1.5 L |
| 1.03 | Laying C.C. 1:3:6 in foundation & floor including cost of all materials labours T&P etc. | 144 | m3 | 5,136 ₹7.4 L | 3,850 ₹5.5 L | 4,618 ₹6.6 L | 5,136 ₹7.4 L |
| 1.04 | Brick masonary with 1:4 C.M. including cost of all materials labours T&P etc. | 229.5 | m3 | 6,251 ₹14.3 L | 5,120 ₹11.8 L | 4,900 ₹11.2 L | 6,250 ₹14.3 L |
| 1.05 | C.C 1:2:4 on bed and top of wall including cost of all materials labours T&P etc. | 53.25 | m3 | 6,952 ₹3.7 L | 5,050 ₹2.7 L | 5,084 ₹2.7 L | 6,950 ₹3.7 L |
| 1.06 | Deep struck pointing 1:2 cm on brick masonary including cost of all materials labours T&P etc. | 495 | m2 | 151 ₹74,745 | 111 ₹54,945 | 140 ₹69,300 | 150 ₹74,250 |
Tender Value
₹28.0 L
EMD Value
₹55,907
Closing Date
29 Apr 2026, 5:00 pmClosed
EE
EE MLCD Prayagraj
Vertical brick lining of Devra pump canal from 0.500 km to 0.800 km including cost of all materials labour Tand P etc. as per drawing.
2026_UPIDM_1138800_5
01/EE/MLCD/2026-27
Open Tender
Civil Works
90 days
Dewara Pump Canal
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹55,907
22 May 2026
23 Apr 2026
30 Apr 2026
24 Apr 2026
29 Apr 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Vertical brick lining of Devra pump canal from 0.500 km to 0.800 km including cost of all materials labour T&P etc. as per drawing and direction of Engineer in charge for proper completion of work with maintaining proper water level. | |||||
| 1.01 | E/W in excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc. | - | m3 | - | - |
| 1.02 | Supply and laying local sand below in foundation C.C including cost of all materials labour T&p etc. | - | m3 | - | - |
| 1.03 | Laying C.C. 1:3:6 in foundation & floor including cost of all materials labours T&P etc. | - | m3 | - | - |
| 1.04 | Brick masonary with 1:4 C.M. including cost of all materials labours T&P etc. | - | m3 | - | - |
| 1.05 | C.C 1:2:4 on bed and top of wall including cost of all materials labours T&P etc. | - | m3 | - | - |
| 1.06 | Deep struck pointing 1:2 cm on brick masonary including cost of all materials labours T&P etc. | - | m2 | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.27 MB
TENDER_DOC.pdf
Tender Documents • 1.48 MB
BOQ_2126320.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid