Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹39.4 L+₹2.0 L (5.23%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹40.0 L+₹2.6 L (6.89%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Amarpal singh L3 | M/S VASUDEV CONSTRUCTION L2 | M/S N.K. CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry ordinary soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | 306.5 | Cum | 35 ₹10,727.49 Lowest | 50 ₹15,324.99 | 71 ₹21,761.49 |
| 2.00 | Centering and shuttring of C:C work I/C rent of Shuttring Material, labour and T&P Required for proper completion of work for slab, Lintel, sun shade , coloumnn & Wall Etc. | 237.45 | sqm | 258.75 ₹61,440.19 Lowest | 500 ₹1,18,725 | 400 ₹94,980 |
| 3.00 | Centering and shuttring of R.C.C/R.B work I/C cost of centering & shuttring up to 3.00 M height. | 442.2 | sqm | 684.25 ₹3,02,575.35 | 400 ₹1,76,880 Lowest | 600 ₹2,65,320 |
| 4.00 | Providing & laying C.C. 1:2:4 (A20 M-15) with cement, coarse sand & aggregate i/c all cost of material, labour T&P etc complete. | 211.65 | Cum | 5,740.56 ₹12,14,989.52 | 5,000 ₹10,58,250 Lowest | 5,200 ₹11,00,580 |
| 5.00 | Providing & laying R.C.C. 1:1.5:3 (A20 M-20) with cement, coarse sand & aggregate i/c all cost of material, labour T&P etc complete. | 250.42 | Cum | 6,461.84 ₹16,18,173.97 | 6,700 ₹16,77,814 | 5,900 ₹14,77,478 Lowest |
| 6.00 | Providing & fixing Steel Reinforcement (Fe 550) including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour, T&P etc. complete. | 5.01 | M.T. | 66,726 ₹3,34,297.26 | 75,000 ₹3,75,750 | 58,000 ₹2,90,580 Lowest |
| 7.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours. | 74.92 | Cum | 4,829.76 ₹3,61,845.62 Lowest | 5,600 ₹4,19,552 | 5,100 ₹3,82,092 |
| 8.00 | Struck deep cement pointing on brick masonary in 1:3 CM including all cast of labour, material T & P etc complete. | 522.93 | Sqm | 122.98 ₹64,309.93 | 100 ₹52,293 Lowest | 130 ₹67,980.9 |
| 9.00 | Finishing wall with weather coat by premium acrylic exterior paint applied @ 3.28 ltr./10sqm (Asian or Berger brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20 kg/10sqm after thoroughly brushing the surface free from motar ropping and other foreign matters and sand papered smooth including supply of all materails labour, tools and plants etc. required for proper completion of the work. | 313.1 | Sqm | 91 ₹28,492.1 Lowest | 122 ₹38,198.2 | 120 ₹37,572 |
| 10.00 | Painting and writting letters(10-30 cm height) including all cost of materials, T&P and labour etc. | 6 | Job | 298.5 ₹1,791 Lowest | 580 ₹3,480 | 400 ₹2,400 |
Tender Value
₹47.4 L
EMD Value
₹96,000
Closing Date
12 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1071640_8
04/SE-1/2025-26
Open Tender
Civil Works
Piece-work
60 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹96,000
SE OFFICE 1ST IWC MEERUT
2 Dec 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
10 Sept 2025
Amount
Earth work in foundation in dry ordinary soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge.
Centering and shuttring of C:C work I/C rent of Shuttring Material, labour and T&P Required for proper completion of work for slab, Lintel, sun shade , coloumnn & Wall Etc.
Centering and shuttring of R.C.C/R.B work I/C cost of centering & shuttring up to 3.00 M height.
Providing & laying C.C. 1:2:4 (A20 M-15) with cement, coarse sand & aggregate i/c all cost of material, labour T&P etc complete.
Providing & laying R.C.C. 1:1.5:3 (A20 M-20) with cement, coarse sand & aggregate i/c all cost of material, labour T&P etc complete.
Providing & fixing Steel Reinforcement (Fe 550) including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour, T&P etc. complete.
Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours.
Struck deep cement pointing on brick masonary in 1:3 CM including all cast of labour, material T & P etc complete.
Finishing wall with weather coat by premium acrylic exterior paint applied @ 3.28 ltr./10sqm (Asian or Berger brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20 kg/10sqm after thoroughly brushing the surface free from motar ropping and other foreign matters and sand papered smooth including supply of all materails labour, tools and plants etc. required for proper completion of the work.
Painting and writting letters(10-30 cm height) including all cost of materials, T&P and labour etc.
M/S VASUDEV CONSTRUCTION (BID ID -5530143)
Amarpal singh (BID ID -5528065)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .