Tender Value
₹64.6 L
EMD Value
₹58,200
Closing Date
8 Sept 2026, 2:30 pm
CE/TP-I/Guindy/Chennai-32
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Enhancement of existing 110/33kV Power transformer capacity from 2x50MVA to 3X50MVA at Oragadam 230/110/33 11kV SS (Civil works)
2026_EB_697608_1
TP1-11/2026-27 of CE/TP-I/CNI
Open Tender
Civil Works
Works
120 days
ORAGADAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹58,200
Yes
24 Aug 2026
24 Aug 2026
9 Sept 2026
24 Aug 2026
8 Sept 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete. | 600 | M2 | - | - |
| 2 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In Hard gravelly soil | 406 | m3 | - | - |
| 3 | Supplying and filling in foundation and basement with M sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 28 | cum | - | - |
| 4 | Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 116 | cum | - | - |
| 5 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 28 | cum | - | - |
| 6 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 55 | cum | - | - |
| 7 | P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 179 | cum | - | - |
| 8 | PCC 1:2:4 mix using 12 to 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. | 62 | cum | - | - |
| 9 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work for plinth including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 4.5 | cum | - | - |
| 10 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.for culvert and cable duct Wall. | 45 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_838652.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].